One basic criteria for determining the replacement time of construction
machinery is based on the age , that is, the increase in operating costs of the machine
with time. The key factor which determines and justifies replacement at a given time is
the magnitude of operating costs. This analysis will show a method for replacement
planning and sale of machines in a future time period.
Кључне речи:
Construction Machinery / Cost / Machine replacementИзвор:
6th International Conference Contemporary achievements in civil engineering, 2018, 727-Издавач:
- Građevinski fakultet u Subotici
Институција/група
GraFarTY - CONF AU - Petronijević, Predrag AU - Ivanišević, Nenad AU - Arizanović, Dragan AU - Marinković, Dejan AU - Petrović, Marija PY - 2018 UR - https://grafar.grf.bg.ac.rs/handle/123456789/2344 AB - One basic criteria for determining the replacement time of construction machinery is based on the age , that is, the increase in operating costs of the machine with time. The key factor which determines and justifies replacement at a given time is the magnitude of operating costs. This analysis will show a method for replacement planning and sale of machines in a future time period. PB - Građevinski fakultet u Subotici C3 - 6th International Conference Contemporary achievements in civil engineering T1 - Method in planning construction machinery replacement SP - 727 DO - 10.14415/konferencijaGFS2018.071 ER -
@conference{ author = "Petronijević, Predrag and Ivanišević, Nenad and Arizanović, Dragan and Marinković, Dejan and Petrović, Marija", year = "2018", abstract = "One basic criteria for determining the replacement time of construction machinery is based on the age , that is, the increase in operating costs of the machine with time. The key factor which determines and justifies replacement at a given time is the magnitude of operating costs. This analysis will show a method for replacement planning and sale of machines in a future time period.", publisher = "Građevinski fakultet u Subotici", journal = "6th International Conference Contemporary achievements in civil engineering", title = "Method in planning construction machinery replacement", pages = "727", doi = "10.14415/konferencijaGFS2018.071" }
Petronijević, P., Ivanišević, N., Arizanović, D., Marinković, D.,& Petrović, M.. (2018). Method in planning construction machinery replacement. in 6th International Conference Contemporary achievements in civil engineering Građevinski fakultet u Subotici., 727. https://doi.org/10.14415/konferencijaGFS2018.071
Petronijević P, Ivanišević N, Arizanović D, Marinković D, Petrović M. Method in planning construction machinery replacement. in 6th International Conference Contemporary achievements in civil engineering. 2018;:727. doi:10.14415/konferencijaGFS2018.071 .
Petronijević, Predrag, Ivanišević, Nenad, Arizanović, Dragan, Marinković, Dejan, Petrović, Marija, "Method in planning construction machinery replacement" in 6th International Conference Contemporary achievements in civil engineering (2018):727, https://doi.org/10.14415/konferencijaGFS2018.071 . .