Measurements in Belgrade sewer system
Merenja na Beogradskom kanalizacionom sistemu
Apstrakt
The installation of monitoring system at 8 sewer outlets of Belgrade Sewer System has started during 2007. In this paper the extension of that process is presented, where 5 new monitoring sites were equipped and new Supervisory and Control unit established with powerful SCADA and network-based software. All hardware and software were developed in Serbia, which leads to lower installation and maintenance costs and easier customization to locale needs. It is concluded at the end of the paper that Belgrade Sewer System has just started the process of systematic monitoring and that new monitoring sites are to be introduced, mostly at the larger storm water outlets and within the system itself. .
Monitoring izliva Beogradskog Kanalizacionog Sistema (BKS) je započeo 2007. godine postavljanjem prvih 8 mernih mesta. U radu se daje prikaz nastavka procesa uspostavljanja monitoringa. Postavljeno je 5 novih mernih mesta i napravljen je Kontrolno Upravljački Centar opremljen savremenim SCADA sistemom sa odgovarajućom programskom podrškom. Sva razvijena oprema je domaće proizvodnje, čime se omogućava jeftinije održavanje i lakše prilagođavanje lokalnim uslovima. Na kraju rada se zaključuje da je BKS uspešno započeo svoje opremanje monitoring sistema, ali da treba da nastavi i sa monitoringom kišnih izliva kao i stanja unutar same mreže. .
Ključne reči:
monitoring / SCADA / flow measurement / water quality measurement / monitoring / SCADA / merenje protoka / merenje kvaliteta vodeIzvor:
Voda i sanitarna tehnika, 2009, 39, 4, 69-80Izdavač:
- Udruženje za tehnologiju vode i sanitarno inžinjerstvo, Beograd
Kolekcije
Institucija/grupa
GraFarTY - JOUR AU - Prodanović, Dušan AU - Vojt, Predrag AU - Despotović, Željko AU - Vučurević, Veljko PY - 2009 UR - https://grafar.grf.bg.ac.rs/handle/123456789/240 AB - The installation of monitoring system at 8 sewer outlets of Belgrade Sewer System has started during 2007. In this paper the extension of that process is presented, where 5 new monitoring sites were equipped and new Supervisory and Control unit established with powerful SCADA and network-based software. All hardware and software were developed in Serbia, which leads to lower installation and maintenance costs and easier customization to locale needs. It is concluded at the end of the paper that Belgrade Sewer System has just started the process of systematic monitoring and that new monitoring sites are to be introduced, mostly at the larger storm water outlets and within the system itself. . AB - Monitoring izliva Beogradskog Kanalizacionog Sistema (BKS) je započeo 2007. godine postavljanjem prvih 8 mernih mesta. U radu se daje prikaz nastavka procesa uspostavljanja monitoringa. Postavljeno je 5 novih mernih mesta i napravljen je Kontrolno Upravljački Centar opremljen savremenim SCADA sistemom sa odgovarajućom programskom podrškom. Sva razvijena oprema je domaće proizvodnje, čime se omogućava jeftinije održavanje i lakše prilagođavanje lokalnim uslovima. Na kraju rada se zaključuje da je BKS uspešno započeo svoje opremanje monitoring sistema, ali da treba da nastavi i sa monitoringom kišnih izliva kao i stanja unutar same mreže. . PB - Udruženje za tehnologiju vode i sanitarno inžinjerstvo, Beograd T2 - Voda i sanitarna tehnika T1 - Measurements in Belgrade sewer system T1 - Merenja na Beogradskom kanalizacionom sistemu EP - 80 IS - 4 SP - 69 VL - 39 UR - https://hdl.handle.net/21.15107/rcub_grafar_240 ER -
@article{ author = "Prodanović, Dušan and Vojt, Predrag and Despotović, Željko and Vučurević, Veljko", year = "2009", abstract = "The installation of monitoring system at 8 sewer outlets of Belgrade Sewer System has started during 2007. In this paper the extension of that process is presented, where 5 new monitoring sites were equipped and new Supervisory and Control unit established with powerful SCADA and network-based software. All hardware and software were developed in Serbia, which leads to lower installation and maintenance costs and easier customization to locale needs. It is concluded at the end of the paper that Belgrade Sewer System has just started the process of systematic monitoring and that new monitoring sites are to be introduced, mostly at the larger storm water outlets and within the system itself. ., Monitoring izliva Beogradskog Kanalizacionog Sistema (BKS) je započeo 2007. godine postavljanjem prvih 8 mernih mesta. U radu se daje prikaz nastavka procesa uspostavljanja monitoringa. Postavljeno je 5 novih mernih mesta i napravljen je Kontrolno Upravljački Centar opremljen savremenim SCADA sistemom sa odgovarajućom programskom podrškom. Sva razvijena oprema je domaće proizvodnje, čime se omogućava jeftinije održavanje i lakše prilagođavanje lokalnim uslovima. Na kraju rada se zaključuje da je BKS uspešno započeo svoje opremanje monitoring sistema, ali da treba da nastavi i sa monitoringom kišnih izliva kao i stanja unutar same mreže. .", publisher = "Udruženje za tehnologiju vode i sanitarno inžinjerstvo, Beograd", journal = "Voda i sanitarna tehnika", title = "Measurements in Belgrade sewer system, Merenja na Beogradskom kanalizacionom sistemu", pages = "80-69", number = "4", volume = "39", url = "https://hdl.handle.net/21.15107/rcub_grafar_240" }
Prodanović, D., Vojt, P., Despotović, Ž.,& Vučurević, V.. (2009). Measurements in Belgrade sewer system. in Voda i sanitarna tehnika Udruženje za tehnologiju vode i sanitarno inžinjerstvo, Beograd., 39(4), 69-80. https://hdl.handle.net/21.15107/rcub_grafar_240
Prodanović D, Vojt P, Despotović Ž, Vučurević V. Measurements in Belgrade sewer system. in Voda i sanitarna tehnika. 2009;39(4):69-80. https://hdl.handle.net/21.15107/rcub_grafar_240 .
Prodanović, Dušan, Vojt, Predrag, Despotović, Željko, Vučurević, Veljko, "Measurements in Belgrade sewer system" in Voda i sanitarna tehnika, 39, no. 4 (2009):69-80, https://hdl.handle.net/21.15107/rcub_grafar_240 .