@conference{
author = "Ivanišević, Nenad and Arizanović, Dragan and Petronijević, Predrag and Mikić, Miljan",
year = "2014",
abstract = "In order to achieve the economic development of the Republic of Serbia, it is necessary to provide adequate traffic infrastructure, particularly highways. The second lane on the northern branch of Corridor X (E-75) from Horgoš to Belgrade has been completed, and the construction works on the eastern branch (E-80) from Niš to the Bulgarian border and on the southern branch (E-75) from Leskovac to the Macedonian border are ongoing. Works are also in progress on the Belgrade bypass. Works on the E-763 ("Corridor 11") are executed between Obrenovac and Preljina. Continuation of this road towards Montenegro is being prepared. Also preparations for the highway on the E-761 from Pojate to Preljina are ongoing., U cilju ostvarivanja ekonomskog razvoja Republike Srbije neophodno je obezbediti odgovarajuću saobraćanu infrastrukturu, a naročito autoputsku. Završena je izgradnja druge trake na severnom kraku Koridora X (E-75) od Horgoša do Beograda, a u toku je izvođenje radova na istočnom kraku (E-80) od Niša do granice sa Bugarskom i južnom kraku (E-75) od Leskovca do granice sa Makedonijom. Takođe su u toku radovi na obilaznici Beograda. Radovi na E-763 (“Koridor 11”) se izvode od Obrenovca do Preljine, a u pripremi je nastavak ovog puta prema Crnoj Gori kao i autoput na E-761 od Pojata do Preljine",
publisher = "Društvo građevinskih konstruktera, Beograd",
journal = "Zbornik radova / DGKS Društvo građevinskih konstruktera Srbije, 14. kongres, Novi Sad, 24-26. oktobar, 2014",
title = "Current strategy for highway construction in the Republic of Serbia, Aktuelna strategija realizacije izgradnje autoputeva u Republici Srbiji",
pages = "120-109",
url = "https://hdl.handle.net/21.15107/rcub_grafar_1250"
}