Претраживање
Приказ резултата 1-1 од 1
Comparative Analysis of Alternative Solutions of Excavation for Section of Hydropower Tunnel HPP "Dabar"
(Springer Verlag, 2018)
The subject of this paper is a comparative analysis of the alternative solutions for the construction of the supply tunnel section of HPP "Dabar" from km 4 + 272.54 to km 12 + 125.0 with the application of TBM technology, ...