Search
Now showing items 1-10 of 36
Problems of the design and construction of slab between floors
(Tehnički vjesnik, 2014)
This paper gives a brief overview of building floor slabs starting from slabs with wooden beams to the present reinforced concrete (panels AB). The authors in this paper analyze some new logical views on the issue of ...
Long-term behavior of continuous girders made from precast elements
(TTEM journal / Tecnics Technologies Education Management, 2014)
The validation of stormwater biofilters for micropollutant removal using in situ challenge tests
(Elsevier, 2014)
Stormwater harvesting is becoming a popular alternative water resource in water stressed regions. Stormwater biofilters have been recognized as being among the most promising pre-treatment technologies. In this study, a ...
Modelling of bridge elements deterioration for Serbian bridge inventory
(Taylor and Francis Ltd., 2014)
In order to improve bridge management practice for public roads in Serbia, a deterioration model for bridge elements was developed using condition data collected over the last 20 years. The distribution of condition data ...
Bridge failure modes due to local scour
(Taylor and Francis - Balkema, 2014)
The scour and in particular the local scour induced by flooding events is the predominant cause of bridge collapses and thus severing the related road link with adverse consequences for the road users and the society in ...
Time-inhomogenous Markov chains in the bridge management
(Taylor and Francis - Balkema, 2014)
Available Bridge Management Systems vary in detail, but generally they comprise a deterioration model to predict condition development and a preservation optimization model to determine the optimum preservation policy. ...
Assessing the financial feasibility of availability payment PPP projects
(American Society of Civil Engineers (ASCE), 2014)
Over the last couple of decades there has been an increased contribution of the private sector to finance infrastructure projects. However, in view of the current global financial crisis, it has become more difficult for ...
Developing Cost Estimation Models for Road Rehabilitation and Reconstruction: Case Study of Projects in Europe and Central Asia
(Journal of Construction Engineering and Management, 2014)
This paper presents the development of prediction models for the unit costs of road works that could be applied to strategic planning of road works at the network level. A specialized data set was used, which was generated ...
GIS Based Estimation of Sediment Discharge and Areas of Soil Erosion and Deposition for the Torrential Lukovska River Catchment in Serbia
(Kluwer Academic Publishers, 2014)
In the present study the SHETRAN river basin modelling system was used in conjunction with Geographic Information System (GIS) to estimate potential erosion and deposition rates within the catchment and the concentrations ...
Layerwise solution of free vibrations and buckling of laminated composite and sandwich plates with embedded delaminations
(Elsevier Ltd, 2014)
Layerwise plate theory of Reddy, extended for the analysis of delaminations, has served as a basis for development of enriched finite elements. The proposed model assumes layerwise linear variation of in-plane displacements ...