Productivity planning and control on construction projects / Planiranje i kontrola produktivnosti na građevinskim projektima
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2015)
In this paper, traditional as well as contemporary approaches to productivity planning and control are analyzed and potential improvements are suggested. A new approach is proposed. It is based on: applying separate measures ...
Railway transport competitiveness - Ecological aspect
(Izgradnja, 2015)
Implementation of value engineering on residential projects / Primena vrednosnog inženjerstva na projektima izgradnje stambeno-poslovnih objekata
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2015)
For the purpose of further affirmation of value engineering (VE), this paper gives a contribution in developing procedures for the practical application of VE on residential projects. In accordance with the theoretical ...
Axially capacity of the CFT columns / Aksijalna nosivost CFT stubova
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2015)
This paper analyzes the axial load capacity of CFT columns according to the following standards and codes: EC 4, ACI, AS, AISC, AIJ, DL/T. The influence of the confinement concrete core by steel tube, ratio d/t i e/d, ...
Kvalitet geometrije koloseka
(Izgradnja, 2015)
Database for management of concrete batch plant work / Baza podataka za upravljanje radom fabrike betona
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2015)
A relational database that is designed and implemented for use in one concrete batch plant, with maximal production 30 m3/h, is presented in this paper. The database is developed using programming package Microsoft Access ...