Prikaz osnovnih podataka o dokumentu

Rekonstrukcija sifona u hidroelektrani „Zvornik“

dc.creatorKuzmanović, Vladan
dc.creatorKoković, Veljko
dc.creatorSpremić, Milan
dc.date.accessioned2019-04-30T13:23:12Z
dc.date.available2019-04-30T13:23:12Z
dc.date.issued2016
dc.identifier.isbn978-86-7892-839-0
dc.identifier.urihttps://grafar.grf.bg.ac.rs/handle/123456789/1460
dc.description.abstractSixty years after the construction of HPP Zvornik, revitalization of the agregate A1 began. An increase in the installed capacity is provided by the water flow rate rise and the replacement of turbine generators. To make this possible, it is necessary to modify the geometry of the tube cone below the unit. Civil engineering part of the reconstruction works includes: dismantling of the existing steel tube cone lining, removal of the surrounding secondary concrete, assembling the new steel draft tube cone and connecting it with the existing dam concrete structure.en
dc.publisherDruštvo građevinskih konstruktera Srbije, Beograd
dc.rightsopenAccess
dc.rights.urihttps://creativecommons.org/licenses/by-nc-nd/4.0/
dc.sourceZbornik radova / Društvо građevinskih konstruktera Srbije, Simpozijum 2016, 15-17. septembar, Zlatiboren
dc.titleRevitalization of "Zvornik" Hydropower Plamten
dc.titleRekonstrukcija sifona u hidroelektrani „Zvornik“sr
dc.typeconferenceObject
dc.rights.licenseBY-NC-ND
dc.citation.epage990
dc.citation.other: 983-990
dc.citation.spage983
dc.identifier.rcubhttps://hdl.handle.net/21.15107/rcub_grafar_1460
dc.type.versionpublishedVersion


Dokumenti

DatotekeVeličinaFormatPregled

Uz ovaj zapis nema datoteka.

Ovaj dokument se pojavljuje u sledećim kolekcijama

Prikaz osnovnih podataka o dokumentu