Претраживање
Приказ резултата 1-2 од 2
Bolted shear connectors vs. headed studs behaviour in push-out tests
(Journal of Constructional Steel Research, 2013)
Prefabrication of concrete slabs reduces construction time for composite steel-concrete buildings and bridges. Different alternatives for shear connectors (bolts and headed studs) are analysed here to gain better insight ...
Resistance of cold-formed built-up stainless steel columns - Part II: Numerical simulation
(Elsevier Ltd, 2018)
In parallel with an experimental investigation of the flexural buckling behaviour of built-up stainless steel columns presented in the accompanying paper (Dobric et al., submitted for publication), a detailed Finite Element ...