Претраживање
Приказ резултата 1-10 од 35
Estimating demands for water supply under reduced pressure / Procena ukupnih potreba za vodom pri smanjenju pritiska
(Jugoslovensko društvo za odvodnjavanje i navodnjavanje, Beograd, 2014)
Many water utilities, continue to operate inefficient water distribution systems (WDSs) with a significant amount of water and revenue losses. This paper investigates the potentials of the available pressure management ...
Internal stochastic structure of annual discharge time series of Serbia’s large rivers
(Serbian Water Pollution Control Society, Belgrade, 2014)
The internal structure of hydrologic processes is discussed in the paper. Time series of mean annual river discharges are assessed to determine their stationarity, trend and periodicity. The time series of annual discharges ...
Scale modeling of the Bouzina Dam flood mitigation structures
(Serbian Water Pollution Control Society, Belgrade, 2014)
The design of the RCC (roller-compacted concrete) Bouzina Dam (Batna Province, Algeria) was verified using a scale model. The length scale of the physical model was 1:40 and the hydraulic parameters were scaled applying ...
Flood frequency analysis at gauged sites: Need for a change in approach / Statistička analiza velikih voda na profilima hidroloških stanica - potreba za promenom pristupa
(Jugoslovensko društvo za odvodnjavanje i navodnjavanje, Beograd, 2014)
In most developed countries, practices and research results are translated into standards or guidelines for flood flow assessment, usually with the compulsory application in the design and exploitation of hydraulic structures ...
The validation of stormwater biofilters for micropollutant removal using in situ challenge tests
(Elsevier, 2014)
Stormwater harvesting is becoming a popular alternative water resource in water stressed regions. Stormwater biofilters have been recognized as being among the most promising pre-treatment technologies. In this study, a ...
One example of creating flood risk maps in Serbia / Jedan primer kartiranja rizika od poplava u Srbiji
(Udruženje za tehnologiju vode i sanitarno inžinjerstvo, Beograd, 2014)
This paper deals with problems of creating flood risk maps, considering methodology and problems of its implementation in practice. A case study, pertaining to production of flood hazard and flood risk maps for municipality ...
Air-water flow on a labyrinth spillway
(Serbian Water Pollution Control Society, Belgrade, 2014)
The design of the Beni Slimane Dam (Medea Province, Algeria) was verified by scale model analyses, conducted on two separate scale models: a partial model of labyrinth spillway and a complete model of spillway structures. ...
Hidrometeorološki aspekti poplava u maju 2014. na slivu reke Save i u Srbiji
(Voda i sanitarna tehnika, 2014)
Multi-Temporal Analysis of Mean Annual and Seasonal Stream Flow Trends, Including Periodicity and Multiple Non-Linear Regression
(Kluwer Academic Publishers, 2014)
Global warming affects the hydrological cycle and the long-term water budget of river basins. Flow variations have been noticed in the Danube River Basin, especially in its south-western parts where a downward trend in ...