Претраживање
Приказ резултата 11-20 од 27
Real-time forecasting urban drainage models: full or simplified networks?
(Water Science and Technology, 2010)
Lead time between rainfall prediction results and flood prediction results obtained by hydraulic simulations is one of the crucial factors in the implementation of real-time flood forecasting systems. Therefore, hydraulic ...
Extreme flood reconstruction by using the 3DNet platform for hydrological modelling
(Journal of Hydroinformatics, 2018)
Notwithstanding recent advances in hydrological modelling, flood simulations remain challenging since many processes must be simulated with high computational efficiency. This paper presents a novel geographic information ...
Ski jump design
(Proceedings of the Institution of Civil Engineers-Water Management, 2010)
This paper is concerned with ski jump design for overflow dams and chute spillways. Despite the vast scope of literature on this subject, research in this field is still needed. Three important issues are addressed: take-off ...
A normalized regression based regional model for generating flows at ungauged basins
(Water Science and Technology, 2013)
Revision of existing methodologies for generating monthly-flow series at ungauged basins based on multivariate nonlinear correlation has led to a simple two-parameter model. While the existing methodology used hydrological, ...
Speeding up the water distribution network design optimization using the Delta Q method
(IWA Publishing, 2016)
To optimize the design of a water distribution network (WDN), a large number of possible solutions need to be examined; hence computation efficiency is an important issue. To accelerate the computation, one can use more ...
Experimental Study on Scour at a Sharp-Nose Bridge Pier with Debris Blockage
(American Society of Civil Engineers (ASCE), 2018)
Previous experimental research on the effects of debris on pier scour has focused primarily on circular and rectangular piers with debris present just under flow free surface. Debris-induced scour around sharp-nose piers, ...
Stormwater biofilters: A new validation modelling tool
(Elsevier, 2016)
Stormwater biofilters must be validated before they can be a trusted component of the treatment train used for water supply augmentation. Currently, only in situ challenge testing is accepted for treatment validation, yet ...
Stochastic structure of annual discharges of large European rivers
(Versita, 2015)
Water resource has become a guarantee for sustainable development on both local and global scales. Exploiting water resources involves development of hydrological models for water management planning. In this paper we ...
Enhanced Arsenic Removal from Water by Activated Red Mud Based on Hydrated Iron(III) and Titan(IV) Oxides
(Chemical Engineering Communications, 2012)
In this study, acid heat-activated neutralized red mud (AB) was promoted as an efficient sorbent for the removal of inorganic arsenic from water. Three sorbents: neutralized red mud (Bauxsol), acid-treated Bauxsol (aBauxsol), ...
Spatial variations in the distribution of trace ionic impurities in the water-steam cycle in a thermal power plant based on a multivariate statistical approach
(Central European Journal of Chemistry, 2013)
In this study, a multivariate statistical approach was used to identify the key variables responsible for process water quality in a power plant. The ion species that could cause corrosion in one of the major thermal power ...