Search
Now showing items 1-3 of 3
Project Level Pavement Management Optimization Procedure Combining Optimal Control Theory and HDM-4 Models
(Institut Francais des Sciences et Technologies des Transports, de l'Aménagement et des Réseaux (IFSTTAR),, 2014)
The paper presents an optimal control theory-based procedure for finding the optimal timing and intensity of pavement maintenance treatments, which was adjusted based on the models for pavement deterioration and road user ...
Valuing an option to abandon a PPP toll road project
(Institut Francais des Sciences et Technologies des Transports, de l'Aménagement et des Réseaux (IFSTTAR),, 2014)
Public-Private Partnerships (PPPs) are used worldwide as a method. History of PPP transportation projects such as toll assessment process of PPP projects has that may occur over a longer time horizon in a more realistic ...
Integration of material-science based performance models into PMS
(Institut Francais des Sciences et Technologies des Transports, de l'Aménagement et des Réseaux (IFSTTAR),, 2014)
The integration of material-science based performance models obtained from laboratory performance testing and modelling into life-cycle-assessment of road pavements is a future oriented approach for the improvement of ...