Pretraživanje
Prikaz rezultata 141-144 od 144
2010 Kraljevo Earthquake Recovery Process Metrics Derived from Recorded Reconstruction Data
(16th European Conference on Earthquake Engineering, 2018)
Earthquake resilience starts with a sudden drop of performance when an earthquake strikes followed by a relatively long recovery phase. The dynamics and volume of investment directly affect the rate and level of recovery. ...
The impact of architectural conceptual design on profit / Značaj arhitektonskog koncepta za rentabilnost projekata
(Građevinski fakultet, Subotica, 2014)
Review of the method for extension of time on project with a case study
(14th International Scientific Conference “iNDiS 2018”, Novi Sad, November 21-23, 2018, 2018)
Tokom realiazacije projekta česta su kašnjenja od strane svih učesnika na projektu. Analiza kašnjenja ima za cilj ne samo kvantifikaciju ukupnog kašnjenja na projektu, već i determinaciju i raspodelu uticaja svakog od ...
Keyphrases analysis of BIM standards through occurrence of most common BIM uses
(The 8th PSU-UNS International Conference on Engineering and Technology (ICET-2017), Novi Sad, Serbia, June 8-10, 2017 University of Novi Sad, Faculty of Technical Sciences, 2017)
The 8th PSU-UNS International Conference on Engineering and
Technology (ICET-2017), Novi Sad, Serbia, June 8-10, 2017
University of Novi Sad, Faculty of Technical Sciences
Abstract: Building Information Modeling (BIM) ...