Претраживање
Приказ резултата 11-20 од 26
Uticaj Covid-19 na odštetne zahteve za produžetak roka i dodatna plaćanja u FIDIC uslovima ugovora
(Beograd, Srbija : Univerzitet u Beogradu Građevinski fakultetBeograd, Srbija : Društvo građevinskih konstruktera Srbije, 2021)
Cilj ovog istraživanja je analiziranje praktičnih ugovornih problema izazvanih pandemijom virusa COVID-19, a koji se javljaju na građevinskim projektima ugovorenim u skladu sa FIDIC uslovima ugovora za izgradnju. Polazeći ...
The impact of COVID-19 on the realization of Public-Private Partnerships projects
(Subotica, Srbija : Универзитет у Новом Саду Грађевински факултет Суботица, 2021)
The aim of this research is to present the practical problems in the realization of public-private partnerships projects that are arising as a consequence of COVID-19 and which occurs on construction projects contracted ...
Alokacija i izbor mehanizacije za betonske radove korišćenjem Fuzzy linearnog programiranja
(Beograd, Srbija : Univerzitet u Beogradu Građevinski fakultetBeograd, Srbija : Društvo građevinskih konstruktera Srbije, 2021)
Cilj ovog istraživanja je fokusiran na problem alokacije i selekcije građevinske mehanizacije sa
kojim se građevinske firme suočavaju prilikom konkurisanja za građevinske projekte. Primarni
cilj u izboru građevinske ...
Allocation and Selection of equipment for concrete works using Fuzzy Linear Programming
(Belgrade, Serbia: Society for Materials and Structures Testing of SerbiaBelgrade, Serbia: University of Belgrade Faculty of Civil EngineeringBelgrade, Serbia : Association of Structural Engineers of Serbia, 2021)
The aim of this research is focused on the problem of allocation and selection of the construction equipment when construction firms bid for construction projects. The main objective of the selection of construction equipment ...
Application of Artificial Intelligence for the Estimation of Concrete and Reinforcement Consumption in the Construction of Integral Bridges
(Hindawi, 2020)
Estimation of basic material consumption in civil engineering is very important in the initial phases of project implementation. Its
importance is reflected in the impact of material quantities on forming the prices of ...
Urban mining potential in Serbia: Case study of residential building material stock
(Building Materials and Structures, 2022)
As governments worldwide attempt to develop sustainable waste management strategies, massive amounts of waste have been accumulating. However, developing an effective waste management strategy requires a thorough understanding ...
Early Highway Construction Cost Estimation: Selection of Key Cost Drivers
(MDPI, 2023)
Cost estimates in the early stages of project development are essential for making the right deci-sions, but they are a huge challenge and risk for owners and potential contractors due to limited information about the ...
Primena AHP metode višekriterijumske optimizacije za izbor krana na velikim investicionim projektima
(Univerzitet u Beogradu, Saobraćajni fakultet, 2020)
Izbor krana na velikim investicionim projektima predstavlja rizičnu aktivnost za postizanje osnovnih
ciljeva projeka. Kao posledica lošeg izbora krana mogu se javiti kašnjenja zbog loše organizacije, kao i prekoračenje ...
Experimental determination of dynamic parameters of heat passage through the facade wall of a weekend cottage on mountain Kopaonik, Serbia
(Faculty of civil engineering and architecture / University of Niš and Serbian academy of sciences and arts - branch in Niš, 2023)
In this paper, using a dynamic RC model for heat transfer in a room on the ground floor,
the three-time constants of heat transfer that corresponds to the different parts of a
weekend cottage on Kopaonik were determined. ...
Urban Energy Mapping: Best Practices and Perspectives of Implementation and Application in Serbia
(The University of Niš, Faculty of Mechanical Engineering, Department of Thermal Engineering and Society of Thermal Engineers of Serbia, 2022)