Optimalna politika održavanja drumskih mostova u Srbiji
(Put i saobraćaj, 2015)
Application of semi-Markov decision process in bridge management
(International Association for Bridge and Structural Engineering (IABSE), 2015)
The state-of-the-art Bridge Management Systems (BMSs) feature tightly coupled deterioration and preservation optimization model that enable determining the most cost-effective maintenance strategies at both the project and ...
Tehnologija građevinskih radova
(Građevinski fakultet u Beogradu, 2015)
Upravljanje rizicima pri izgradnji kapitalnih infrastrukturnih objekata u cilju poboljšanja njihove održivosti / Risk management during planning and construction of large infrastructure projects for improving their sustainability
(Универзитет у Београду, Грађевински факултет, 2015)
Investicioni projekat u građevinarstvu se definiše kao kompleksan tehničko-tehnološki,organizacioni, pravni, ekonomski i finansijski poduhvat koji se sastoji od skupakoordinisanih i kontrolisanih aktivnosti sa jasno ...
Određivanje rezidualne vrednosti građevinskih mašina
(YUPMA - Udruženje za upravljanje projektima Srbije, 2015)
Rezidualna vrednost, ili vrednost polovne mašine definiše se kao cena za koju se korišćena mehanizacija može prodati na tržtu u određenom periodu. Ovo istraživanje ima za cilj da pomogne razvoju kreiranja regresionog modela ...
Database for management of concrete batch plant work / Baza podataka za upravljanje radom fabrike betona
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2015)
A relational database that is designed and implemented for use in one concrete batch plant, with maximal production 30 m3/h, is presented in this paper. The database is developed using programming package Microsoft Access ...
AHP based contractor selection procedure for highway infrastructure projects in Serbia
(Croatian Association for Construction Management ; University of Zagreb, Faculty of Civil Engineering, Zagreb, 2015)
Application of Fuzzy AHP Method for Choice of Objects for Maintenance and Reconstruction
(Savez građevinskih inženjera Srbije, 2015)
The choice of objects for maintenance and reconstruction using Fuzzy AHP (Analytic Hierarchy Process) method will be presented in this paper. This method, as one of the efficient methods for multicriteria decision making ...
Pouzdanost, raspoloživost i očekivani radni učinci sistema građevinskih mašina sa rasplinutim (fuzzy) ulaznim parametrima
(Institut za istraživanja i projektovanja u privredi, 2015)
U ovome radu se prikazuje procedura određivanja pouzdanosti, raspoloživosti i očekivanih radnih
učinaka sistema građevinskih mašina za izvođenje građevinskih radova (betonski radovi, zemljani radovi,
radovi u steni, ...
Post-projektna analiza – studija slučaja za linijski infrastrukturni objekat
(Šesti međunarodni naučno-stručni simpozijum Instalacije i arhitektura, Beograd, 10. decembar 2015., 2015)
Post-projektnu analizu čine sve aktivnosti čiji je cilj sagledavanje parametara kako je objekat izveden, uključujući i to u kojoj meri on ispunjava projektovane zahteve, kao i to u kom stepenu su sami korisnici zadovoljni ...