Search
Now showing items 81-87 of 87
Determination of the temperature transfer function of building constructions based on measurement data
(Materials Research Society of Serbia, 04-01-2015)
In this paper a method of determination of transfer function for temperature measured inside and outside residential building in Belgrade is presented. The instantaneous measurements of indoor temperature inside a living ...
Review of the method for extension of time on project with a case study
(14th International Scientific Conference “iNDiS 2018”, Novi Sad, November 21-23, 2018, 2018)
Tokom realiazacije projekta česta su kašnjenja od strane svih učesnika na projektu. Analiza kašnjenja ima za cilj ne samo kvantifikaciju ukupnog kašnjenja na projektu, već i determinaciju i raspodelu uticaja svakog od ...
The impact of architectural conceptual design on profit / Značaj arhitektonskog koncepta za rentabilnost projekata
(Građevinski fakultet, Subotica, 2014)
Primena Fuzzy TOPSIS metode za višekriterijumski izbor objekata za rekonstrukciju i održavanje
(Savez građevinskih inženjera Srbije, 2011)
U ovom radu je dat prikaz predloženog postupka za višekriterijumsko rangiranje alternativa Fuzzy TOPSIS koji je primenjen za određivanje optimalne raspodele investicionoh sredstava za održavanje građevinskih objekata i ...
Application of Fuzzy AHP Method for Choice of Objects for Maintenance and Reconstruction
(Savez građevinskih inženjera Srbije, 2015)
The choice of objects for maintenance and reconstruction using Fuzzy AHP (Analytic Hierarchy Process) method will be presented in this paper. This method, as one of the efficient methods for multicriteria decision making ...
Keyphrases analysis of BIM standards through occurrence of most common BIM uses
(The 8th PSU-UNS International Conference on Engineering and Technology (ICET-2017), Novi Sad, Serbia, June 8-10, 2017 University of Novi Sad, Faculty of Technical Sciences, 2017)
The 8th PSU-UNS International Conference on Engineering and
Technology (ICET-2017), Novi Sad, Serbia, June 8-10, 2017
University of Novi Sad, Faculty of Technical Sciences
Abstract: Building Information Modeling (BIM) ...
2010 Kraljevo Earthquake Recovery Process Metrics Derived from Recorded Reconstruction Data
(16th European Conference on Earthquake Engineering, 2018)
Earthquake resilience starts with a sudden drop of performance when an earthquake strikes followed by a relatively long recovery phase. The dynamics and volume of investment directly affect the rate and level of recovery. ...