Search
Now showing items 171-180 of 185
Information system for planing and control of project realization
(Brno University of Technology, Faculty of Civil Engineering, 2010)
Project realization includes a lot of participants and information. Collecting and storing a huge amount of information is not an easy process. Integrated system for project management can make the process of collecting ...
Composite structural members in fire conditions and measures of protection / Spregnuti elementi u uslovima požara i mere zaštite
(Građevinski fakultet, Subotica, 2017)
In this paper, the results of numerical simulation of 2D non-stationary temperature fields in commonly used composite structural members made of steel and concrete in fire conditions were presented. Simulation is based on ...
One procedure of Fuzzy AHP based on eigenvalues
(Univerzitet u Beogradu, Fakultet organizacionih nauka, 2013)
One procedure of fuzzy AHP that is based on eigenvalues is presented in this paper. According to
expected values of fuzzy numbers, one method for determination of fuzzy eigenvalues and eigenvectors is
proposed and used ...
Multi-Objective Optimization Model for The Selection of Measures for Energy Efficient Retrofitting of Building Envelopes
(Proceedings of International Scientific Conference Energy Efficiency and the Fourth Industrial Revolution, 2021)
Within this paper, a multi-criteria decision-making model for evaluating the energy efficiency of building construction measures for new or existing buildings will be presented. The proposed model observes the optimization ...
Teaching computing for complex problems in civil engineering and geosciences using big data and machine learning: synergizing four different computing paradigms and four different management domains
(Springer, 2023)
This article describes a teaching strategy that synergizes computing and management, aimed at the running of complex projects in industry and academia, in the areas of civil engineering, physics, geosciences, and a number ...
Primena metode za analizu kašnjenja na projektu sa studijom slučaja
(15. kongres Društva građevinskih konstruktera Srbije, Zlatibor, 6-8. 9. 2018, 2018)
Vreme za izvođenje radova je parametar koji je od suštinskog značaja i za izvođača i za investitora. Za vlasnika projekta to je izgubljeni profit koji proizilazi iz nemogućnosti eksploatacije objekta u planiranom roku, dok ...
AI in Agriculture
(1st Serbian International Conference on Applied Artificial Intelligence (SICAAI), Kragujevac, Serbia, 2022)
Soil organic carbon represents the main nutrient source for crop yields, which is of great importance to agricultural production. This research investigates the usage of a transfer learning-based neural network model to ...
Determination of dynamic thermal characteristics of a building wall
(Mechanical Engineering Faculty, University of Niš, 2015)
In this paper, based on in situ experimental temperature measurements, the following dynamic thermal parameters of a wall were calculated: decrement factor, time shift of thermal transmittance and areal heat capacities. ...
Determination of the temperature transfer function of building constructions based on measurement data
(Materials Research Society of Serbia, 04-01-2015)
In this paper a method of determination of transfer function for temperature measured inside and outside residential building in Belgrade is presented. The instantaneous measurements of indoor temperature inside a living ...
A digital solution for unlocking the urban mining potential of the residential building stock through the integration of BIM and GIS
(Conference on interdisciplinary and transdisciplinary research for sustainable development, 2022)
The construction industry consumes up to half of the excavated primary resources and
generates one-third of total waste annually, impacting the environment and society. To
reduce this impact, maintaining the primary ...