Pretraživanje
Prikaz rezultata 161-170 od 185
Method in planning construction machinery replacement
(Građevinski fakultet u Subotici, 2018)
One basic criteria for determining the replacement time of construction
machinery is based on the age , that is, the increase in operating costs of the machine
with time. The key factor which determines and justifies ...
Standard in project management - ANSI/PMI 99-001- 2008 brief presentation
(Univerzitet Crne Gore, Građevinski fakultet, 2012)
Project management has evolved over time, becoming the principal mean of dealing with change in modern organizations. Best practices have occurred as a result of business evolution and of practicing project management at ...
Preliminary quantity estimation in construction using machine learning methods
(STEPGRAD2022 - Proceedings of International conference on Contemporary Theory and Practice in Construction XV, 2022)
This paper analyses the problem of estimating the required quantities of major work items in the construction of residential and residential-commercial buildings using machine learning algorithms. The goal is to form a ...
Rapid earthquake loss assessment based on machine learning and representative sampling
(Earthquake Spectra, 2021)
This paper proposes a new framework for rapid earthquake loss assessment based on a machine learning damage classification model and a representative sampling algorithm. A Random Forest classification model predicts a ...
2010 Kraljevo Earthquake Recovery Process Metrics Derived from Recorded Reconstruction Data
(16th European Conference on Earthquake Engineering, 2018)
Earthquake resilience starts with a sudden drop of performance when an earthquake strikes followed by a relatively long recovery phase. The dynamics and volume of investment directly affect the rate and level of recovery. ...
Upravljanje procesom izbora ugovorne strategije u građevinarstvu uz promenu teorije fazi (rasplinutih) skupova / Management of Construction Contract Strategy Selection by Applying the Theory of Fuzzy Sets
(2007)
Cilj doktorske disertacije je da se ukaže na značaj izbora ugovome strategy e za
uspešnu realizaciju investicionih projekata i da se predloži postupak za izbor
odgovarajuée strategie primenom fazi logike i fazi ekspertnih ...
Application of unstructured text based features in prediction of real estate prices: A comparative study
(2nd Serbian International Conference on Applied Artificial Intelligence (SICAAI) Kragujevac, Serbia, May 19-20, 2023, 2023)
This study demonstrates the potential of application of unstructured textual data for predicting
real estate prices and compares different protocols for extracting features from textual data.
Performance of the different ...
Primena BIM-a u upravljanju projektima - kako boljim projektovanjem smanjiti probleme u izvođenju
(Konferencija - 16. kongres DGKS 2022, 28 - 30. 9, Aranđelovac, 2022)
Uspešno upravljanje projektima podrazumeva maksimalno ostvarenje ciljeva projekta uz minimalne probleme u realizaciji. Preduslov za prvo je kreativni a za drugo tehnički kvalitet projektovanja. U radu je predstavljen model ...
Compensating the lack of big data in construction industry with expert knowledge: a case study
(1st Serbian International Conference on Applied Artificial Intelligence (SICAAI) Kragujevac, Serbia, May 19-20, 2022, 2022)
Due to various reasons, there is a lack of big data in the construction industry, one of the main obstacles to a broader implementation of AI. Another obstacle is adhering to analytical methods in fields more suitable for ...
Određivanje opterećenja loma dvopojasnih sistema primenom fuzzy (rasplinutih) brojeva
(Savez građevinskih inženjera Srbije, 2019)
U ovome radu se prikazano određivanja faktora graničnog opterećenja loma dvopojasnih nosača od betona i čelika pomoću fuzzy linearnog programiranja sa nepreciznim ulaznim podacima.. Problem je analiziran za eksperimentalne ...