Filter by: Subject
Приказ резултата 1-10 од 5
AHP method (1) |
allocation (1) |
CESAD (1) |
construction equipment (5) |
cost (1) |
depreciation (1) |
depresijacija (1) |
earthworks (1) |
economical optimization (1) |
expenses (1) |
AHP method (1) |
allocation (1) |
CESAD (1) |
construction equipment (5) |
cost (1) |
depreciation (1) |
depresijacija (1) |
earthworks (1) |
economical optimization (1) |
expenses (1) |