Mikić, Miljan

Link to this page

Authority KeyName Variants
orcid::0000-0001-9775-1131
  • Mikić, Miljan (17)
Projects

Author's Bibliography

Integrating BIM into construction project management education at the Faculty of Civil Engineering in Belgrade

Simić, Nevena; Petronijević, Marija; Mikić, Miljan; Petrović, Marija; Ivanišević, Nenad

(2019)

TY  - CONF
AU  - Simić, Nevena
AU  - Petronijević, Marija
AU  - Mikić, Miljan
AU  - Petrović, Marija
AU  - Ivanišević, Nenad
PY  - 2019
UR  - https://grafar.grf.bg.ac.rs/handle/123456789/2180
AB  - The development of information technology and communication means has a great
influence on the way construction projects are prepared and delivered. One of the latest trends
in digitalization in construction bringing improvement throughout construction industry is the
application of Building Information Modeling /Models (BIM). BIM is used for optimization of
projects in respect of time and money in all project phases. It has been noted that BIM was
successful in fulfilling these goals in all countries which have imposed BIM implementation
for certain types of projects in their legislation and application of BIM becomes a standard all
over the world. In order to keep the pace with everyday demands of the construction industry,
the Department for Construction Project Management at the Faculty of Civil Engineering in
Belgrade has introduced BIM in lecturing on Construction Project Management. In the latest
accreditation, two new courses have been introduced. “The basics of designing by applying
BIM technology”, has been lectured at the final year of bachelor studies from the year
2017/2018. “BIM in Construction Project Management”, will be lectured at the master level
starting from October 2019. Based on previous and on-going research the authors developed
curriculums that will enable students to better understand the use of BIM in construction project
management. This paper presents (1) previous experience of BIM education within the CPM
module and (2) goals and first results of new courses being introduced in students education as
well as teaching materials and applied theoretical and practical teaching methods performed in
ICT labs with already implemented typical software for 3D modeling of construction and plans
for introducing 4D and 5D functionalities.
T1  - Integrating BIM into construction project management education at the Faculty of Civil Engineering in Belgrade
UR  - https://hdl.handle.net/21.15107/rcub_grafar_2180
ER  - 
@conference{
author = "Simić, Nevena and Petronijević, Marija and Mikić, Miljan and Petrović, Marija and Ivanišević, Nenad",
year = "2019",
abstract = "The development of information technology and communication means has a great
influence on the way construction projects are prepared and delivered. One of the latest trends
in digitalization in construction bringing improvement throughout construction industry is the
application of Building Information Modeling /Models (BIM). BIM is used for optimization of
projects in respect of time and money in all project phases. It has been noted that BIM was
successful in fulfilling these goals in all countries which have imposed BIM implementation
for certain types of projects in their legislation and application of BIM becomes a standard all
over the world. In order to keep the pace with everyday demands of the construction industry,
the Department for Construction Project Management at the Faculty of Civil Engineering in
Belgrade has introduced BIM in lecturing on Construction Project Management. In the latest
accreditation, two new courses have been introduced. “The basics of designing by applying
BIM technology”, has been lectured at the final year of bachelor studies from the year
2017/2018. “BIM in Construction Project Management”, will be lectured at the master level
starting from October 2019. Based on previous and on-going research the authors developed
curriculums that will enable students to better understand the use of BIM in construction project
management. This paper presents (1) previous experience of BIM education within the CPM
module and (2) goals and first results of new courses being introduced in students education as
well as teaching materials and applied theoretical and practical teaching methods performed in
ICT labs with already implemented typical software for 3D modeling of construction and plans
for introducing 4D and 5D functionalities.",
title = "Integrating BIM into construction project management education at the Faculty of Civil Engineering in Belgrade",
url = "https://hdl.handle.net/21.15107/rcub_grafar_2180"
}
Simić, N., Petronijević, M., Mikić, M., Petrović, M.,& Ivanišević, N.. (2019). Integrating BIM into construction project management education at the Faculty of Civil Engineering in Belgrade. .
https://hdl.handle.net/21.15107/rcub_grafar_2180
Simić N, Petronijević M, Mikić M, Petrović M, Ivanišević N. Integrating BIM into construction project management education at the Faculty of Civil Engineering in Belgrade. 2019;.
https://hdl.handle.net/21.15107/rcub_grafar_2180 .
Simić, Nevena, Petronijević, Marija, Mikić, Miljan, Petrović, Marija, Ivanišević, Nenad, "Integrating BIM into construction project management education at the Faculty of Civil Engineering in Belgrade" (2019),
https://hdl.handle.net/21.15107/rcub_grafar_2180 .

Ex post analysis of road projects: resilience to crisis

Ćirilović, Jelena; Nikolić, Ana; Mikić, Miljan; Mladenović, Goran

(Editorial Board EJTIR, 2018)

TY  - JOUR
AU  - Ćirilović, Jelena
AU  - Nikolić, Ana
AU  - Mikić, Miljan
AU  - Mladenović, Goran
PY  - 2018
UR  - https://grafar.grf.bg.ac.rs/handle/123456789/945
AB  - This investigation aimed to reveal a mechanism of how different road projects' settings respond to macro-economic crisis. Qualitative and quantitative analyses were performed over a sample of 31 European road projects, in various funding arrangements and life cycle phases, all extracted from the Horizon 2020 BENEFIT project cases database. The project setting is described through a specific combination of project features and/or values of developed indicators. The analysis was applied to identify factors that contributed to projects' performance regarding the resilience to the global financial crisis of 2007-2008. By doing this, it became possible to determine potential liabilities of projects that are already in their implementation or use phases. The analysis showed there are equally strong contributors to a project's success within country-specific, as well as project-specific features. In order to boost resilience toward sudden and unpredicted disruptions, several factors have emerged, such as long term planning, investing in top priority projects (preferably medium size investments), with realistic traffic projections and experienced and responsible concessionaires, but also having in place strong regulatory bodies and government support. The identified mechanism of enhancing the resilience to crisis caused by a specific project setting can be beneficial to multiple stakeholders.
PB  - Editorial Board EJTIR
T2  - European Journal of Transport and Infrastructure Research
T1  - Ex post analysis of road projects: resilience to crisis
EP  - 516
IS  - 4
SP  - 499
VL  - 18
UR  - https://hdl.handle.net/21.15107/rcub_grafar_945
ER  - 
@article{
author = "Ćirilović, Jelena and Nikolić, Ana and Mikić, Miljan and Mladenović, Goran",
year = "2018",
abstract = "This investigation aimed to reveal a mechanism of how different road projects' settings respond to macro-economic crisis. Qualitative and quantitative analyses were performed over a sample of 31 European road projects, in various funding arrangements and life cycle phases, all extracted from the Horizon 2020 BENEFIT project cases database. The project setting is described through a specific combination of project features and/or values of developed indicators. The analysis was applied to identify factors that contributed to projects' performance regarding the resilience to the global financial crisis of 2007-2008. By doing this, it became possible to determine potential liabilities of projects that are already in their implementation or use phases. The analysis showed there are equally strong contributors to a project's success within country-specific, as well as project-specific features. In order to boost resilience toward sudden and unpredicted disruptions, several factors have emerged, such as long term planning, investing in top priority projects (preferably medium size investments), with realistic traffic projections and experienced and responsible concessionaires, but also having in place strong regulatory bodies and government support. The identified mechanism of enhancing the resilience to crisis caused by a specific project setting can be beneficial to multiple stakeholders.",
publisher = "Editorial Board EJTIR",
journal = "European Journal of Transport and Infrastructure Research",
title = "Ex post analysis of road projects: resilience to crisis",
pages = "516-499",
number = "4",
volume = "18",
url = "https://hdl.handle.net/21.15107/rcub_grafar_945"
}
Ćirilović, J., Nikolić, A., Mikić, M.,& Mladenović, G.. (2018). Ex post analysis of road projects: resilience to crisis. in European Journal of Transport and Infrastructure Research
Editorial Board EJTIR., 18(4), 499-516.
https://hdl.handle.net/21.15107/rcub_grafar_945
Ćirilović J, Nikolić A, Mikić M, Mladenović G. Ex post analysis of road projects: resilience to crisis. in European Journal of Transport and Infrastructure Research. 2018;18(4):499-516.
https://hdl.handle.net/21.15107/rcub_grafar_945 .
Ćirilović, Jelena, Nikolić, Ana, Mikić, Miljan, Mladenović, Goran, "Ex post analysis of road projects: resilience to crisis" in European Journal of Transport and Infrastructure Research, 18, no. 4 (2018):499-516,
https://hdl.handle.net/21.15107/rcub_grafar_945 .
2
4

The Successful Delivery of Megaprojects: A Novel Research Method

Locatelli, Giorgio; Mikić, Miljan; Kovačević, Miloš; Brookes, Naomi; Ivanišević, Nenad

(SAGE Publications Inc., 2017)

TY  - JOUR
AU  - Locatelli, Giorgio
AU  - Mikić, Miljan
AU  - Kovačević, Miloš
AU  - Brookes, Naomi
AU  - Ivanišević, Nenad
PY  - 2017
UR  - https://grafar.grf.bg.ac.rs/handle/123456789/869
AB  - Megaprojects are often associated with poor delivery performance and poor benefits realization. This article provides a method of identifying, in a quantitative and rigorous manner, the characteristics related to project management success in megaprojects. It provides an investigation of how stakeholders can use this knowledge to ensure more effective design and delivery for megaprojects. The research is grounded in 44 megaprojects and a systematic, empirically based methodology that employs the Fisher's exact test and machine learning techniques to identify the correlation between megaprojects' characteristics and performance, paving the way to an understanding of their causation.
PB  - SAGE Publications Inc.
T2  - Project Management Journal
T1  - The Successful Delivery of Megaprojects: A Novel Research Method
IS  - 5
SP  - 78
VL  - 48
DO  - 10.1177/875697281704800506
ER  - 
@article{
author = "Locatelli, Giorgio and Mikić, Miljan and Kovačević, Miloš and Brookes, Naomi and Ivanišević, Nenad",
year = "2017",
abstract = "Megaprojects are often associated with poor delivery performance and poor benefits realization. This article provides a method of identifying, in a quantitative and rigorous manner, the characteristics related to project management success in megaprojects. It provides an investigation of how stakeholders can use this knowledge to ensure more effective design and delivery for megaprojects. The research is grounded in 44 megaprojects and a systematic, empirically based methodology that employs the Fisher's exact test and machine learning techniques to identify the correlation between megaprojects' characteristics and performance, paving the way to an understanding of their causation.",
publisher = "SAGE Publications Inc.",
journal = "Project Management Journal",
title = "The Successful Delivery of Megaprojects: A Novel Research Method",
number = "5",
pages = "78",
volume = "48",
doi = "10.1177/875697281704800506"
}
Locatelli, G., Mikić, M., Kovačević, M., Brookes, N.,& Ivanišević, N.. (2017). The Successful Delivery of Megaprojects: A Novel Research Method. in Project Management Journal
SAGE Publications Inc.., 48(5), 78.
https://doi.org/10.1177/875697281704800506
Locatelli G, Mikić M, Kovačević M, Brookes N, Ivanišević N. The Successful Delivery of Megaprojects: A Novel Research Method. in Project Management Journal. 2017;48(5):78.
doi:10.1177/875697281704800506 .
Locatelli, Giorgio, Mikić, Miljan, Kovačević, Miloš, Brookes, Naomi, Ivanišević, Nenad, "The Successful Delivery of Megaprojects: A Novel Research Method" in Project Management Journal, 48, no. 5 (2017):78,
https://doi.org/10.1177/875697281704800506 . .
3
48
26
48

The Successful Delivery of Megaprojects: A Novel Research Method

Locatelli, Giorgio; Mikić, Miljan; Kovačević, Miloš; Brookes, Naomi; Ivanišević, Nenad

(SAGE Publications Inc., 2017)

TY  - JOUR
AU  - Locatelli, Giorgio
AU  - Mikić, Miljan
AU  - Kovačević, Miloš
AU  - Brookes, Naomi
AU  - Ivanišević, Nenad
PY  - 2017
UR  - https://grafar.grf.bg.ac.rs/handle/123456789/1844
AB  - Megaprojects are often associated with poor delivery performance and poor benefits realization. This article provides a method of identifying, in a quantitative and rigorous manner, the characteristics related to project management success in megaprojects. It provides an investigation of how stakeholders can use this knowledge to ensure more effective design and delivery for megaprojects. The research is grounded in 44 megaprojects and a systematic, empirically based methodology that employs the Fisher's exact test and machine learning techniques to identify the correlation between megaprojects' characteristics and performance, paving the way to an understanding of their causation.
PB  - SAGE Publications Inc.
T2  - Project Management Journal
T1  - The Successful Delivery of Megaprojects: A Novel Research Method
IS  - 5
SP  - 78
VL  - 48
DO  - 10.1177/875697281704800506
ER  - 
@article{
author = "Locatelli, Giorgio and Mikić, Miljan and Kovačević, Miloš and Brookes, Naomi and Ivanišević, Nenad",
year = "2017",
abstract = "Megaprojects are often associated with poor delivery performance and poor benefits realization. This article provides a method of identifying, in a quantitative and rigorous manner, the characteristics related to project management success in megaprojects. It provides an investigation of how stakeholders can use this knowledge to ensure more effective design and delivery for megaprojects. The research is grounded in 44 megaprojects and a systematic, empirically based methodology that employs the Fisher's exact test and machine learning techniques to identify the correlation between megaprojects' characteristics and performance, paving the way to an understanding of their causation.",
publisher = "SAGE Publications Inc.",
journal = "Project Management Journal",
title = "The Successful Delivery of Megaprojects: A Novel Research Method",
number = "5",
pages = "78",
volume = "48",
doi = "10.1177/875697281704800506"
}
Locatelli, G., Mikić, M., Kovačević, M., Brookes, N.,& Ivanišević, N.. (2017). The Successful Delivery of Megaprojects: A Novel Research Method. in Project Management Journal
SAGE Publications Inc.., 48(5), 78.
https://doi.org/10.1177/875697281704800506
Locatelli G, Mikić M, Kovačević M, Brookes N, Ivanišević N. The Successful Delivery of Megaprojects: A Novel Research Method. in Project Management Journal. 2017;48(5):78.
doi:10.1177/875697281704800506 .
Locatelli, Giorgio, Mikić, Miljan, Kovačević, Miloš, Brookes, Naomi, Ivanišević, Nenad, "The Successful Delivery of Megaprojects: A Novel Research Method" in Project Management Journal, 48, no. 5 (2017):78,
https://doi.org/10.1177/875697281704800506 . .
3
48
26
48

Motorway Horgos Novi Sad (second phase) Serbia

Mikić, Miljan; Ćirilović, Jelena; Vajdić, Nevena; Ivanišević, Nenad; Mladenović, Goran

(London ; New York: Routledge, 2017)

TY  - CHAP
AU  - Mikić, Miljan
AU  - Ćirilović, Jelena
AU  - Vajdić, Nevena
AU  - Ivanišević, Nenad
AU  - Mladenović, Goran
PY  - 2017
UR  - https://grafar.grf.bg.ac.rs/handle/123456789/1088
PB  - London ; New York: Routledge
T2  - Funding and Financing Transport Infrastructure
T1  - Motorway Horgos Novi Sad (second phase) Serbia
EP  - 150
SP  - 142
UR  - https://hdl.handle.net/21.15107/rcub_grafar_1088
ER  - 
@inbook{
author = "Mikić, Miljan and Ćirilović, Jelena and Vajdić, Nevena and Ivanišević, Nenad and Mladenović, Goran",
year = "2017",
publisher = "London ; New York: Routledge",
journal = "Funding and Financing Transport Infrastructure",
booktitle = "Motorway Horgos Novi Sad (second phase) Serbia",
pages = "150-142",
url = "https://hdl.handle.net/21.15107/rcub_grafar_1088"
}
Mikić, M., Ćirilović, J., Vajdić, N., Ivanišević, N.,& Mladenović, G.. (2017). Motorway Horgos Novi Sad (second phase) Serbia. in Funding and Financing Transport Infrastructure
London ; New York: Routledge., 142-150.
https://hdl.handle.net/21.15107/rcub_grafar_1088
Mikić M, Ćirilović J, Vajdić N, Ivanišević N, Mladenović G. Motorway Horgos Novi Sad (second phase) Serbia. in Funding and Financing Transport Infrastructure. 2017;:142-150.
https://hdl.handle.net/21.15107/rcub_grafar_1088 .
Mikić, Miljan, Ćirilović, Jelena, Vajdić, Nevena, Ivanišević, Nenad, Mladenović, Goran, "Motorway Horgos Novi Sad (second phase) Serbia" in Funding and Financing Transport Infrastructure (2017):142-150,
https://hdl.handle.net/21.15107/rcub_grafar_1088 .

Broadening the urban sustainable energy diapason through energy recovery from waste: A feasibility study for the capital of Serbia

Nikolić, Ana; Mikić, Miljan; Naunović, Zorana

(Elsevier Ltd, 2017)

TY  - JOUR
AU  - Nikolić, Ana
AU  - Mikić, Miljan
AU  - Naunović, Zorana
PY  - 2017
UR  - https://grafar.grf.bg.ac.rs/handle/123456789/888
AB  - Metropolitan areas are large consumers of energy and there is a growing need to broaden the urban sustainable energy diapason and increase the share of renewable and sustainable energy in overall energy consumption. This is especially important in countries such as Serbia that have limited domestic fossil fuel resources and rely on energy imports, from the environmental, financial and energy security points of view. In the Serbian capital of Belgrade electricity is produced in coal-fired power plants that have been shown to be vulnerable to flooding and the district heating system is reliant on imported natural gas. The objective of this work was to perform a feasibility study of a combined heat and power municipal solid waste mass burn incineration facility in Belgrade. The feasibility study included a financial and an economic analysis. The City of Belgrade has a developed district heating system and locating the incineration facility next to an existing heating plant would enable the utilization of the heat energy produced by incineration and substitution of a portion of the imported natural gas currently used for district heating. The contributions of energy derived froth waste incineration to the total energy consumption in Belgrade were also evaluated. The feasibility study showed that municipal solid waste incineration would be financially and economically positive and viable.
PB  - Elsevier Ltd
T2  - Renewable & Sustainable Energy Reviews
T1  - Broadening the urban sustainable energy diapason through energy recovery from waste: A feasibility study for the capital of Serbia
EP  - 8
SP  - 1
VL  - 69
DO  - 10.1016/j.rser.2016.11.177
ER  - 
@article{
author = "Nikolić, Ana and Mikić, Miljan and Naunović, Zorana",
year = "2017",
abstract = "Metropolitan areas are large consumers of energy and there is a growing need to broaden the urban sustainable energy diapason and increase the share of renewable and sustainable energy in overall energy consumption. This is especially important in countries such as Serbia that have limited domestic fossil fuel resources and rely on energy imports, from the environmental, financial and energy security points of view. In the Serbian capital of Belgrade electricity is produced in coal-fired power plants that have been shown to be vulnerable to flooding and the district heating system is reliant on imported natural gas. The objective of this work was to perform a feasibility study of a combined heat and power municipal solid waste mass burn incineration facility in Belgrade. The feasibility study included a financial and an economic analysis. The City of Belgrade has a developed district heating system and locating the incineration facility next to an existing heating plant would enable the utilization of the heat energy produced by incineration and substitution of a portion of the imported natural gas currently used for district heating. The contributions of energy derived froth waste incineration to the total energy consumption in Belgrade were also evaluated. The feasibility study showed that municipal solid waste incineration would be financially and economically positive and viable.",
publisher = "Elsevier Ltd",
journal = "Renewable & Sustainable Energy Reviews",
title = "Broadening the urban sustainable energy diapason through energy recovery from waste: A feasibility study for the capital of Serbia",
pages = "8-1",
volume = "69",
doi = "10.1016/j.rser.2016.11.177"
}
Nikolić, A., Mikić, M.,& Naunović, Z.. (2017). Broadening the urban sustainable energy diapason through energy recovery from waste: A feasibility study for the capital of Serbia. in Renewable & Sustainable Energy Reviews
Elsevier Ltd., 69, 1-8.
https://doi.org/10.1016/j.rser.2016.11.177
Nikolić A, Mikić M, Naunović Z. Broadening the urban sustainable energy diapason through energy recovery from waste: A feasibility study for the capital of Serbia. in Renewable & Sustainable Energy Reviews. 2017;69:1-8.
doi:10.1016/j.rser.2016.11.177 .
Nikolić, Ana, Mikić, Miljan, Naunović, Zorana, "Broadening the urban sustainable energy diapason through energy recovery from waste: A feasibility study for the capital of Serbia" in Renewable & Sustainable Energy Reviews, 69 (2017):1-8,
https://doi.org/10.1016/j.rser.2016.11.177 . .
3
2
5

Kvalitativna analiza rizika sa mogućim uticajem na finansijsku, ekonomsku, društvenu i ekološku održivost projekta studija slučaja izgradnje autoputa E-80, Niš-Dimitrovgrad

Petrović, Marija; Simić, Nevena; Mikić, Miljan; Ivković, Branislav

(Srpsko društvo za puteve ''Via-Vita'', Beograd, 2016)

TY  - CONF
AU  - Petrović, Marija
AU  - Simić, Nevena
AU  - Mikić, Miljan
AU  - Ivković, Branislav
PY  - 2016
UR  - https://grafar.grf.bg.ac.rs/handle/123456789/1491
AB  - Previous research shows that, despite the importance of large infrastructure projects, their implementation is often unsuccessful, both in terms of failure to meet the traditional project success criteria (cost, time, quality), as well as in terms of the adverse economic, social and environmental effects that the projects can create. Risks that arrise from specific characteristics of this type of projects are identified as the main cause of deviations from their planned performance.This paper presents a possible approach for qualitative risk analysis in the project conception phase, applied on a case study of a motorway project E-80, section Niš-Dimitrovgrad. The application of qualitative risk analysis enables the timely identification, ranking and systematic overview of potential threats for the achievement of specific project objectives and the proposal of measures for the elimination or reduction of threats. The studied methodology can be used in future pre-investment analyses of infrastructure facilities.
PB  - Srpsko društvo za puteve ''Via-Vita'', Beograd
C3  - Zbornik apstrakata = Book of Abstracts / Drugi srpski kongres o putevima, 9-10. jun 2016., Beograd = Second Serbian Road Congress, June 9-10, 2016
T1  - Kvalitativna analiza rizika sa mogućim uticajem na finansijsku, ekonomsku, društvenu i ekološku održivost projekta studija slučaja izgradnje autoputa E-80, Niš-Dimitrovgrad
EP  - 25
SP  - 24
UR  - https://hdl.handle.net/21.15107/rcub_grafar_1491
ER  - 
@conference{
author = "Petrović, Marija and Simić, Nevena and Mikić, Miljan and Ivković, Branislav",
year = "2016",
abstract = "Previous research shows that, despite the importance of large infrastructure projects, their implementation is often unsuccessful, both in terms of failure to meet the traditional project success criteria (cost, time, quality), as well as in terms of the adverse economic, social and environmental effects that the projects can create. Risks that arrise from specific characteristics of this type of projects are identified as the main cause of deviations from their planned performance.This paper presents a possible approach for qualitative risk analysis in the project conception phase, applied on a case study of a motorway project E-80, section Niš-Dimitrovgrad. The application of qualitative risk analysis enables the timely identification, ranking and systematic overview of potential threats for the achievement of specific project objectives and the proposal of measures for the elimination or reduction of threats. The studied methodology can be used in future pre-investment analyses of infrastructure facilities.",
publisher = "Srpsko društvo za puteve ''Via-Vita'', Beograd",
journal = "Zbornik apstrakata = Book of Abstracts / Drugi srpski kongres o putevima, 9-10. jun 2016., Beograd = Second Serbian Road Congress, June 9-10, 2016",
title = "Kvalitativna analiza rizika sa mogućim uticajem na finansijsku, ekonomsku, društvenu i ekološku održivost projekta studija slučaja izgradnje autoputa E-80, Niš-Dimitrovgrad",
pages = "25-24",
url = "https://hdl.handle.net/21.15107/rcub_grafar_1491"
}
Petrović, M., Simić, N., Mikić, M.,& Ivković, B.. (2016). Kvalitativna analiza rizika sa mogućim uticajem na finansijsku, ekonomsku, društvenu i ekološku održivost projekta studija slučaja izgradnje autoputa E-80, Niš-Dimitrovgrad. in Zbornik apstrakata = Book of Abstracts / Drugi srpski kongres o putevima, 9-10. jun 2016., Beograd = Second Serbian Road Congress, June 9-10, 2016
Srpsko društvo za puteve ''Via-Vita'', Beograd., 24-25.
https://hdl.handle.net/21.15107/rcub_grafar_1491
Petrović M, Simić N, Mikić M, Ivković B. Kvalitativna analiza rizika sa mogućim uticajem na finansijsku, ekonomsku, društvenu i ekološku održivost projekta studija slučaja izgradnje autoputa E-80, Niš-Dimitrovgrad. in Zbornik apstrakata = Book of Abstracts / Drugi srpski kongres o putevima, 9-10. jun 2016., Beograd = Second Serbian Road Congress, June 9-10, 2016. 2016;:24-25.
https://hdl.handle.net/21.15107/rcub_grafar_1491 .
Petrović, Marija, Simić, Nevena, Mikić, Miljan, Ivković, Branislav, "Kvalitativna analiza rizika sa mogućim uticajem na finansijsku, ekonomsku, društvenu i ekološku održivost projekta studija slučaja izgradnje autoputa E-80, Niš-Dimitrovgrad" in Zbornik apstrakata = Book of Abstracts / Drugi srpski kongres o putevima, 9-10. jun 2016., Beograd = Second Serbian Road Congress, June 9-10, 2016 (2016):24-25,
https://hdl.handle.net/21.15107/rcub_grafar_1491 .

The first municipal solid waste incinerator project in Southeast Europe

Nikolić, Ana; Mikić, Miljan; Naunović, Zorana

(2016)

TY  - CONF
AU  - Nikolić, Ana
AU  - Mikić, Miljan
AU  - Naunović, Zorana
PY  - 2016
UR  - https://grafar.grf.bg.ac.rs/handle/123456789/2714
AB  - Purpose
The City of Belgrade, the capital of Serbia, is in the project preparation phase for a publicprivate
partnership (PPP) project for the provision of services of treatment and disposal of
residual municipal solid waste (MSW), including the construction and operation of a waste to
energy (WtE) facility. The objective of this work was to perform a social cost-benefit
analysis (CBA) for a combined heat and power municipal solid waste mass burn incineration
facility in Belgrade.
Methods
A financial and an economic analysis were conducted for the proposed WtE facility. The
contributions of energy derived from waste incineration to the total energy consumption in
Belgrade were also evaluated.
Results
Belgrade has a developed district heating system and locating the WtE facility next to an
existing thermal power plant would enable the utilization of the heat energy produced by
incineration. It was estimated that in its first year of operation, the incinerator would produce
electrical energy and heat in the equivalent of 6% of the electrical household demand in 2014
and 26% of the thermal energy delivered during the 2014/2015 heating season in Belgrade.
The financial and economic analyses, done in the form of a CBA, showed that the project
would be financially and economically positive and viable.
Results
The Belgrade WtE facility project is a first-of-its-kind in the region. The presented work
could serve as a primer on conducting a WtE project sustainability analysis for other cities
and urban areas in the region that do not have developed WtE systems.
C3  - 4th International Conference on Sustainable Solid Waste Management, 23—25 June, 2016 Limassol, Cyprus
T1  - The first municipal solid waste incinerator project in Southeast Europe
UR  - https://hdl.handle.net/21.15107/rcub_grafar_2714
ER  - 
@conference{
author = "Nikolić, Ana and Mikić, Miljan and Naunović, Zorana",
year = "2016",
abstract = "Purpose
The City of Belgrade, the capital of Serbia, is in the project preparation phase for a publicprivate
partnership (PPP) project for the provision of services of treatment and disposal of
residual municipal solid waste (MSW), including the construction and operation of a waste to
energy (WtE) facility. The objective of this work was to perform a social cost-benefit
analysis (CBA) for a combined heat and power municipal solid waste mass burn incineration
facility in Belgrade.
Methods
A financial and an economic analysis were conducted for the proposed WtE facility. The
contributions of energy derived from waste incineration to the total energy consumption in
Belgrade were also evaluated.
Results
Belgrade has a developed district heating system and locating the WtE facility next to an
existing thermal power plant would enable the utilization of the heat energy produced by
incineration. It was estimated that in its first year of operation, the incinerator would produce
electrical energy and heat in the equivalent of 6% of the electrical household demand in 2014
and 26% of the thermal energy delivered during the 2014/2015 heating season in Belgrade.
The financial and economic analyses, done in the form of a CBA, showed that the project
would be financially and economically positive and viable.
Results
The Belgrade WtE facility project is a first-of-its-kind in the region. The presented work
could serve as a primer on conducting a WtE project sustainability analysis for other cities
and urban areas in the region that do not have developed WtE systems.",
journal = "4th International Conference on Sustainable Solid Waste Management, 23—25 June, 2016 Limassol, Cyprus",
title = "The first municipal solid waste incinerator project in Southeast Europe",
url = "https://hdl.handle.net/21.15107/rcub_grafar_2714"
}
Nikolić, A., Mikić, M.,& Naunović, Z.. (2016). The first municipal solid waste incinerator project in Southeast Europe. in 4th International Conference on Sustainable Solid Waste Management, 23—25 June, 2016 Limassol, Cyprus.
https://hdl.handle.net/21.15107/rcub_grafar_2714
Nikolić A, Mikić M, Naunović Z. The first municipal solid waste incinerator project in Southeast Europe. in 4th International Conference on Sustainable Solid Waste Management, 23—25 June, 2016 Limassol, Cyprus. 2016;.
https://hdl.handle.net/21.15107/rcub_grafar_2714 .
Nikolić, Ana, Mikić, Miljan, Naunović, Zorana, "The first municipal solid waste incinerator project in Southeast Europe" in 4th International Conference on Sustainable Solid Waste Management, 23—25 June, 2016 Limassol, Cyprus (2016),
https://hdl.handle.net/21.15107/rcub_grafar_2714 .

Incineration as a sustainable waste management option in Southeast Europe

Nikolić, Ana; Mikić, Miljan; Naunović, Zorana

(Faculty of Technical Science ; Serbian Solid Waste Association, Novi Sad, 2016)

TY  - CONF
AU  - Nikolić, Ana
AU  - Mikić, Miljan
AU  - Naunović, Zorana
PY  - 2016
UR  - https://grafar.grf.bg.ac.rs/handle/123456789/1478
AB  - Decision making process in complex environmental problems often involves large number of independent and sometimes irreconcilable factors. Analysing and comparing environmental, technological, economic and socio-political factors, while having in mind all stakeholders views, seems impossible unless supported with a formal decision making framework, which would facilitate understanding of all processes and influential factors related to decision making, including all criteria's and confronting interests which are specific to the available alternatives for a problem solution. Having in mind importance of efficient and objective decision making process, the paper gives general description of the MCDA methods used, and through a case study of landfill site selection process elaborates possible MCDA methods application in a waste management problems. Case study use a real data from a Central Eastern part of Macedonia and provide step by step example of using the AHP method as a tool of choice. Results clearly indicate that AHP can provide proper decision making support, allowing optimal solution selection through inclusion of different and otherwise incomparable criterions like the environmental (flora, fauna, visual aspects, cultural heritage...), technical (geological setting, hydrology, odours, accidents...), planning (location compared to the current land usage, infrastructure, future land usage...) and economic criteria's (investment and operational costs).
PB  - Faculty of Technical Science ; Serbian Solid Waste Association, Novi Sad
C3  - Proceedings / ISWA World Congress, [19-21st September, 2016, Novi Sad]
T1  - Incineration as a sustainable waste management option in Southeast Europe
EP  - 377
SP  - 363
UR  - https://hdl.handle.net/21.15107/rcub_grafar_1478
ER  - 
@conference{
author = "Nikolić, Ana and Mikić, Miljan and Naunović, Zorana",
year = "2016",
abstract = "Decision making process in complex environmental problems often involves large number of independent and sometimes irreconcilable factors. Analysing and comparing environmental, technological, economic and socio-political factors, while having in mind all stakeholders views, seems impossible unless supported with a formal decision making framework, which would facilitate understanding of all processes and influential factors related to decision making, including all criteria's and confronting interests which are specific to the available alternatives for a problem solution. Having in mind importance of efficient and objective decision making process, the paper gives general description of the MCDA methods used, and through a case study of landfill site selection process elaborates possible MCDA methods application in a waste management problems. Case study use a real data from a Central Eastern part of Macedonia and provide step by step example of using the AHP method as a tool of choice. Results clearly indicate that AHP can provide proper decision making support, allowing optimal solution selection through inclusion of different and otherwise incomparable criterions like the environmental (flora, fauna, visual aspects, cultural heritage...), technical (geological setting, hydrology, odours, accidents...), planning (location compared to the current land usage, infrastructure, future land usage...) and economic criteria's (investment and operational costs).",
publisher = "Faculty of Technical Science ; Serbian Solid Waste Association, Novi Sad",
journal = "Proceedings / ISWA World Congress, [19-21st September, 2016, Novi Sad]",
title = "Incineration as a sustainable waste management option in Southeast Europe",
pages = "377-363",
url = "https://hdl.handle.net/21.15107/rcub_grafar_1478"
}
Nikolić, A., Mikić, M.,& Naunović, Z.. (2016). Incineration as a sustainable waste management option in Southeast Europe. in Proceedings / ISWA World Congress, [19-21st September, 2016, Novi Sad]
Faculty of Technical Science ; Serbian Solid Waste Association, Novi Sad., 363-377.
https://hdl.handle.net/21.15107/rcub_grafar_1478
Nikolić A, Mikić M, Naunović Z. Incineration as a sustainable waste management option in Southeast Europe. in Proceedings / ISWA World Congress, [19-21st September, 2016, Novi Sad]. 2016;:363-377.
https://hdl.handle.net/21.15107/rcub_grafar_1478 .
Nikolić, Ana, Mikić, Miljan, Naunović, Zorana, "Incineration as a sustainable waste management option in Southeast Europe" in Proceedings / ISWA World Congress, [19-21st September, 2016, Novi Sad] (2016):363-377,
https://hdl.handle.net/21.15107/rcub_grafar_1478 .

Upravljanje rizicima pri izgradnji kapitalnih infrastrukturnih objekata u cilju poboljšanja njihove održivosti

Mikić, Miljan

(Универзитет у Београду, Грађевински факултет, 2015)

TY  - THES
AU  - Mikić, Miljan
PY  - 2015
UR  - http://eteze.bg.ac.rs/application/showtheses?thesesId=2379
UR  - https://fedorabg.bg.ac.rs/fedora/get/o:10353/bdef:Content/download
UR  - http://vbs.rs/scripts/cobiss?command=DISPLAY&base=70036&RID=513691538
UR  - http://nardus.mpn.gov.rs/123456789/4184
UR  - https://grafar.grf.bg.ac.rs/handle/123456789/1680
AB  - Investicioni projekat u građevinarstvu se definiše kao kompleksan tehničko-tehnološki,organizacioni, pravni, ekonomski i finansijski poduhvat koji se sastoji od skupakoordinisanih i kontrolisanih aktivnosti sa jasno definisanim početkom i krajem, čiji jecilj izgradnja, rekonstrukcija, modifikacija i/ili opremanje objekta ili objekata koji supotrebni investitoru. Kompleksnost je, kao karakteristika projekta i okruženja u kome seprojekat realizuje, naročito izražena kod velikih infrastrukturnih investicionih projekata.Predmet istraživanja u ovoj disertaciji jesu kapitalni infrastrukturni projekti velikeinvesticione vrednosti, veće od pedeset miliona evra. Razmatrani su projekti izgradnjeobjekata sistema ekonomske materijalne infrastrukture, i to: objekata saobraćajne (autoputevi,železničke pruge, metro linije i aerodromi), energetske (objekti za proizvodnju iprenos električne energije i gasa) i hidrotehničke (hidrotehničke konstrukcije)infrastrukture.Ovi projekti predstavljaju motore razvoja svakog društva i države. S obzirom napotencijalne dugoročne ekonomske, društvene i ekološke efekte koje velikiinfrastrukturni projekti mogu proizvesti, proces njihovog pokretanja, planiranja irealizacije je uvek praćen značajnom pažnjom celokupnog društva.Prethodna istraživanja pokazuju da je i pored značaja koji kapitalni infrastrukturniprojekti imaju, njihova realizacija veoma često neuspešna, i to kako u pogleduneispunjenja tradicionalnih kriterijuma uspeha projekata (troškovi, vreme, kvalitet),tako i u pogledu negativih ekonomskih efekata projekata i negativnih efekata projekatana društveno i ekološko okruženje. Ova tri aspekta uticaja na okruženja projekta(ekonomski, društveni i ekološki uticaji) čine tri aspekta održivosti i primene principaodrživog razvoja na konrektnom projektu. Kao glavni razlozi za odstupanja odplaniranih performansi realizovanih kapitalnih infrastrukturnih projekata u literaturi senavode rizici koji proističu iz specifičnosti ovakvih projekata. Kapitalni infrastrukturniprojekti su, u odnosu na građevinske projekte manje investicione vrednosti, investicionozahtevniji, značajno kompleksniji, prisutna je veća neizvesnost, veći broj učesnika,dugotrajniji su, i njihovi potencijalni efekti na ekonomiju, društvo i okolinu su veći,dalekosežniji i privlače više pažnje javnosti.Prethodna istraživanja takođe otkrivaju da, za sada, ne postoji jedinstvena metodologijaza procenu održivosti infrastrukturnih objekata u ranim fazama realizacije investicionogprojekta.Konačno, oblast upravljanja rizicima prilikom realizacije infrastrukturnih projekata nijeu dovoljnoj meri obrađena u domaćoj stručnoj i naučnoj literaturi.U prvom delu istraživanja za potrebe ove disertacije sprovedeno je kvantitativnoistraživanje sa ciljem identifikacije ključnih rizika po ostvarenje troškovnih ivremenskih performansi projekata izgradnje infrastrukturnih objekata u Srbiji. Osimtoga, ispitano je i postojanje prakse upravljanja rizicima na investicionim projektima uSrbiji. Dobijeni rezultati tog dela istraživanja su pokazali da su najznačajniji rizici prirealizaciji infrastrukturnih objekata u Srbiji: Nedostatak finansijskih sredstava zarealizaciju projekta, Finansijski rizik, Politički rizik i Korupcija. Takođe, bez obzira štopostoji svest da je primena upravljanja rizicima važna i što postoji potreba za njegovomprimenom, u Srbiji se upravljanje rizicima ne primenjuje dovoljno i prisutan je manjakznanja u vezi sa upravljanjem rizicima. Međutim, među praktičarima iz oblastigrađevinarstva postoji izražena zainteresovanost da se o upravljanju rizicima nauči više.S obzirom na ovakve rezultate, u daljem istraživanju analizirani su i prikazani mogućipristupi za analizu rizika i integraciju analize ekonomske, socijalne i ekološke održivostiprojekta u fazi formiranja koncepcije kapitalnog infrastrukturnog projekta. Predloženasu i razmotrena dva pristupa – kvalitativna i kvantitativna analiza rizika, uz primenusocijalne Cost-Benefit analize (SCBA). Mogućnost i implikacije praktične primenepredloženih pristupa analizirani su na primeru dve studije slučaja kapitalnihinfrastrukturnih objekata (izgradnja postrojenja za insineraciju komunalnog čvrstogotpada i izgradnja deonice auto-puta).U disertaciji je pokazano da primena predstavljene SCBA uz monetarizaciju eksternihefekata projekata omogućava svođenje na istu meru i sveobuhvatno sagledavanjepotencijalnih ekonomskih, društvenih i ekoloških uticaja projekta kroz ceo životniciklus. Primena kvalitativne analize rizika omogućava pravovremenu identifikaciju,rangiranje i sistematičan prikaz potencijalnih pretnji po ostvarenje pojedinih ciljevaprojekta, te predlog mera za otklanjanje ili umanjenje pretnji. Stohastički pristup iMonte-Carlo analiza za kvantitativnu analizu rizika u studiji opravdanosti doprinosevećoj pouzdanosti procene finansijskih i društveno-ekonomskih rezultata projekta.Prikazanu metodologiju i pristup je moguće koristiti u budućim predinvesticionimanalizama kapitalnih infrastrukturnih objekata, naročito na domaćem tržištu i tržištuzemalja u razvoju.Cilj daljeg istraživanja bilo je ispitivanje mogućnosti za razvoj ekspertskog sistema zaprocenu rizika u ranim fazama realizacije kapitalnih infrastrukturnih projekata. Izvršenaje provera hipoteze da je na osnovu poznatih istorijskih podataka o ostvarenjuplaniranih troškova i rokova realizacije i o karakteristikama realizovaniih kapitalniihinfrastrukturniih projekata i njihovog okruženja moguće napraviti model za predviđanjeuspešnosti realizacije na novim projektima, ukoliko su karakteristike novih projekata injihovog okruženja poznate. Usvojena metodologija istraživanja podrazumevala jenajpre prikupljanje podataka sa realizovanih kapitalnih infrastrukturnih projekata,njihovu pripremu a zatim analizu primenom metoda mašinskog učenja. Mašinskoučenje je oblast kompjuterskih nauka koja se bavi kreiranjem i analizom metoda nakojima počivaju računarski programi koji uče iz iskustva.Prikupljeni su podaci o 30 saobraćajnih, 12 energetskih i 2 hidrotehnička kapitalnaprojekta (ukupno 44 projekta, svaki vrednosti preko petsto miliona evra) realizovana nateritoriji Evrope. Podaci su sistematizovani u obliku 3 binarna pokazatelja uspešnostiprojekata (prekoračenje troškova, kašnjenje u fazi građenja i kašnjenje u fazi planiranja)i 46 binarnih atributa projekata, koji opisuju izvore rizika iz 5 kategorija: učesnici naprojektu (interni i eksterni), spoljašnje okruženje projekta (pravno, društvenoekonomsko,političko), upravljanje projektom, tehnološki aspekti, razno. Metodologijaprikupljanja i pripreme podataka zasnivala se na metodologiji rada formiranoj u okvirumeđunarodne naučne COST akcije TU1003: "Megaproject – Efficient Design andDelivery of Megaprojects in the European Union". Zatim je, prema originalnoosmišljenoj metodologiji, zasnovanoj na prethodnim istraživanjima u oblastima procenerizika i primene metoda mašinskog učenja u upravljanju projektima, izvršena uporednaanaliza performansi dvanaest predloženih modela za predviđanje prekoračenjaMiljan S. Mikić, dipl. građ. inž. 8planiranih troškova izgradnje, kašnjenja u fazi građenja, kao i kašnjenja u fazi planiranjarealizacije projekata. Ispitana je mogućnost kombinovane primene statističkih metoda(Selekcija podskupa atributa zasnovana na korelaciji i Selekcija zasnovana na vrednostiinformacionog dobitka) i metoda mašinskog učenja (Metoda vektora podrške, Veštačkeneuralne mreže, K-najbližih suseda, Drvo odlučivanja, Naivni Bajesov klasifikator iLogistička regresija).Dobijeni rezultati su dokazali da je za dati skup prikupljenih podataka bilo mogućenapraviti modele za predviđanje navedenih pokazatelja uspešnosti u ranoj fazirealizacije kapitalnih infrastrukturnih projekata.Istraživanje predmetnog skupa podataka je takođe identifikikovalo podskupove odrelativno malog broja ključnih izvora rizika iz faze pre početka građenja (3-10, zavisnood problema) čije poznavanje je dovoljno da se ostvare dobijene, relativno visokeperformanse predviđanja. Za dati skup prikupljenih podataka, najznačajnijeidentifikovane kategorije rizika jesu: Društveno-ekonomsko okruženje projekta,Eksterni učesnici na projektu i Tehnološki aspekti projekta.Veoma bitna distinkcija primenjenog pristupa u odnosu na analizu korelacijepojedinačnih izvora rizika i pokazatelja performansi projekata jeste da se ovde nastojiutvrditi zajednički uticaj koji više izvora rizika istovremeno imaju na performanseprojekata.Primena predloženih modela, za rano predviđanje uspešnosti realizacije projekata,najveću korist donela bi investitoru i donosiocima odluka u ranoj fazi realizacijeprojekta, jer bi mogla da pruži bolji uvid u očekivane performanse datog projekta, kao ida upozori na izvore rizika zbog kojih bi performanse projekta potencijalno mogle bitiugrožene.Kako bi ekspertski sistem za procenu rizika prilikom pokretanja i realizacije kapitalnihinfrastrukturnih projekata bio zaokružen, neophodan je dalji rad na dopunjavanju bazepodataka.
AB  - A construction investment project is defined as a complex technical and technological,organizational, legal, economic and financial endeavour that consists of a set ofcoordinated and controlled activities with a clearly defined beginning and end, with thegoal of building, reconstructing, modifying and/or equipping a facility or facilities thatare required by the investor. Project and project environment complexity is particularlyemphasised on large infrastructure investment projects.The subject of the research in this dissertation are large infrastructure projects with aninvestment value of more than fifty million euros. The projects of planning andconstruction of hard (physical) economic infrastructure were investigated; thoseincluded ones in the traffic (highways, railways, subway lines and airports), energy(facilities for the production and transmission of electricity and gas) and hydro-technicalsector.The above listed projects represent the development engines of any society and state.Given the potential long-term economic, social and environmental effects that largeinfrastructure projects can produce, their planning and construction process is alwaysfollowed closely by the entire society.Previous research shows that, despite the importance of large infrastructure projects,their implementation is often unsuccessful, both in terms of failure to meet thetraditional project success criteria (cost, time, quality), as well as in terms of the adverseeconomic, social and environmental effects that the projects can create. Analysis ofthese three impacts (economic, social and environmental), as aspects of sustainability,allows for the incorporation of sustainable development principles within a specificproject. In the literature, risks that arrise from specific characteristics of largeinfrastructure projects are identified as the main cause of deviations from the plannedperformance of large infrastructure projects. In comparison to construction projects ofsmaller investment value, large infrastructure projects are: financially more demanding;significantly more complex; carry a greater uncertainty; include more stakeholders; areMiljan S. Mikić, dipl. građ. inž. 11longer lasting, and their potential effects on the economy, society and the environmentare greater, more far-reaching and generate more public attention.At present, there is no single accepted methodology for sustainability assessment in theearly phase (phase of conducting pre-feasiblity anf feasibility study) of an investmentproject.Additionally, the area of risk management on infrastructure projects is not sufficientlyaddressed in the domestic professional and scientific literature.In the first part of the dissertation, quantitative research was conducted in order toidentify the key risks to achieving cost and time performance of infrastructureconstruction projects in Serbia. In addition, risk management practices related toinvestment projects in Serbia were investigated. Research results showed that the mostsignificant risks associated with construction infrastructure projects in Serbia are: thelack of funds for project implementation; financial and political risks; and corruption.Also, regardless of the fact that there is awareness of the importance of riskmanagement and the need for its implementation, risk management is not implementedwell in Serbia and there is a lack of knowledge in relation to risk management.However, there is a strong interest to learn more about risk management among thepractitioners in the construction field.Considering obtained results, in further research, possible approaches for risk analysisand integration of project economic, social and environmental sustainability analysiswere addressed. Two approaches were proposed and investigated – a qualitative and aquantitative risk analysis, along with applying a Social Cost-Benefit Analysis (SCBA).The possibility and implications of the practical application of the proposed approacheswere analysed on two case studies of major infrastructure projects (Municipal solidwaste incineration plant and a Motorway section).The application of the presented SCBA with monetization of the project external effectsallows for comprehensive consideration of the potential economic, social andenvironmental impacts of the project throughout the entire life cycle of theinfrastructure facility. The application of qualitative risk analysis enables the timelyidentification, ranking and systematic overview of potential threats for the achievementof specific project objectives and the proposal of measures for the elimination orreduction of threats. The stochastic approach and Monte-Carlo Analysis for quantitativerisk analysis in the project feasibility study allows the higher reliability of assessment ofthe project financial and socio-economic results. The studied methodology andapproach can be used in future pre-investment analyses of major infrastructure facilities,especially in the domestic market and the market of developing countries.The further objective of this dissertation was to examine the possiblity for developingan expert system for risk assessment in the early phase of large infrastructure projects.The hypothesis was that based on the known historical data on the achievement ofplanned cost and deadlines and the characteristics of large infrastructure projects andtheir environment, it is possible to create a model that can predict the success or failure(regarding cost and time performance) of new projects, if the characteristics of newprojects and their environment are known. The adopted research methodology consistedof data collection from completed large infrastructure projects, data preparation andanalysis using machine learning methods. Machine learning is a field of computerscience that deals with the creation and analysis of methods that are used by computerprograms that learn from experience. In previous studies, it has been proven that certainmachine learning methods can be successfully used to predict the performance ofconstruction investment projects.Data from 30 traffic, 12 energy and 2 hydro-technical large infrastructure projects (atotal of 44 projects, each with the investment value of more than five hundred millioneuros) completed in Europe were collected. The data were transformed to the form ofthree binary project success indicators (Cost overrun, Delay in the construction phaseand a Delay in the planning phase) and 46 binary project attributes, which describe thesources of risk from five categories of project characteristics and characteristic of theproject environment: Project stakeholders (internal and external); The externalenvironment of the project (legal, socio-economic, political); Project management;Technological aspects; and Miscellaneous. The methodology of collecting andpreparing the data was based on the methodology of work of the international scientificCOST Action TU1003: "Megaproject - Efficient Design and Delivery of Megaprojectsin the European Union". Then, according to the newly proposed methodology that wasbased on previous research in the areas of risk assessment and the application ofmachine learning methods in project management, a comparative analysis of theperformance of the twelve proposed models for the prediction of the exceedance of theplanned construction costs, the delay in the construction phase, as well as the delay inthe planning phase execution of the projects was performed. The possibility of thecombined application of statistical methods (the selection of a subset of attributes basedon correlation and the selection based on the value of information gain) and machinelearning methods (Support vectors machine, Artificial neural networks, K-nearestneighbour, Decision tree, Naive Bayesian classifier, Logistic regression) was analysed.The results have shown that, for a given set of collected data, it was possible to buildmodels that predict success indicators in the early implementation stage of largeinfrastructure projects.The research also resulted with the identification of subsets of a relatively small numberof key sources of risk from the pre-construction phase of project development (3-10sources of risk, depending on the problem) whose knowledge is sufficient to yieldrelatively high performance predictions for a given set of collected data. The mostimportant identified risk categories are: the socio-economic environment of the project;the external stakeholders in the project; and the technological aspects of the project.A very important distinction between the approach applied in this dissertation and thecorrelation analysis of individual sources of risk and project performance indicators isthat in this dissertation the attempt was to determine the combined concurrent effect ofmultiple sources of risk on project performance.The greatest benefit of the application of proposed models for the early prediction ofproject success is to the investor and the decision-makers at the early stage of a project,as the models can provide a better insight into the expected performance of a givenproject, as well as to draw attention to the sources of risk that would potentiallyendanger project performance.In order to finalize the expert system for risk assessment during the planning andconstruction phases of large infrastructure projects, further research should be aimed atbroadening the database of large infrastructure projects.
PB  - Универзитет у Београду, Грађевински факултет
T2  - Универзитет у Београду
T1  - Upravljanje rizicima pri izgradnji kapitalnih infrastrukturnih objekata u cilju poboljšanja njihove održivosti
T1  - Risk management during planning and construction of large infrastructure projects for improving their sustainability
UR  - https://hdl.handle.net/21.15107/rcub_nardus_4184
ER  - 
@phdthesis{
author = "Mikić, Miljan",
year = "2015",
abstract = "Investicioni projekat u građevinarstvu se definiše kao kompleksan tehničko-tehnološki,organizacioni, pravni, ekonomski i finansijski poduhvat koji se sastoji od skupakoordinisanih i kontrolisanih aktivnosti sa jasno definisanim početkom i krajem, čiji jecilj izgradnja, rekonstrukcija, modifikacija i/ili opremanje objekta ili objekata koji supotrebni investitoru. Kompleksnost je, kao karakteristika projekta i okruženja u kome seprojekat realizuje, naročito izražena kod velikih infrastrukturnih investicionih projekata.Predmet istraživanja u ovoj disertaciji jesu kapitalni infrastrukturni projekti velikeinvesticione vrednosti, veće od pedeset miliona evra. Razmatrani su projekti izgradnjeobjekata sistema ekonomske materijalne infrastrukture, i to: objekata saobraćajne (autoputevi,železničke pruge, metro linije i aerodromi), energetske (objekti za proizvodnju iprenos električne energije i gasa) i hidrotehničke (hidrotehničke konstrukcije)infrastrukture.Ovi projekti predstavljaju motore razvoja svakog društva i države. S obzirom napotencijalne dugoročne ekonomske, društvene i ekološke efekte koje velikiinfrastrukturni projekti mogu proizvesti, proces njihovog pokretanja, planiranja irealizacije je uvek praćen značajnom pažnjom celokupnog društva.Prethodna istraživanja pokazuju da je i pored značaja koji kapitalni infrastrukturniprojekti imaju, njihova realizacija veoma često neuspešna, i to kako u pogleduneispunjenja tradicionalnih kriterijuma uspeha projekata (troškovi, vreme, kvalitet),tako i u pogledu negativih ekonomskih efekata projekata i negativnih efekata projekatana društveno i ekološko okruženje. Ova tri aspekta uticaja na okruženja projekta(ekonomski, društveni i ekološki uticaji) čine tri aspekta održivosti i primene principaodrživog razvoja na konrektnom projektu. Kao glavni razlozi za odstupanja odplaniranih performansi realizovanih kapitalnih infrastrukturnih projekata u literaturi senavode rizici koji proističu iz specifičnosti ovakvih projekata. Kapitalni infrastrukturniprojekti su, u odnosu na građevinske projekte manje investicione vrednosti, investicionozahtevniji, značajno kompleksniji, prisutna je veća neizvesnost, veći broj učesnika,dugotrajniji su, i njihovi potencijalni efekti na ekonomiju, društvo i okolinu su veći,dalekosežniji i privlače više pažnje javnosti.Prethodna istraživanja takođe otkrivaju da, za sada, ne postoji jedinstvena metodologijaza procenu održivosti infrastrukturnih objekata u ranim fazama realizacije investicionogprojekta.Konačno, oblast upravljanja rizicima prilikom realizacije infrastrukturnih projekata nijeu dovoljnoj meri obrađena u domaćoj stručnoj i naučnoj literaturi.U prvom delu istraživanja za potrebe ove disertacije sprovedeno je kvantitativnoistraživanje sa ciljem identifikacije ključnih rizika po ostvarenje troškovnih ivremenskih performansi projekata izgradnje infrastrukturnih objekata u Srbiji. Osimtoga, ispitano je i postojanje prakse upravljanja rizicima na investicionim projektima uSrbiji. Dobijeni rezultati tog dela istraživanja su pokazali da su najznačajniji rizici prirealizaciji infrastrukturnih objekata u Srbiji: Nedostatak finansijskih sredstava zarealizaciju projekta, Finansijski rizik, Politički rizik i Korupcija. Takođe, bez obzira štopostoji svest da je primena upravljanja rizicima važna i što postoji potreba za njegovomprimenom, u Srbiji se upravljanje rizicima ne primenjuje dovoljno i prisutan je manjakznanja u vezi sa upravljanjem rizicima. Međutim, među praktičarima iz oblastigrađevinarstva postoji izražena zainteresovanost da se o upravljanju rizicima nauči više.S obzirom na ovakve rezultate, u daljem istraživanju analizirani su i prikazani mogućipristupi za analizu rizika i integraciju analize ekonomske, socijalne i ekološke održivostiprojekta u fazi formiranja koncepcije kapitalnog infrastrukturnog projekta. Predloženasu i razmotrena dva pristupa – kvalitativna i kvantitativna analiza rizika, uz primenusocijalne Cost-Benefit analize (SCBA). Mogućnost i implikacije praktične primenepredloženih pristupa analizirani su na primeru dve studije slučaja kapitalnihinfrastrukturnih objekata (izgradnja postrojenja za insineraciju komunalnog čvrstogotpada i izgradnja deonice auto-puta).U disertaciji je pokazano da primena predstavljene SCBA uz monetarizaciju eksternihefekata projekata omogućava svođenje na istu meru i sveobuhvatno sagledavanjepotencijalnih ekonomskih, društvenih i ekoloških uticaja projekta kroz ceo životniciklus. Primena kvalitativne analize rizika omogućava pravovremenu identifikaciju,rangiranje i sistematičan prikaz potencijalnih pretnji po ostvarenje pojedinih ciljevaprojekta, te predlog mera za otklanjanje ili umanjenje pretnji. Stohastički pristup iMonte-Carlo analiza za kvantitativnu analizu rizika u studiji opravdanosti doprinosevećoj pouzdanosti procene finansijskih i društveno-ekonomskih rezultata projekta.Prikazanu metodologiju i pristup je moguće koristiti u budućim predinvesticionimanalizama kapitalnih infrastrukturnih objekata, naročito na domaćem tržištu i tržištuzemalja u razvoju.Cilj daljeg istraživanja bilo je ispitivanje mogućnosti za razvoj ekspertskog sistema zaprocenu rizika u ranim fazama realizacije kapitalnih infrastrukturnih projekata. Izvršenaje provera hipoteze da je na osnovu poznatih istorijskih podataka o ostvarenjuplaniranih troškova i rokova realizacije i o karakteristikama realizovaniih kapitalniihinfrastrukturniih projekata i njihovog okruženja moguće napraviti model za predviđanjeuspešnosti realizacije na novim projektima, ukoliko su karakteristike novih projekata injihovog okruženja poznate. Usvojena metodologija istraživanja podrazumevala jenajpre prikupljanje podataka sa realizovanih kapitalnih infrastrukturnih projekata,njihovu pripremu a zatim analizu primenom metoda mašinskog učenja. Mašinskoučenje je oblast kompjuterskih nauka koja se bavi kreiranjem i analizom metoda nakojima počivaju računarski programi koji uče iz iskustva.Prikupljeni su podaci o 30 saobraćajnih, 12 energetskih i 2 hidrotehnička kapitalnaprojekta (ukupno 44 projekta, svaki vrednosti preko petsto miliona evra) realizovana nateritoriji Evrope. Podaci su sistematizovani u obliku 3 binarna pokazatelja uspešnostiprojekata (prekoračenje troškova, kašnjenje u fazi građenja i kašnjenje u fazi planiranja)i 46 binarnih atributa projekata, koji opisuju izvore rizika iz 5 kategorija: učesnici naprojektu (interni i eksterni), spoljašnje okruženje projekta (pravno, društvenoekonomsko,političko), upravljanje projektom, tehnološki aspekti, razno. Metodologijaprikupljanja i pripreme podataka zasnivala se na metodologiji rada formiranoj u okvirumeđunarodne naučne COST akcije TU1003: "Megaproject – Efficient Design andDelivery of Megaprojects in the European Union". Zatim je, prema originalnoosmišljenoj metodologiji, zasnovanoj na prethodnim istraživanjima u oblastima procenerizika i primene metoda mašinskog učenja u upravljanju projektima, izvršena uporednaanaliza performansi dvanaest predloženih modela za predviđanje prekoračenjaMiljan S. Mikić, dipl. građ. inž. 8planiranih troškova izgradnje, kašnjenja u fazi građenja, kao i kašnjenja u fazi planiranjarealizacije projekata. Ispitana je mogućnost kombinovane primene statističkih metoda(Selekcija podskupa atributa zasnovana na korelaciji i Selekcija zasnovana na vrednostiinformacionog dobitka) i metoda mašinskog učenja (Metoda vektora podrške, Veštačkeneuralne mreže, K-najbližih suseda, Drvo odlučivanja, Naivni Bajesov klasifikator iLogistička regresija).Dobijeni rezultati su dokazali da je za dati skup prikupljenih podataka bilo mogućenapraviti modele za predviđanje navedenih pokazatelja uspešnosti u ranoj fazirealizacije kapitalnih infrastrukturnih projekata.Istraživanje predmetnog skupa podataka je takođe identifikikovalo podskupove odrelativno malog broja ključnih izvora rizika iz faze pre početka građenja (3-10, zavisnood problema) čije poznavanje je dovoljno da se ostvare dobijene, relativno visokeperformanse predviđanja. Za dati skup prikupljenih podataka, najznačajnijeidentifikovane kategorije rizika jesu: Društveno-ekonomsko okruženje projekta,Eksterni učesnici na projektu i Tehnološki aspekti projekta.Veoma bitna distinkcija primenjenog pristupa u odnosu na analizu korelacijepojedinačnih izvora rizika i pokazatelja performansi projekata jeste da se ovde nastojiutvrditi zajednički uticaj koji više izvora rizika istovremeno imaju na performanseprojekata.Primena predloženih modela, za rano predviđanje uspešnosti realizacije projekata,najveću korist donela bi investitoru i donosiocima odluka u ranoj fazi realizacijeprojekta, jer bi mogla da pruži bolji uvid u očekivane performanse datog projekta, kao ida upozori na izvore rizika zbog kojih bi performanse projekta potencijalno mogle bitiugrožene.Kako bi ekspertski sistem za procenu rizika prilikom pokretanja i realizacije kapitalnihinfrastrukturnih projekata bio zaokružen, neophodan je dalji rad na dopunjavanju bazepodataka., A construction investment project is defined as a complex technical and technological,organizational, legal, economic and financial endeavour that consists of a set ofcoordinated and controlled activities with a clearly defined beginning and end, with thegoal of building, reconstructing, modifying and/or equipping a facility or facilities thatare required by the investor. Project and project environment complexity is particularlyemphasised on large infrastructure investment projects.The subject of the research in this dissertation are large infrastructure projects with aninvestment value of more than fifty million euros. The projects of planning andconstruction of hard (physical) economic infrastructure were investigated; thoseincluded ones in the traffic (highways, railways, subway lines and airports), energy(facilities for the production and transmission of electricity and gas) and hydro-technicalsector.The above listed projects represent the development engines of any society and state.Given the potential long-term economic, social and environmental effects that largeinfrastructure projects can produce, their planning and construction process is alwaysfollowed closely by the entire society.Previous research shows that, despite the importance of large infrastructure projects,their implementation is often unsuccessful, both in terms of failure to meet thetraditional project success criteria (cost, time, quality), as well as in terms of the adverseeconomic, social and environmental effects that the projects can create. Analysis ofthese three impacts (economic, social and environmental), as aspects of sustainability,allows for the incorporation of sustainable development principles within a specificproject. In the literature, risks that arrise from specific characteristics of largeinfrastructure projects are identified as the main cause of deviations from the plannedperformance of large infrastructure projects. In comparison to construction projects ofsmaller investment value, large infrastructure projects are: financially more demanding;significantly more complex; carry a greater uncertainty; include more stakeholders; areMiljan S. Mikić, dipl. građ. inž. 11longer lasting, and their potential effects on the economy, society and the environmentare greater, more far-reaching and generate more public attention.At present, there is no single accepted methodology for sustainability assessment in theearly phase (phase of conducting pre-feasiblity anf feasibility study) of an investmentproject.Additionally, the area of risk management on infrastructure projects is not sufficientlyaddressed in the domestic professional and scientific literature.In the first part of the dissertation, quantitative research was conducted in order toidentify the key risks to achieving cost and time performance of infrastructureconstruction projects in Serbia. In addition, risk management practices related toinvestment projects in Serbia were investigated. Research results showed that the mostsignificant risks associated with construction infrastructure projects in Serbia are: thelack of funds for project implementation; financial and political risks; and corruption.Also, regardless of the fact that there is awareness of the importance of riskmanagement and the need for its implementation, risk management is not implementedwell in Serbia and there is a lack of knowledge in relation to risk management.However, there is a strong interest to learn more about risk management among thepractitioners in the construction field.Considering obtained results, in further research, possible approaches for risk analysisand integration of project economic, social and environmental sustainability analysiswere addressed. Two approaches were proposed and investigated – a qualitative and aquantitative risk analysis, along with applying a Social Cost-Benefit Analysis (SCBA).The possibility and implications of the practical application of the proposed approacheswere analysed on two case studies of major infrastructure projects (Municipal solidwaste incineration plant and a Motorway section).The application of the presented SCBA with monetization of the project external effectsallows for comprehensive consideration of the potential economic, social andenvironmental impacts of the project throughout the entire life cycle of theinfrastructure facility. The application of qualitative risk analysis enables the timelyidentification, ranking and systematic overview of potential threats for the achievementof specific project objectives and the proposal of measures for the elimination orreduction of threats. The stochastic approach and Monte-Carlo Analysis for quantitativerisk analysis in the project feasibility study allows the higher reliability of assessment ofthe project financial and socio-economic results. The studied methodology andapproach can be used in future pre-investment analyses of major infrastructure facilities,especially in the domestic market and the market of developing countries.The further objective of this dissertation was to examine the possiblity for developingan expert system for risk assessment in the early phase of large infrastructure projects.The hypothesis was that based on the known historical data on the achievement ofplanned cost and deadlines and the characteristics of large infrastructure projects andtheir environment, it is possible to create a model that can predict the success or failure(regarding cost and time performance) of new projects, if the characteristics of newprojects and their environment are known. The adopted research methodology consistedof data collection from completed large infrastructure projects, data preparation andanalysis using machine learning methods. Machine learning is a field of computerscience that deals with the creation and analysis of methods that are used by computerprograms that learn from experience. In previous studies, it has been proven that certainmachine learning methods can be successfully used to predict the performance ofconstruction investment projects.Data from 30 traffic, 12 energy and 2 hydro-technical large infrastructure projects (atotal of 44 projects, each with the investment value of more than five hundred millioneuros) completed in Europe were collected. The data were transformed to the form ofthree binary project success indicators (Cost overrun, Delay in the construction phaseand a Delay in the planning phase) and 46 binary project attributes, which describe thesources of risk from five categories of project characteristics and characteristic of theproject environment: Project stakeholders (internal and external); The externalenvironment of the project (legal, socio-economic, political); Project management;Technological aspects; and Miscellaneous. The methodology of collecting andpreparing the data was based on the methodology of work of the international scientificCOST Action TU1003: "Megaproject - Efficient Design and Delivery of Megaprojectsin the European Union". Then, according to the newly proposed methodology that wasbased on previous research in the areas of risk assessment and the application ofmachine learning methods in project management, a comparative analysis of theperformance of the twelve proposed models for the prediction of the exceedance of theplanned construction costs, the delay in the construction phase, as well as the delay inthe planning phase execution of the projects was performed. The possibility of thecombined application of statistical methods (the selection of a subset of attributes basedon correlation and the selection based on the value of information gain) and machinelearning methods (Support vectors machine, Artificial neural networks, K-nearestneighbour, Decision tree, Naive Bayesian classifier, Logistic regression) was analysed.The results have shown that, for a given set of collected data, it was possible to buildmodels that predict success indicators in the early implementation stage of largeinfrastructure projects.The research also resulted with the identification of subsets of a relatively small numberof key sources of risk from the pre-construction phase of project development (3-10sources of risk, depending on the problem) whose knowledge is sufficient to yieldrelatively high performance predictions for a given set of collected data. The mostimportant identified risk categories are: the socio-economic environment of the project;the external stakeholders in the project; and the technological aspects of the project.A very important distinction between the approach applied in this dissertation and thecorrelation analysis of individual sources of risk and project performance indicators isthat in this dissertation the attempt was to determine the combined concurrent effect ofmultiple sources of risk on project performance.The greatest benefit of the application of proposed models for the early prediction ofproject success is to the investor and the decision-makers at the early stage of a project,as the models can provide a better insight into the expected performance of a givenproject, as well as to draw attention to the sources of risk that would potentiallyendanger project performance.In order to finalize the expert system for risk assessment during the planning andconstruction phases of large infrastructure projects, further research should be aimed atbroadening the database of large infrastructure projects.",
publisher = "Универзитет у Београду, Грађевински факултет",
journal = "Универзитет у Београду",
title = "Upravljanje rizicima pri izgradnji kapitalnih infrastrukturnih objekata u cilju poboljšanja njihove održivosti, Risk management during planning and construction of large infrastructure projects for improving their sustainability",
url = "https://hdl.handle.net/21.15107/rcub_nardus_4184"
}
Mikić, M.. (2015). Upravljanje rizicima pri izgradnji kapitalnih infrastrukturnih objekata u cilju poboljšanja njihove održivosti. in Универзитет у Београду
Универзитет у Београду, Грађевински факултет..
https://hdl.handle.net/21.15107/rcub_nardus_4184
Mikić M. Upravljanje rizicima pri izgradnji kapitalnih infrastrukturnih objekata u cilju poboljšanja njihove održivosti. in Универзитет у Београду. 2015;.
https://hdl.handle.net/21.15107/rcub_nardus_4184 .
Mikić, Miljan, "Upravljanje rizicima pri izgradnji kapitalnih infrastrukturnih objekata u cilju poboljšanja njihove održivosti" in Универзитет у Београду (2015),
https://hdl.handle.net/21.15107/rcub_nardus_4184 .

AHP based contractor selection procedure for highway infrastructure projects in Serbia

Petronijević, Marija; Nikolić, Ana; Mikić, Miljan; Ivansevic, Nenad

(Croatian Association for Construction Management ; University of Zagreb, Faculty of Civil Engineering, Zagreb, 2015)

TY  - CONF
AU  - Petronijević, Marija
AU  - Nikolić, Ana
AU  - Mikić, Miljan
AU  - Ivansevic, Nenad
PY  - 2015
UR  - https://grafar.grf.bg.ac.rs/handle/123456789/1348
PB  - Croatian Association for Construction Management ; University of Zagreb, Faculty of Civil Engineering, Zagreb
C3  - 12th International conference organization, technology and management in construction (OTMC 2015) : conference proceedings
T1  - AHP based contractor selection procedure for highway infrastructure projects in Serbia
EP  - 214
SP  - 206
UR  - https://hdl.handle.net/21.15107/rcub_grafar_1348
ER  - 
@conference{
author = "Petronijević, Marija and Nikolić, Ana and Mikić, Miljan and Ivansevic, Nenad",
year = "2015",
publisher = "Croatian Association for Construction Management ; University of Zagreb, Faculty of Civil Engineering, Zagreb",
journal = "12th International conference organization, technology and management in construction (OTMC 2015) : conference proceedings",
title = "AHP based contractor selection procedure for highway infrastructure projects in Serbia",
pages = "214-206",
url = "https://hdl.handle.net/21.15107/rcub_grafar_1348"
}
Petronijević, M., Nikolić, A., Mikić, M.,& Ivansevic, N.. (2015). AHP based contractor selection procedure for highway infrastructure projects in Serbia. in 12th International conference organization, technology and management in construction (OTMC 2015) : conference proceedings
Croatian Association for Construction Management ; University of Zagreb, Faculty of Civil Engineering, Zagreb., 206-214.
https://hdl.handle.net/21.15107/rcub_grafar_1348
Petronijević M, Nikolić A, Mikić M, Ivansevic N. AHP based contractor selection procedure for highway infrastructure projects in Serbia. in 12th International conference organization, technology and management in construction (OTMC 2015) : conference proceedings. 2015;:206-214.
https://hdl.handle.net/21.15107/rcub_grafar_1348 .
Petronijević, Marija, Nikolić, Ana, Mikić, Miljan, Ivansevic, Nenad, "AHP based contractor selection procedure for highway infrastructure projects in Serbia" in 12th International conference organization, technology and management in construction (OTMC 2015) : conference proceedings (2015):206-214,
https://hdl.handle.net/21.15107/rcub_grafar_1348 .

Current strategy for highway construction in the Republic of Serbia

Ivanišević, Nenad; Arizanović, Dragan; Petronijević, Predrag; Mikić, Miljan

(Društvo građevinskih konstruktera, Beograd, 2014)

TY  - CONF
AU  - Ivanišević, Nenad
AU  - Arizanović, Dragan
AU  - Petronijević, Predrag
AU  - Mikić, Miljan
PY  - 2014
UR  - https://grafar.grf.bg.ac.rs/handle/123456789/1250
AB  - In order to achieve the economic development of the Republic of Serbia, it is necessary to provide adequate traffic infrastructure, particularly highways. The second lane on the northern branch of Corridor X (E-75) from Horgoš to Belgrade has been completed, and the construction works on the eastern branch (E-80) from Niš to the Bulgarian border and on the southern branch (E-75) from Leskovac to the Macedonian border are ongoing. Works are also in progress on the Belgrade bypass. Works on the E-763 ("Corridor 11") are executed between Obrenovac and Preljina. Continuation of this road towards Montenegro is being prepared. Also preparations for the highway on the E-761 from Pojate to Preljina are ongoing.
AB  - U cilju ostvarivanja ekonomskog razvoja Republike Srbije neophodno je obezbediti odgovarajuću saobraćanu infrastrukturu, a naročito autoputsku. Završena je izgradnja druge trake na severnom kraku Koridora X (E-75) od Horgoša do Beograda, a u toku je izvođenje radova na istočnom kraku (E-80) od Niša do granice sa Bugarskom i južnom kraku (E-75) od Leskovca do granice sa Makedonijom. Takođe su u toku radovi na obilaznici Beograda. Radovi na E-763 (“Koridor 11”) se izvode od Obrenovca do Preljine, a u pripremi je nastavak ovog puta prema Crnoj Gori kao i autoput na E-761 od Pojata do Preljine
PB  - Društvo građevinskih konstruktera, Beograd
C3  - Zbornik radova / DGKS Društvo građevinskih konstruktera Srbije, 14. kongres, Novi Sad, 24-26. oktobar, 2014
T1  - Current strategy for highway construction in the Republic of Serbia
T1  - Aktuelna strategija realizacije izgradnje autoputeva u Republici Srbiji
EP  - 120
SP  - 109
UR  - https://hdl.handle.net/21.15107/rcub_grafar_1250
ER  - 
@conference{
author = "Ivanišević, Nenad and Arizanović, Dragan and Petronijević, Predrag and Mikić, Miljan",
year = "2014",
abstract = "In order to achieve the economic development of the Republic of Serbia, it is necessary to provide adequate traffic infrastructure, particularly highways. The second lane on the northern branch of Corridor X (E-75) from Horgoš to Belgrade has been completed, and the construction works on the eastern branch (E-80) from Niš to the Bulgarian border and on the southern branch (E-75) from Leskovac to the Macedonian border are ongoing. Works are also in progress on the Belgrade bypass. Works on the E-763 ("Corridor 11") are executed between Obrenovac and Preljina. Continuation of this road towards Montenegro is being prepared. Also preparations for the highway on the E-761 from Pojate to Preljina are ongoing., U cilju ostvarivanja ekonomskog razvoja Republike Srbije neophodno je obezbediti odgovarajuću saobraćanu infrastrukturu, a naročito autoputsku. Završena je izgradnja druge trake na severnom kraku Koridora X (E-75) od Horgoša do Beograda, a u toku je izvođenje radova na istočnom kraku (E-80) od Niša do granice sa Bugarskom i južnom kraku (E-75) od Leskovca do granice sa Makedonijom. Takođe su u toku radovi na obilaznici Beograda. Radovi na E-763 (“Koridor 11”) se izvode od Obrenovca do Preljine, a u pripremi je nastavak ovog puta prema Crnoj Gori kao i autoput na E-761 od Pojata do Preljine",
publisher = "Društvo građevinskih konstruktera, Beograd",
journal = "Zbornik radova / DGKS Društvo građevinskih konstruktera Srbije, 14. kongres, Novi Sad, 24-26. oktobar, 2014",
title = "Current strategy for highway construction in the Republic of Serbia, Aktuelna strategija realizacije izgradnje autoputeva u Republici Srbiji",
pages = "120-109",
url = "https://hdl.handle.net/21.15107/rcub_grafar_1250"
}
Ivanišević, N., Arizanović, D., Petronijević, P.,& Mikić, M.. (2014). Current strategy for highway construction in the Republic of Serbia. in Zbornik radova / DGKS Društvo građevinskih konstruktera Srbije, 14. kongres, Novi Sad, 24-26. oktobar, 2014
Društvo građevinskih konstruktera, Beograd., 109-120.
https://hdl.handle.net/21.15107/rcub_grafar_1250
Ivanišević N, Arizanović D, Petronijević P, Mikić M. Current strategy for highway construction in the Republic of Serbia. in Zbornik radova / DGKS Društvo građevinskih konstruktera Srbije, 14. kongres, Novi Sad, 24-26. oktobar, 2014. 2014;:109-120.
https://hdl.handle.net/21.15107/rcub_grafar_1250 .
Ivanišević, Nenad, Arizanović, Dragan, Petronijević, Predrag, Mikić, Miljan, "Current strategy for highway construction in the Republic of Serbia" in Zbornik radova / DGKS Društvo građevinskih konstruktera Srbije, 14. kongres, Novi Sad, 24-26. oktobar, 2014 (2014):109-120,
https://hdl.handle.net/21.15107/rcub_grafar_1250 .

Risks Affecting Traditional snd Sustainable Construction Project Goals

Ivanišević, Nenad; Mikić, Miljan; Arizanović, Dragan; Ivković, Branislav

(Univerzitet Crne Gore, Građevinski fakultet, Podgorica, 2014)

TY  - CONF
AU  - Ivanišević, Nenad
AU  - Mikić, Miljan
AU  - Arizanović, Dragan
AU  - Ivković, Branislav
PY  - 2014
UR  - https://grafar.grf.bg.ac.rs/handle/123456789/1178
PB  - Univerzitet Crne Gore, Građevinski fakultet, Podgorica
C3  - Zbornik radova / Peti Internacionalni naučno-stručni skup Građevinarstvo nauka i praksa
T1  - Risks Affecting Traditional snd Sustainable Construction Project Goals
EP  - 2031
SP  - 2025
UR  - https://hdl.handle.net/21.15107/rcub_grafar_1178
ER  - 
@conference{
author = "Ivanišević, Nenad and Mikić, Miljan and Arizanović, Dragan and Ivković, Branislav",
year = "2014",
publisher = "Univerzitet Crne Gore, Građevinski fakultet, Podgorica",
journal = "Zbornik radova / Peti Internacionalni naučno-stručni skup Građevinarstvo nauka i praksa",
title = "Risks Affecting Traditional snd Sustainable Construction Project Goals",
pages = "2031-2025",
url = "https://hdl.handle.net/21.15107/rcub_grafar_1178"
}
Ivanišević, N., Mikić, M., Arizanović, D.,& Ivković, B.. (2014). Risks Affecting Traditional snd Sustainable Construction Project Goals. in Zbornik radova / Peti Internacionalni naučno-stručni skup Građevinarstvo nauka i praksa
Univerzitet Crne Gore, Građevinski fakultet, Podgorica., 2025-2031.
https://hdl.handle.net/21.15107/rcub_grafar_1178
Ivanišević N, Mikić M, Arizanović D, Ivković B. Risks Affecting Traditional snd Sustainable Construction Project Goals. in Zbornik radova / Peti Internacionalni naučno-stručni skup Građevinarstvo nauka i praksa. 2014;:2025-2031.
https://hdl.handle.net/21.15107/rcub_grafar_1178 .
Ivanišević, Nenad, Mikić, Miljan, Arizanović, Dragan, Ivković, Branislav, "Risks Affecting Traditional snd Sustainable Construction Project Goals" in Zbornik radova / Peti Internacionalni naučno-stručni skup Građevinarstvo nauka i praksa (2014):2025-2031,
https://hdl.handle.net/21.15107/rcub_grafar_1178 .

Global Perception of Sustainable Construction Project Risks

Rafindadi, Aminu Darda'u; Mikić, Miljan; Kovacić, Iva; Cekić, Zoran

(2014)

TY  - CONF
AU  - Rafindadi, Aminu Darda'u
AU  - Mikić, Miljan
AU  - Kovacić, Iva
AU  - Cekić, Zoran
PY  - 2014
UR  - https://grafar.grf.bg.ac.rs/handle/123456789/581
AB  - Sustainability goals move projects away from narrowly focused traditional management oriented ambitions of time, cost and quality, giving attention to economic, environmental and social impacts of construction projects. The recent literature identifies the critical project delivery attributes influencing sustainable building and infrastructure project outcomes as: trust and collaboration between key project participants, their commitment to sustainability, their early involvement and contract conditions. This paper presents results of the still ongoing study which is in relatively under-researched area and examines the global perception of sustainable Construction Project Risks. The survey goals were to compare different stakeholders' evaluation of risks and stakeholders influence on project success. Risk was defined as an implication of uncertainty that could potentially impact project goals, either positively or negatively. Opposite of hypothesis, which was that different stakeholders will prioritize risk sources differently, the findings suggest there is no significant discrepancy between the perceptions of different stakeholders about the sustainable project risks.
C3  - Selected Papers From the 27th Ipma (International Project Management Association)
T1  - Global Perception of Sustainable Construction Project Risks
EP  - 465
SP  - 456
VL  - 119
DO  - 10.1016/j.sbspro.2014.03.051
ER  - 
@conference{
author = "Rafindadi, Aminu Darda'u and Mikić, Miljan and Kovacić, Iva and Cekić, Zoran",
year = "2014",
abstract = "Sustainability goals move projects away from narrowly focused traditional management oriented ambitions of time, cost and quality, giving attention to economic, environmental and social impacts of construction projects. The recent literature identifies the critical project delivery attributes influencing sustainable building and infrastructure project outcomes as: trust and collaboration between key project participants, their commitment to sustainability, their early involvement and contract conditions. This paper presents results of the still ongoing study which is in relatively under-researched area and examines the global perception of sustainable Construction Project Risks. The survey goals were to compare different stakeholders' evaluation of risks and stakeholders influence on project success. Risk was defined as an implication of uncertainty that could potentially impact project goals, either positively or negatively. Opposite of hypothesis, which was that different stakeholders will prioritize risk sources differently, the findings suggest there is no significant discrepancy between the perceptions of different stakeholders about the sustainable project risks.",
journal = "Selected Papers From the 27th Ipma (International Project Management Association)",
title = "Global Perception of Sustainable Construction Project Risks",
pages = "465-456",
volume = "119",
doi = "10.1016/j.sbspro.2014.03.051"
}
Rafindadi, A. D., Mikić, M., Kovacić, I.,& Cekić, Z.. (2014). Global Perception of Sustainable Construction Project Risks. in Selected Papers From the 27th Ipma (International Project Management Association), 119, 456-465.
https://doi.org/10.1016/j.sbspro.2014.03.051
Rafindadi AD, Mikić M, Kovacić I, Cekić Z. Global Perception of Sustainable Construction Project Risks. in Selected Papers From the 27th Ipma (International Project Management Association). 2014;119:456-465.
doi:10.1016/j.sbspro.2014.03.051 .
Rafindadi, Aminu Darda'u, Mikić, Miljan, Kovacić, Iva, Cekić, Zoran, "Global Perception of Sustainable Construction Project Risks" in Selected Papers From the 27th Ipma (International Project Management Association), 119 (2014):456-465,
https://doi.org/10.1016/j.sbspro.2014.03.051 . .
35
20

Finansijska i ekonomska analiza insineracije komunalnog otpada za Novi Sad

Mikić, Miljan; Nikolić, Ana; Naunović, Zorana

(2013)

TY  - CONF
AU  - Mikić, Miljan
AU  - Nikolić, Ana
AU  - Naunović, Zorana
PY  - 2013
UR  - https://grafar.grf.bg.ac.rs/handle/123456789/2716
AB  - Jedina opcija odlaganja komunalnog čvrstog  otpada u Srbiji je za sada deponovanje, bez iskorišćenja energije biogasa. U ovom radu, mogućnost insineracije komunalnog otpada sa iskorišćenjem energije je ispitana na primeru Novog Sada. Ekonomski analiza je izvršena u vidu cost-benefit analize (analize troškova i dobiti) po upustvima Evropske komisije. Primenjena je i analiza pozitivnih i negativnih socijalnih i ekoloških efekata dobijanja električne energije kroz insineraciju otpada. Rezultati su pokazali da bi za insineraciju bila potrebna spoljna finansijska pomoć, ali da je projekat ekonomski pozitivan.
C3  - Otpadne vode, komunalni čvrsti otpad i opasan otpad, 10—12 April 2013, Subotica, Srbija
T1  - Finansijska i ekonomska analiza insineracije komunalnog otpada za Novi Sad
UR  - https://hdl.handle.net/21.15107/rcub_grafar_2716
ER  - 
@conference{
author = "Mikić, Miljan and Nikolić, Ana and Naunović, Zorana",
year = "2013",
abstract = "Jedina opcija odlaganja komunalnog čvrstog  otpada u Srbiji je za sada deponovanje, bez iskorišćenja energije biogasa. U ovom radu, mogućnost insineracije komunalnog otpada sa iskorišćenjem energije je ispitana na primeru Novog Sada. Ekonomski analiza je izvršena u vidu cost-benefit analize (analize troškova i dobiti) po upustvima Evropske komisije. Primenjena je i analiza pozitivnih i negativnih socijalnih i ekoloških efekata dobijanja električne energije kroz insineraciju otpada. Rezultati su pokazali da bi za insineraciju bila potrebna spoljna finansijska pomoć, ali da je projekat ekonomski pozitivan.",
journal = "Otpadne vode, komunalni čvrsti otpad i opasan otpad, 10—12 April 2013, Subotica, Srbija",
title = "Finansijska i ekonomska analiza insineracije komunalnog otpada za Novi Sad",
url = "https://hdl.handle.net/21.15107/rcub_grafar_2716"
}
Mikić, M., Nikolić, A.,& Naunović, Z.. (2013). Finansijska i ekonomska analiza insineracije komunalnog otpada za Novi Sad. in Otpadne vode, komunalni čvrsti otpad i opasan otpad, 10—12 April 2013, Subotica, Srbija.
https://hdl.handle.net/21.15107/rcub_grafar_2716
Mikić M, Nikolić A, Naunović Z. Finansijska i ekonomska analiza insineracije komunalnog otpada za Novi Sad. in Otpadne vode, komunalni čvrsti otpad i opasan otpad, 10—12 April 2013, Subotica, Srbija. 2013;.
https://hdl.handle.net/21.15107/rcub_grafar_2716 .
Mikić, Miljan, Nikolić, Ana, Naunović, Zorana, "Finansijska i ekonomska analiza insineracije komunalnog otpada za Novi Sad" in Otpadne vode, komunalni čvrsti otpad i opasan otpad, 10—12 April 2013, Subotica, Srbija (2013),
https://hdl.handle.net/21.15107/rcub_grafar_2716 .

A sustainability analysis of an incineration project in Serbia

Mikić, Miljan; Naunović, Zorana

(2013)

TY  - JOUR
AU  - Mikić, Miljan
AU  - Naunović, Zorana
PY  - 2013
UR  - https://grafar.grf.bg.ac.rs/handle/123456789/526
AB  - The only option for municipal solid waste (MSW) treatment adopted so far in Serbia is landfilling. Similarly to other south-eastern European countries, Serbia is not recovering any energy from MSW. Fifty percent of electricity in Serbia is produced in coal-fired power plants with emission control systems dating from the 1980s. In this article, the option of MSW incineration with energy recovery is proposed and examined for the city of Novi Sad. A sustainability analysis consisting of financial, economic and sensitivity analyses was done in the form of a cost-benefit analysis following recommendations from the European Commission. Positive and negative social and environmental effects of electricity generation through incineration were valuated partly using conversion factors and shadow prices, and partly using the results of previous studies. Public aversion to MSW incineration was considered. The results showed that the incineration project would require external financial assistance, and that an increase of the electricity and/or a waste treatment fee is needed to make the project financially positive. It is also more expensive than the landfilling option. However, the economic analysis showed that society would have net benefits from an incineration project. The feed-in tariff addition of only Euro0.03 (KWh)(-1) to the existing electricity price, which would enable the project to make a positive contribution to economic welfare, is lower than the actual external costs of electricity generation from coal in Serbia.
T2  - Waste Management & Research
T1  - A sustainability analysis of an incineration project in Serbia
EP  - 1109
IS  - 11
SP  - 1102
VL  - 31
DO  - 10.1177/0734242X13487582
ER  - 
@article{
author = "Mikić, Miljan and Naunović, Zorana",
year = "2013",
abstract = "The only option for municipal solid waste (MSW) treatment adopted so far in Serbia is landfilling. Similarly to other south-eastern European countries, Serbia is not recovering any energy from MSW. Fifty percent of electricity in Serbia is produced in coal-fired power plants with emission control systems dating from the 1980s. In this article, the option of MSW incineration with energy recovery is proposed and examined for the city of Novi Sad. A sustainability analysis consisting of financial, economic and sensitivity analyses was done in the form of a cost-benefit analysis following recommendations from the European Commission. Positive and negative social and environmental effects of electricity generation through incineration were valuated partly using conversion factors and shadow prices, and partly using the results of previous studies. Public aversion to MSW incineration was considered. The results showed that the incineration project would require external financial assistance, and that an increase of the electricity and/or a waste treatment fee is needed to make the project financially positive. It is also more expensive than the landfilling option. However, the economic analysis showed that society would have net benefits from an incineration project. The feed-in tariff addition of only Euro0.03 (KWh)(-1) to the existing electricity price, which would enable the project to make a positive contribution to economic welfare, is lower than the actual external costs of electricity generation from coal in Serbia.",
journal = "Waste Management & Research",
title = "A sustainability analysis of an incineration project in Serbia",
pages = "1109-1102",
number = "11",
volume = "31",
doi = "10.1177/0734242X13487582"
}
Mikić, M.,& Naunović, Z.. (2013). A sustainability analysis of an incineration project in Serbia. in Waste Management & Research, 31(11), 1102-1109.
https://doi.org/10.1177/0734242X13487582
Mikić M, Naunović Z. A sustainability analysis of an incineration project in Serbia. in Waste Management & Research. 2013;31(11):1102-1109.
doi:10.1177/0734242X13487582 .
Mikić, Miljan, Naunović, Zorana, "A sustainability analysis of an incineration project in Serbia" in Waste Management & Research, 31, no. 11 (2013):1102-1109,
https://doi.org/10.1177/0734242X13487582 . .
8
7
8

An approach and software for analysis of financial and economic risks in feasibility study preparation

Mikić, Miljan; Andrić, Jelena; Ivković, Branislav

(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2013)

TY  - JOUR
AU  - Mikić, Miljan
AU  - Andrić, Jelena
AU  - Ivković, Branislav
PY  - 2013
UR  - https://grafar.grf.bg.ac.rs/handle/123456789/480
AB  - Risk is defined as an uncertain event or a condition that, if occurs, could affect project goals. In recent literature the importance of studying uncertainty is underlined, especially in early project phases. In this paper, an approach and software, based on Monte Carlo Analysis, are presented for financial and economic risk analysis in feasibility study preparation. Proposed approach and software can help the decision maker in early project phases and give the basis for project risk management.
AB  - Rizik je neizvestan događaj ili stanje koje, ukoliko nastane, može imati pozitivan ili negativan efekat na ciljeve projekta. U novijoj literaturi ističe se važnost proučavanja neizvesnosti, naročito u ranim fazama realizacije projekta. U ovom radu predstavljen je pristup i računarski program za analizu i procenu finansijskih i ekonomskih rizika i neizvesnosti prilikom izrade studije opravdanosti, koji se zasniva na primeni Monte Karlo analize. Upotreba predloženog modela i programa doprinose boljoj informisanosti donosioca odluka u ranim fazama realizacije, te pružaju podlogu za upravljanje projektnim rizicima.
PB  - Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd
T2  - Izgradnja
T1  - An approach and software for analysis of financial and economic risks in feasibility study preparation
T1  - Pristup i računarski program za analizu finansijskih i ekonomskih rizika pri izradi studije opravdanosti
EP  - 468
IS  - 11-12
SP  - 461
VL  - 67
UR  - https://hdl.handle.net/21.15107/rcub_grafar_480
ER  - 
@article{
author = "Mikić, Miljan and Andrić, Jelena and Ivković, Branislav",
year = "2013",
abstract = "Risk is defined as an uncertain event or a condition that, if occurs, could affect project goals. In recent literature the importance of studying uncertainty is underlined, especially in early project phases. In this paper, an approach and software, based on Monte Carlo Analysis, are presented for financial and economic risk analysis in feasibility study preparation. Proposed approach and software can help the decision maker in early project phases and give the basis for project risk management., Rizik je neizvestan događaj ili stanje koje, ukoliko nastane, može imati pozitivan ili negativan efekat na ciljeve projekta. U novijoj literaturi ističe se važnost proučavanja neizvesnosti, naročito u ranim fazama realizacije projekta. U ovom radu predstavljen je pristup i računarski program za analizu i procenu finansijskih i ekonomskih rizika i neizvesnosti prilikom izrade studije opravdanosti, koji se zasniva na primeni Monte Karlo analize. Upotreba predloženog modela i programa doprinose boljoj informisanosti donosioca odluka u ranim fazama realizacije, te pružaju podlogu za upravljanje projektnim rizicima.",
publisher = "Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd",
journal = "Izgradnja",
title = "An approach and software for analysis of financial and economic risks in feasibility study preparation, Pristup i računarski program za analizu finansijskih i ekonomskih rizika pri izradi studije opravdanosti",
pages = "468-461",
number = "11-12",
volume = "67",
url = "https://hdl.handle.net/21.15107/rcub_grafar_480"
}
Mikić, M., Andrić, J.,& Ivković, B.. (2013). An approach and software for analysis of financial and economic risks in feasibility study preparation. in Izgradnja
Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd., 67(11-12), 461-468.
https://hdl.handle.net/21.15107/rcub_grafar_480
Mikić M, Andrić J, Ivković B. An approach and software for analysis of financial and economic risks in feasibility study preparation. in Izgradnja. 2013;67(11-12):461-468.
https://hdl.handle.net/21.15107/rcub_grafar_480 .
Mikić, Miljan, Andrić, Jelena, Ivković, Branislav, "An approach and software for analysis of financial and economic risks in feasibility study preparation" in Izgradnja, 67, no. 11-12 (2013):461-468,
https://hdl.handle.net/21.15107/rcub_grafar_480 .