Pretraživanje
Prikaz rezultata 51-56 od 56
Productivity planning and control on construction projects / Planiranje i kontrola produktivnosti na građevinskim projektima
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2015)
In this paper, traditional as well as contemporary approaches to productivity planning and control are analyzed and potential improvements are suggested. A new approach is proposed. It is based on: applying separate measures ...
Information system for planning and control of project realization in construction / Informacioni sistem za planiranje i kontrolu realizacije projekata u građevinarstvu
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2005)
The information system for planning and control of project realization in construction industry is presented in this paper. For this information system the process and data model are described. The information system is ...
Particle swarm optimization / Optimizacija pomoću članova rojeva
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2008)
In this work is presented one newer method for optimization of continuous functions which belongs to the heuristic stochastic methods, i.e. to the methods of so called swarm intelligence. This method is mathematically and ...
Implementing a detailed estimation model on housing project prefeasibility studies / Primena detaljnog modela procene za potrebe izrade predinvesticionih studija za projekte izgradnje stambeno-poslovnih objekata
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2010)
In this paper, a new approach is presented for the purpose of making prefeasibility studies. It is based on the detailed estimation of costs and durations even though there is no design present at the beginning of the ...
Superelevation ramp design / Prostorno oblikovanje rampe za nadvišenje spoljne šine
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2010)
This paper presents general criteria for deriving a geometric shape for the transition curve and superelevation ramp, based on kinematic analysis of railway vehicle movement. According to European standard (ENV 13803-1) ...
3D analysis of tunnel lining - rock mass interaction, I: Numerical modelling / 3D analiza interakcije tunelske obloge i stenske mase, I - numeričko modeliranje
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2004)
In the analysis of tunnel lining - rock mass interaction, it is essential to consider partial stress release at the tunnel face, i.e. deformation of the tunnel walling that occurs before the application of the lining. ...