Search
Now showing items 51-58 of 58
Productivity planning and control on construction projects / Planiranje i kontrola produktivnosti na građevinskim projektima
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2015)
In this paper, traditional as well as contemporary approaches to productivity planning and control are analyzed and potential improvements are suggested. A new approach is proposed. It is based on: applying separate measures ...
Eurocode 6: Masonry structures / Evrokod 6 - zidane konstrukcije
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2010)
A general concept of Eurocode 6 - Design of Masonry Structures, as European standard which deals with basic problems of masonry structures, is presented in this paper. Special attention is dedicated to Chapter 3 of the ...
Information system for planning and control of project realization in construction / Informacioni sistem za planiranje i kontrolu realizacije projekata u građevinarstvu
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2005)
The information system for planning and control of project realization in construction industry is presented in this paper. For this information system the process and data model are described. The information system is ...
Implementing a detailed estimation model on housing project prefeasibility studies / Primena detaljnog modela procene za potrebe izrade predinvesticionih studija za projekte izgradnje stambeno-poslovnih objekata
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2010)
In this paper, a new approach is presented for the purpose of making prefeasibility studies. It is based on the detailed estimation of costs and durations even though there is no design present at the beginning of the ...
Superelevation ramp design / Prostorno oblikovanje rampe za nadvišenje spoljne šine
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2010)
This paper presents general criteria for deriving a geometric shape for the transition curve and superelevation ramp, based on kinematic analysis of railway vehicle movement. According to European standard (ENV 13803-1) ...
Alkali activated fly ash geopolymers as a new binder in concrete / Geopolimeri na bazi alkalno aktiviranog elektrofilterskog pepela kao novo vezivo u betonu
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2013)
As the concern for the environment and need for sustainable construction practice continues to grow, research in the field of new materials made with waste materials which have a lower impact on the environment is gaining ...
Walls storey structures and foundations a seismic strengthening design and construction in masonry building extension / Aseizmičko projektovanje i izvođenje ojačanja zidova, međuspratnih konstrukcija i temelja nadograđenih zidanih zgrada
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2014)
Design and construction of masonry building extension in seismic active regions, based on fundamental principles is considered in this paper. Basic principles of modeling, design and construction of elements, as well as ...
Microstructure and durability related properties of recycled aggregate concrete / Mikrostruktura i trajnost betona sa recikliranim agregatom
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2009)
Aspects of environmental safety, sustainable development, natural resources preservation and proper disposal of construction and demolition waste impose recycling as an important production technology of the construction ...