Pretraživanje
Prikaz rezultata 31-40 od 53
Air-water flow on a labyrinth spillway
(Serbian Water Pollution Control Society, Belgrade, 2014)
The design of the Beni Slimane Dam (Medea Province, Algeria) was verified by scale model analyses, conducted on two separate scale models: a partial model of labyrinth spillway and a complete model of spillway structures. ...
Vibrations measurement using wireless sensor network / Merenje vibracija mrežom bežičnih senzora
(Savez inženjera i tehničara Srbije, Beograd, 2012)
Laboratory prototype of a wireless sensor network (WSN) for vibrations measurements on buildings was developed. The system is comprised of sensor devices (nodes) each having main processor board, accelerometer board, ...
Short-term behaviour of reinforced recycled aggregate concrete beams / Ponašanje armiranobetonskih greda od betona na bazi recikliranog agregata pod kratkotrajnim opterećenjem
(Društvo za ispitivanje i istraživanje materijala i konstrukcija Srbije, Beograd, 2009)
Recycling of waste concrete is one of the sustainable solutions for growing waste disposal crisis and depletion of natural aggregate sources. As a result of that process, recycled aggregate (RCA) is produced and it is used ...
Examples of housing rehabilitation multistory masonry buildings damaged in the earthquake in Kraljevo / Primeri sanacije višespratnih stambenih zidanih zgrada oštećenih zemljotresom u Kraljevu
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2011)
The earthquake that struck Kraljevo and its surroundings 3/11/2010. The damage was to a greater or lesser extent, many buildings. Objects that are relatively new and are designed and constructed in accordance with the ...
Estimating the capacity of double side-channel spillways / Procena propusne moći dvostrukog bočnog preliva
(Jugoslovensko društvo za odvodnjavanje i navodnjavanje, Beograd, 2009)
A double side-channel spillway consists of two spillways, with channels joining into a common single branch, noting that for some specific site conditions such arrangements may suit better than the conventional one-side-channel ...
Wind towers: Design of friction connections for assembling sections of tubular steel towers / Vetrogeneratori - proračun tarnog spoja kao montažnog nastavka cilindričnog čeličnog tornja
(Institut za istraživanja i projektovanja u privredi, Beograd, 2012)
The towers represent about 15 to 20% of the total installation costs and optimized design may therefore lead to substantial savings with regard to costs and use of materials. Some of the most interesting design and ...
Hydraulic design of morning glory spillway with a deflector upstream of the vertical bend / Određivanje dimenzija šahtnog preliva empirijskim jednačinama
(Jugoslovensko društvo za odvodnjavanje i navodnjavanje, Beograd, 2012)
Hydraulic design of shaft spillways (morning-glory spillways) with flow deflector before the vertical bend is considered. Based on the physical hydraulic model investigations of several structures and available experience ...
Stresses in the upstream cutoff zone of concrete gravity dams / Naponsko stanje u zoni uzvodnog zuba gravitacione betonske brane
(Jugoslovensko društvo za odvodnjavanje i navodnjavanje, Beograd, 2011)
Upstream cutoff in the concrete gravity dam foundation is introduced as a general stability measure in the beginning of the 20-th century. It become widely accepted in design practice in the late 50-ties. Nevertheless, ...
Seismic hydrodynamic load analysis / Proračun seizmičkih hidrodinamičkih opterećenja
(Jugoslovensko društvo za odvodnjavanje i navodnjavanje, Beograd, 2017)
Zangar's method for computation of seismic hydrodynamic loads acting at the inclined contour of a concrete gravity dam, has been reconsidered. Several numerical models are compared with the procedure recommended by Zangar, ...
Usage of zinc-silicate coatings in friction connections / Primena cink-silikatnih premaza u tarnim spojevima
(Institut za istraživanja i projektovanja u privredi, Beograd, 2016)
Usage of zinc-silicate coatings as anti-corrosive protection of friction connections results in reduction of construction time and provides protection from corrosion. Such protection system has a number of advantages in ...