Application of partitioned multiobjective risk method on extreme events / Primena metode deljenog višeciljnog rizika pri ekstremnim događajima
(Građevinski fakultet Subotica, Subotica, 2015)
Hydraulic structures and systems are almost always conceived, designed, constructed, operated and maintained under the inevitable conditions of risk and uncertainty, where they are expected to achieve multiple and mutually ...
Inovativna metodologija za eksperimentalno određivanje vodoprovodljivosti nezasićenog zemljišta
(Srpsko društvo za odvodnjavanje i navodnjavanje, 2020)
Merenje vodoprovodljivosti zemljišta u nezasićenim uslovima je znatno komplikovanije i tehnički zahtevnije od merenja krive vlažnosti. Zbog toga za određivanje krive vodoprovodljivosti često primenjuju inverzne metode koje ...
Possible use of hydropower potential of cooling water at the thermal power plant / Mogućnost korišćenja hidroenergetskog potencijala vode za hlađenje termoelektrana
(Jugoslovensko društvo za odvodnjavanje i navodnjavanje, Beograd, 2011)
Possibility of using hydropower potential of cooling water at the thermal power plant with open cooling system is presented in the paper. Cooling water flows gravitationally to the recipient - the river. In the periods of ...
Wastewater treatment of Obrenovac Municipality / Prečišćavanje otpadnih voda Obrenovca
(Srpsko društvo za zaštitu voda, Beograd, 2018)
This paper presents technical solution of the wastewater treatment plant (WWTP) for the city of Obrenovac. The results of wastewater quantity and quality measurements at the existing outlet in the Kolubara River were ...
Impact of calibration period on parameter estimates in the conceptual hydrologic models of various structures / Утицај периода калибрације на оцене параметара концептуалних хидролошких модела различитих структура
(Универзитет у Београду, Грађевински факултет, 2015)
Conceptual hydrologic models are commonly applied for flow forecasting, estimation ofdesign flows and assessment of climate change impact on water resources. Therefore,reliability of hydrologic simulations obtained by ...
Upravljanje kišnim oticajem u gradovima u sedam koraka
(Savez inženjera i tehničara Srbije, Beograd, 2017)
Arsenic Removal from Water Using Industrial By-Products
(Hindawi Limited, 2013)
In this study, removal of arsenic ions using two industrial by-products as adsorbents is represented. Removal of As(III) and As(V) from water was carried out with industrial by-products: residual from the groundwater ...
Contaminant buildup and distribution on urban impervious surfaces at parking lots
(Serbian Water Pollution Control Society, Belgrade, 2015)
This paper presents the results of experimental investigations on contaminant buildup, distribution and dynamics on asphalt surfaces of parking lot in Belgrade, Serbia. The investigated pollutants were solids, nutrients, ...
Karakteristike materijala akumuliranih na urbanim površinama i kvalitet kišnog oticaja
(Srpsko društvo za zaštitu voda, Beograd, 2014)