Calculation of stone sill overflowing during low discharges / Proračun prelivanja kamenog praga u rečnom koritu pri malim vodama
(Jugoslovensko društvo za odvodnjavanje i navodnjavanje, Beograd, 2010)
This paper is inspired by a stone sill designed in the channel of the Velika Morava river (near Markovački bridge, Serbia), in order to ensure water supply of the Thermal Power Plant 'Morava' during low flows, and to ...
Marginal distributions for daily runoff series at representative profiles in Serbia / Marginalne raspodele dnevnih proticaja na reprezentativnim profilima u Srbiji
(Jugoslovensko društvo za odvodnjavanje i navodnjavanje, Beograd, 2010)
Previous analyses (Radić & Mihailović, 2006, [8 i [9]) based on new methodology showed the advantages of complete 365 daily data sets analyses against monthly or characteristic daily data. Advantages were demonstrated for ...
Nitrate removal from water by biological denitrification / Uklanjanje nitrata iz vode za piće primenom biološke denitrifikacije
(Jugoslovensko društvo za odvodnjavanje i navodnjavanje, Beograd, 2012)
Ground water pollution by nitrate from routine agricultural practices is a common and growing problem in the major agricultural areas of the world. The concentration of nitrates in these areas may exceed the maximal limited ...
Long-term changes of annual and seasonal flows: A case of the Sava River / Dugoročne promene godišnjih i sezonskih proticaja - primer reke Save
(Jugoslovensko društvo za odvodnjavanje i navodnjavanje, Beograd, 2014)
This paper investigates the long-term changes in the hydrological time series. For this purpose, we use the trend analysis. The trend analysis is performed by using the standard Mann-Kendall trend test and by using the ...
Applicability of the HEC-HMS model for continuous runoff simulations / Mogućnosti za primenu modela HEC-HMS za kontinualne hidrološke simulacije
(Jugoslovensko društvo za odvodnjavanje i navodnjavanje, Beograd, 2014)
To examine the applicability of the HEC-HMS software for continuous runoff simulations, efficiencies of three different HEC-HMC models are assessed. The first and the second models are lumped ones, based on deficit and ...
Problems in creating flood hazard maps / Problemi pri izradi karata ugroženosti od poplava
(Jugoslovensko društvo za odvodnjavanje i navodnjavanje, Beograd, 2014)
This paper deals with problems of creating flood hazard maps, considering methodology and problems of its implementation in practice. A case study, pertaining to production of flood hazard maps for municipality Čačak in ...
Hydraulic design of morning glory spillway with a deflector upstream of the vertical bend / Određivanje dimenzija šahtnog preliva empirijskim jednačinama
(Jugoslovensko društvo za odvodnjavanje i navodnjavanje, Beograd, 2012)
Hydraulic design of shaft spillways (morning-glory spillways) with flow deflector before the vertical bend is considered. Based on the physical hydraulic model investigations of several structures and available experience ...
Stresses in the upstream cutoff zone of concrete gravity dams / Naponsko stanje u zoni uzvodnog zuba gravitacione betonske brane
(Jugoslovensko društvo za odvodnjavanje i navodnjavanje, Beograd, 2011)
Upstream cutoff in the concrete gravity dam foundation is introduced as a general stability measure in the beginning of the 20-th century. It become widely accepted in design practice in the late 50-ties. Nevertheless, ...
Putevi i zaštita vodnih resursa od zagadjenja
(Put i saobraćaj, 2017)
Numerička simulacija strujnog polja u blizini vodozahvata / Numerical simulation of the flow field in the vicinity of an intake structure
(Srpsko društvo za odvodnjavanje i navodnjavanje, 2010)
Rad govori o mogućnostima analize strujnog polja u okolini ulaznih građevina pomoću modela ravanskog i prostornog tečenja. Pokazano je da se numeričkim modelima mogu efikasno odrediti hidrauličke i psamološke karakteristike ...