Hydro-meteorological data quality assurance and improvement
(Univerzitet u Kragujevcu - Fakultet inženjerskih nauka, Kragujevac, 2009)
Advances in measurement equipment and data transfer enabled easy and economic automatic monitoring of various hydro-meteorological variables. The main characteristic of such automatic monitoring systems is that they do not ...
Rationalisation and reliability improvement of fire-fighting systems - the Novi Sad case study
(Urban Water Journal, 2009)
Water supply systems are commonly used to supply fire-fighting water in most EU countries. To provide fast access to water, the standard practice is to install a huge number of hydrants along the entire water supply network. ...
Numerical stability problems in hydrodynamic modelling of confluences with small junction angles
(Universidad de Concepción, 2009)
The paper addresses problems which arise from the use of 3D grids with quadrilateral faces on
the horizontal planes in hydrodynamic modelling of discordant beds asymmetrical confluences
with small junction angles. There ...
Temperature field in roller compacted concrete dams / Temperaturnu polje u gravitacionim branama od valjanog betona
(Savez građevinskih inženjera Srbije, Beograd, 2009)
This paper presents 2D and 3D numerical models for unsteady phased thermal analysis of RCC dams. The time evolution of a thermal field has been modeled with actual dam shape, RCC technology and adequate description of ...
Estimating double side-channel spillway capacity / Procena propusne moći dvostrukog bočnog preliva
(Udruženje za tehnologiju vode i sanitarno inžinjerstvo, Beograd, 2009)
The capacity of the double side-channel spillway, consisting of the two spillways, with channels joining into a common single branch, is estimated in this paper. For the specific site conditions, such an arrangement may ...
Measurements in Belgrade sewer system / Merenja na Beogradskom kanalizacionom sistemu
(Udruženje za tehnologiju vode i sanitarno inžinjerstvo, Beograd, 2009)
The installation of monitoring system at 8 sewer outlets of Belgrade Sewer System has started during 2007. In this paper the extension of that process is presented, where 5 new monitoring sites were equipped and new ...