Numerical simulation of the three-dimensional flow at the confluence of the Sava and Danube Rivers
(Research Publishing Services, 2006)
In this paper, the confluence hydrodynamics at the mouth of the Sava and Danube Rivers in
the city of Belgrade is analysed by means of the three-dimensional numerical model. The
confluence offers excellent possibilities ...
Water distribution system model calibration using genetic algorithm / Kalibracija matematičkih modela vodovodnih sistema primenom genetskog algoritma
(Jugoslovensko društvo za odvodnjavanje i navodnjavanje, Beograd, 2008)
Model calibration is an important step in the modelling of water distribution systems. Since calibration is a process of adjusting model parameters so that model results fit best the measured data, it becomes a complex ...
Physical methods for waste water treatment: The use of freeze/thaw method with the assistance of microwave radiation for oily water treatment / Fizičke metode za prečišćavanje otpadnih voda - primena metode naizmeničnog mržnjenja i hlađenja i mikrotalasnog zagrevanja za obradu zauljenih voda
(Jugoslovensko društvo za odvodnjavanje i navodnjavanje, Beograd, 2005)
The main sources of oily waste water are oil- refineries, metal industry and food industry. Any technological process that uses emulsions has to take into consideration also the treatment of the used emulsions. The ultimate ...
Model generator of water consumption and hydraulic simulation model in water supplying network / Model generator potreba za vodom i hidraulički simulacioni model vodovodne mreže
(Udruženje za tehnologiju vode i sanitarno inžinjerstvo, Beograd, 2007)
Research and development of random sampling procedures in creating model generator of water demand time patterns is shown. Also a composite package combining stochastic nature of water demand and hydrodynamic simulation ...
Flood risk mapping / Kartiranje rizika od poplava
(Jugoslovensko društvo za odvodnjavanje i navodnjavanje, Beograd, 2009)
The paper considers the methodology for the mapping flood zones, flood damages and flood risk. The emphasis is on the development of synthetic flood damage functions, used for the determination of the expected annual ...
2D modelling of water quality in bays / Modeliranje kvaliteta vode u zalivu primenom modela ravanskog tečenja
(Jugoslovensko društvo za odvodnjavanje i navodnjavanje, Beograd, 2007)
Contamination of river waters in terms of scale, intensity, and duration cause such severe problems that application of conventional engineering methods for environmental remediation projects is no longer adequate, and ...
Modelling of water regime in karst / Modeliranje vodnih režima u karstu
(Jugoslovensko društvo za odvodnjavanje i navodnjavanje, Beograd, 2005)
Underground flow regime in karst areas completely differs from flow in intergranular aquifers. Hydraulically, this flow can be better described as a system of reservoirs and pipes with flow under pressure and with free ...
Određivanje garantovanih ekoloških protoka
(Jugoslovensko društvo za odvodnjavanje i navodnjavanje, 2000)
Jedna od ključnih projektnih odluka pri planiranju akumulacija je koliki garantovani ekološki protok odabrati, kao obavezno ispuštanje iz akumulacije. Na bazi analize metoda koje se koriste u svetu za određivanje tog ...
Garantovani ekološki protoka kao ključna mera zaštite voda / Guarantied Ecological Discharge as a Main Water Resources Criterion for Water Protection
(Jugoslovensko društvo za zaštitu vodaDruštvo za zaštitu voda Srbije, 2000)
Izbor garantovanog ekološkog protoka koji se ispušta iz akumulacije jedna je od najvažnijih odluka koja mora da se donese pri planiranju akumulacije. u radu se kritički analiziraju metode za određivanje garantovanog ...
The pressurized pipelines: The risk of bidirectional fluid exchange with the environment / Cevovodi pod pritiskom i rizik od razmene fluida sa okolinom
(Udruženje za tehnologiju vode i sanitarno inžinjerstvo, Beograd, 2009)
The pressurized pipeline fluid transport is supposed to be cheap, reliable and efficient. If buried, pipelines are hard observable by means of leaks, minor cracks and asset damages. These phenomena can influence both the ...