Calibration of a 1D/1D urban flood model using 1D/2D model results in the absence of field data
(Water Science and Technology, 2011)
Recently increased flood events have been prompting researchers to improve existing coupled flood-models such as one-dimensional (1D)/1D and 1D/two-dimensional (2D) models. While 1D/1D models simulate sewer and surface ...
Nitrate removal from water by biological denitrification / Biološka denitrifikacija u pripremi vode za piće
(Udruženje za tehnologiju vode i sanitarno inžinjerstvo, Beograd, 2011)
Ground water pollution by nitrate from routine agricultural practices is a common and growing problem in the major agricultural areas of the world. The concentration of nitrates in these areas may exceed the maximal limited ...
Improvement of chemical control in the water-steam cycle of thermal power plants
(Applied Thermal Engineering, 2011)
A more effective chemical control in the water-steam cycle (WSC) of thermal power plants (TPP) is proposed in this paper. Minimization of corrosion effects by the production of ultra pure water and its strict control is ...
Corrosion of an austenite and ferrite stainless steel weld / Korozija zavarenog spoja austenitnog i feritnog nerđajućeg čelika
(Srpsko hemijsko društvo, Beograd, 2011)
Dissimilar metal connections are prone to frequent failures. These failures are attributed to the difference in the mechanical properties across the weld, the coefficients of thermal expansion of the two types of steels ...
Separation and determination of arsenic species in water by selective exchange and hybrid resins
(Analytica Chimica Acta, 2011)
A simple and efficient method for separation and determination of inorganic arsenic (iAs) and organic arsenic (oAs) in drinking, natural and wastewater was developed. If arsenic is present in water prevailing forms are ...
Analysis of the utility and management of karst underground reservoirs: case study of the Perucac karst spring
(Carbonates and Evaporites, 2011)
The construction of an underground dam and reservoir to provide an artificial water storage and karst control groundwater discharge regime is one of the most complex systems of tapping structure in karst. There are not ...
Criteria for water well design / Kriterijumi za proračun i projektovanje izdašnosti bunara
(Udruženje za tehnologiju vode i sanitarno inžinjerstvo, Beograd, 2011)
Sufficient water well yield is a result of both hydrogeological characteristics of the media and well construction - its design and installation. The choice of water well design and construction materials is influenced by ...
Improved real-time data anomaly detection using context classification
(IWA Publishing, 2011)
The number of automated measuring and reporting systems used in water distribution and sewer systems is dramatically increasing and, as a consequence, so is the volume of data acquired. Since real-time data is likely to ...
Uticajni činioci na rečnim ušćima sa izdignutim dnom pritoke / Controls at river confluences with discordant beds
(Savez građevinskih inženjera Srbije - Beograd, 2011)
U ovom radu se pomoću modela prostornog tečenja ispituje uticaj četiri izabrana činioca na hidrodinamiku ušća sa izdignutim dnom pritoke. To su: ugao uliva 'alfa', odnos sila inercije reke i pritoke MR, odnos [irina korita ...
Analytical models of confluences: A survey and models' assessment / Pregled i ocena analitičkih modela ušća
(Jugoslovensko društvo za odvodnjavanje i navodnjavanje, Beograd, 2011)
Assumptions upon which development of 1D models of free-surface flow rest are not valid at open-channel junctions. Thus, the 1D flow equations cannot be used for calculation of upstream flow depths, or water levels in a ...