Digitalna obrada četrdesetogodišnjih srednjih dnevnih temperatura u Beogradu
(Savremena dostignuća u građevinarstvu, 2016)
Methodology of Design Organization Structure for Management Team at a Large Project
(Univerzitet Crne Gore, Građevinski fakultet, 2010)
The realization of large investment projects is an extremely complex undertaking both from technical and technological, as well as the organizational, legal and financial standpoint. Certainly that approach to the realization ...
Critical risks in Serbian infrastructure projects
(Proceedings of 11th International Conference: "Organization, Technology and Management in Construction", September 2013, Dubrovnik, Croatia, 2013)
Infrastructure projects are usually followed by numerous standard, but also specific risks associated with project cost, schedule, quality, performance, health and safety aspects, environmental aspects, as well as with ...
Multicriteria optimizing of construction equipment selection by AHP method
(Hrvatska udruga za organizaciju građenja, 2011)
Construction equipment is a key resource in the realization of construction projects.
Correct and careful planning in the usage of construction equipment plays a vital role in the
economic success of every construction ...
The Impact of the Daily Temperatures Variation on Dynamic Parameters of Thermal Envelope / Uticaj perioda dnevnih varijacija temperatura na dinamičke parametre termičkog omotača zgrade
(Univerzitet Crne Gore, Građevinski fakultet, Podgorica, 2016)
The Successful Delivery of Megaprojects: A Novel Research Method
(SAGE Publications Inc., 2017)
Megaprojects are often associated with poor delivery performance and poor benefits realization. This article provides a method of identifying, in a quantitative and rigorous manner, the characteristics related to project ...
Struktura projekta organizacije građenja
(Građevinski fakultet u Podgorici, 2012)
Projektovanje organizacije građenja je neizbežan deo pripreme za realizaciju projekta.
Iako važan, ovaj deo pripreme tehničke dokumentacije pati od niza mana nastalih kao
posledica vrlo kratkog roka, nedostupnosti svih ...
Selection optimization and allocation of earthmoving equipment on construction projects
(Belgrade, Serbia : University of Belgrade, Faculty of Organizational Sciences, 2019)
Cilj ovog istraživanja je izbor i alokacija mehanizacije na građevinskim projektima. Sa ovim problemom često se susreću građevinske firme u praksi kada konkurišu za velike građevinske projekte. Optimizacija izbora i alokacija ...
Određivanje opterećenja loma dvopojasnih sistema primenom fuzzy (rasplinutih) brojeva
(Savez građevinskih inženjera Srbije, 2019)
U ovome radu se prikazano određivanja faktora graničnog opterećenja loma dvopojasnih nosača od betona i čelika pomoću fuzzy linearnog programiranja sa nepreciznim ulaznim podacima.. Problem je analiziran za eksperimentalne ...
Application of Fuzzy AHP Method for Choice of Objects for Maintenance and Reconstruction
(Savez građevinskih inženjera Srbije, 2015)
The choice of objects for maintenance and reconstruction using Fuzzy AHP (Analytic Hierarchy Process) method will be presented in this paper. This method, as one of the efficient methods for multicriteria decision making ...