Претраживање
Приказ резултата 61-70 од 86
One procedure of Fuzzy AHP based on eigenvalues
(Univerzitet u Beogradu, Fakultet organizacionih nauka, 2013)
One procedure of fuzzy AHP that is based on eigenvalues is presented in this paper. According to
expected values of fuzzy numbers, one method for determination of fuzzy eigenvalues and eigenvectors is
proposed and used ...
Composite structural members in fire conditions and measures of protection / Spregnuti elementi u uslovima požara i mere zaštite
(Građevinski fakultet, Subotica, 2017)
In this paper, the results of numerical simulation of 2D non-stationary temperature fields in commonly used composite structural members made of steel and concrete in fire conditions were presented. Simulation is based on ...
CFD simulation of thermal performances of building structure with expanded polystyrene (EPS) as thermal insulation
(Proceedings of 3rd International Conference on Electrical, Electronic and Computing Engineering IcETRAN 2016, Zlatibor, Serbia, June 13 – 16, 2016, 2016)
In this paper a three dimensional (3D), Computational Fluid Dynamics (CFD) simulation for indoor air flow and heat transfer in a single room was developed. The multi-layer structure building envelop, with expanded polystyrene ...
Post-projektna analiza – studija slučaja za linijski infrastrukturni objekat
(Šesti međunarodni naučno-stručni simpozijum Instalacije i arhitektura, Beograd, 10. decembar 2015., 2015)
Post-projektnu analizu čine sve aktivnosti čiji je cilj sagledavanje parametara kako je objekat izveden, uključujući i to u kojoj meri on ispunjava projektovane zahteve, kao i to u kom stepenu su sami korisnici zadovoljni ...
Primena metode za analizu kašnjenja na projektu sa studijom slučaja
(15. kongres Društva građevinskih konstruktera Srbije, Zlatibor, 6-8. 9. 2018, 2018)
Vreme za izvođenje radova je parametar koji je od suštinskog značaja i za izvođača i za investitora. Za vlasnika projekta to je izgubljeni profit koji proizilazi iz nemogućnosti eksploatacije objekta u planiranom roku, dok ...
Digitalna obrada četrdesetogodišnjih srednjih dnevnih temperatura u Beogradu
(Savremena dostignuća u građevinarstvu, 2016)
Methodology of Design Organization Structure for Management Team at a Large Project
(Univerzitet Crne Gore, Građevinski fakultet, 2010)
The realization of large investment projects is an extremely complex undertaking both from technical and technological, as well as the organizational, legal and financial standpoint. Certainly that approach to the realization ...
Critical risks in Serbian infrastructure projects
(Proceedings of 11th International Conference: "Organization, Technology and Management in Construction", September 2013, Dubrovnik, Croatia, 2013)
Infrastructure projects are usually followed by numerous standard, but also specific risks associated with project cost, schedule, quality, performance, health and safety aspects, environmental aspects, as well as with ...
Experimental determination of dynamic parameters of heat passage through the facade wall of a weekend cottage on mountain Kopaonik, Serbia
(Faculty of civil engineering and architecture / University of Niš and Serbian academy of sciences and arts - branch in Niš, 2023)
In this paper, using a dynamic RC model for heat transfer in a room on the ground floor,
the three-time constants of heat transfer that corresponds to the different parts of a
weekend cottage on Kopaonik were determined. ...
The Impact of the Daily Temperatures Variation on Dynamic Parameters of Thermal Envelope / Uticaj perioda dnevnih varijacija temperatura na dinamičke parametre termičkog omotača zgrade
(Univerzitet Crne Gore, Građevinski fakultet, Podgorica, 2016)