Search
Now showing items 1-10 of 141
Construction technology and quality control of works on Atlas Capital Center / Tehnologija građenja i kontrola kvaliteta radova na primjeru objekta Atlas Capital Center
(Univerzitet u Beogradu - Fakultet organizacionih nauka, Beograd, 2012)
With the arrival of foreign investors in Montenegro, a need for application of FIDIC international conditions of contracts emerged. These conditions define in detail the rights and obligations of the contractual parties ...
Simple Building Information Modeling by using Industry Foundation Classes
(Faculty of Mechanical Engineering, Belgrade, 2018)
Софтверско-хардверско решење за естимацију термалног импулсног одзива вишеслојног равног зида
(Univerzitet u Beogradu, Građevinski Fakultet, 2020)
On the role of circular sections of quadric surfaces
(Innsbruck University Press, Innsbruck, 2014)
As a part of new advanced course curriculum of Descriptive geometry, in the Faculty of Civil engineering, creative 3D modeling of specific structures is included. These structures, inspired by contemporary architecture ...
Kontrola produktivnosti na građevinskim projekatima zasnovana na ključnim resursima
(16. međunarodna naučna konferencija ''Planiranje, projektovanje, izvođenje i obnova graditeljstva INDiS 2023'', 2023, 2023)
Produktivnost predstavlja jedan od ključnih indikatora građevinske proizvodnje, kao i
faktor koji bitno utiče na visinu nepotrebnih troškova. Unapređenjem produktivnosti
stvaraju se preduslovi za smanjenje proizvodne ...
Temperature variation of "Bajina Bašta" dam between 1995-2015 / Temperature u brani i akumulaciji "Bajina Bašta" u periodu 1995-2015
(Građevinski fakultet, Subotica, 2016)
In this paper, the data for the observed temperatures (of the air, body of the dam and water in the reservoir), for "Bajina Bašta" Dam, during the 20-years period, are presented. The data were used to predict the unsteady ...
Vremenska distribucija uzroka kašnjenja kao nov pristup otkrivanju baznih uzroka kašnjenja / Temporal distribution of causes of delay as a new approach to discovering the root causes of delay
(27th International project management congress, Vrnjačka Banja, 8-10 June, 2023, 2023)
Građevinski projekti su jedinstveni, dinamični i složeni. Karakteriše ih multidisciplinarno okruženje i veliki broj učesnika koji proizvode značajan obim podataka. Ovo su samo neki od razloga zašto građevinski projekti ne ...
Aktuelno stanje realizacije izgradnje autoputeva u Republici Srbiji
(Univerzitet Crne Gore, Građevinski fakultet, Podgorica, 2016)
Information technology application in construction industry / Primena informacionih tehnologija u građevinarstvu
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2004)
In this paper information technology application in construction industry is analyzed. New technology application gives new possibilities but makes new problems. Main characteristics of construction industry are emphasized ...