Application of semi-Markov decision process in bridge management
(International Association for Bridge and Structural Engineering (IABSE), 2015)
The state-of-the-art Bridge Management Systems (BMSs) feature tightly coupled deterioration and preservation optimization model that enable determining the most cost-effective maintenance strategies at both the project and ...
Vulnerability Assessment of Bridges Exposed to Scour
(Transportation Research Record, 2013)
To improve the allocation of funds for the maintenance and risk mitigation of transportation infrastructure, there is a dire need for a simplified, yet sufficiently accurate, methodology to estimate bridge vulnerability ...
Methods of calculating depreciation expenses of construction machinery / Metode proračuna troškova depresijacija građevinskih mašina
(Institut za istraživanja i projektovanja u privredi, Beograd, 2012)
Depreciation expenses represent a significant part of total expenses of construction machinery. Precise calculation of depreciation expenses is often difficult or impossible. Straight line method of depreciation, which is ...
Current strategy for highway construction in the Republic of Serbia / Aktuelna strategija realizacije izgradnje autoputeva u Republici Srbiji
(Društvo građevinskih konstruktera, Beograd, 2014)
In order to achieve the economic development of the Republic of Serbia, it is necessary to provide adequate traffic infrastructure, particularly highways. The second lane on the northern branch of Corridor X (E-75) from ...
Application of Fuzzy Logic on Selection of Contractors for Construction of High Rise Buildings
(Institute of Physics Publishing, 2019)
Selection process of a construction contractor is highly important and successful implementation of a project and realization of sustainability are largely dependent on it. Computer programs - expert systems - may be used ...
Ex post analysis of road projects: resilience to crisis
(Editorial Board EJTIR, 2018)
This investigation aimed to reveal a mechanism of how different road projects' settings respond to macro-economic crisis. Qualitative and quantitative analyses were performed over a sample of 31 European road projects, in ...
Tehnologija građevinskih radova
(Građevinski fakultet u Beogradu, 2015)
Formiranje i značaj baze istorijskih podataka. Izrada post-projektne analize
(XXI Internacionalni simpozijum iz projektnog menadžmenta. Značaj projektnog menadžmenta. Prvih 30 godina YUPMA i 50 godina IPMA, 19-20 maj, Beograd, 2016)
U ovom radu je opisan značaj formiranja baze istorijskih podataka. Jedan od značaja se ogleda i u izradi post-projektne analize gde baza istorijskih podataka predstavlja gradivnu literaturu. Usled nedostatka standardne ...
Database for management of concrete batch plant work / Baza podataka za upravljanje radom fabrike betona
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2015)
A relational database that is designed and implemented for use in one concrete batch plant, with maximal production 30 m3/h, is presented in this paper. The database is developed using programming package Microsoft Access ...
Data-Driven Housing Damage and Repair Cost Prediction Framework Based on The 2010 Kraljevo Earthquake Data
(16th World Conference on Earthquake Engineering (16WCEE), 2017)
This paper presents an earthquake damage and repair cost prediction framework for individual residential buildings and portfolios of residential buildings in a municipal area in a region where the seismological networks ...