Primena metode za analizu kašnjenja na projektu sa studijom slučaja
(15. kongres Društva građevinskih konstruktera Srbije, Zlatibor, 6-8. 9. 2018, 2018)
Vreme za izvođenje radova je parametar koji je od suštinskog značaja i za izvođača i za investitora. Za vlasnika projekta to je izgubljeni profit koji proizilazi iz nemogućnosti eksploatacije objekta u planiranom roku, dok ...
Izbor hidroizolacije za zaštitu podzemnih konstrukcija korišćenjem AHP metode višekriterijumske optimizacije / SELECTION OF WATERPROOFING FOR PROTECTION OF UNDERGROUND STRUCTURES USING THE AHP METHOD
(Građevinski fakultet u Subotici, 2018)
Hydro-insulating materials serve not only to prevent the water penetration in
a building but to protect it from its harmful influence. The bad water influence on a
building is second in a row, just after the fire, and ...
2010 Kraljevo Earthquake Recovery Process Metrics Derived from Recorded Reconstruction Data
(16th European Conference on Earthquake Engineering, 2018)
Earthquake resilience starts with a sudden drop of performance when an earthquake strikes followed by a relatively long recovery phase. The dynamics and volume of investment directly affect the rate and level of recovery. ...
Ex post analysis of road projects: resilience to crisis
(Editorial Board EJTIR, 2018)
This investigation aimed to reveal a mechanism of how different road projects' settings respond to macro-economic crisis. Qualitative and quantitative analyses were performed over a sample of 31 European road projects, in ...
ODŠTETNI ZAHTEVI NA GRAĐEVINSKIM PROJEKTIMA – KVANTIFIKACIJA I PREVENCIJA / CLAIMS ON CONSTRUCTION PROJECTS – QUANTIFICATION AND PREVENTION
(Contemporary Construction Practice 2018, 2018)
Odštetni zahtevi predstavljaju veoma značajnu temu zato što njihova novčana vrednost može biti vrlo velika dok kvantifikacija nije egzaktna i kreće se u praksi u rasponu 1:3 u zavisnosti od primenjenih metoda koje su redom ...
Establishment of a Quality Control Plan - WG3 / Establishment of a Quality Control Plan - WG3
(TU1406 - Quality specifications for roadway bridges, standardization at a European level (BridgeSpec), 2018)
There is a broad consensus that the benefits of road infrastructure for the society cannot be overestimated. The investments in road infrastructure raise the growth potential of a national economy, which can be fully ...
Sampling and Machine Learning Methods for a Rapid Earthquake Loss Assessment System
(11th National Conference on Earthquake Engineering, 2018)
Rapid earthquake damage and loss assessment is crucial both for insuring the safety of inhabitants in the immediate aftermath of an earthquake and for the recovery of the stricken communities in the long run. This paper ...
Proračun koeficijenta korišćenja radnog vremena
(INDIS, 2018)
Koeficijent korišćenja radnog vremena (Kv) je jedan od najznačajnijih redukcionih koeficijenata pri proračunu učinka građevinskih mašina. Takođe, od svih redukcionih koeficijenata, njega je najteže predvideti. Da bi se ...