Construction technology and quality control of works on Atlas Capital Center / Tehnologija građenja i kontrola kvaliteta radova na primjeru objekta Atlas Capital Center
(Univerzitet u Beogradu - Fakultet organizacionih nauka, Beograd, 2012)
With the arrival of foreign investors in Montenegro, a need for application of FIDIC international conditions of contracts emerged. These conditions define in detail the rights and obligations of the contractual parties ...
Application of multiple criteria goal programming for solving some management and production problems / Primena višekriterijumskog ciljnog programiranja za rešavanje nekih problema menadžmenta i proizvodnje
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2012)
One method for solving multiple criteria fractional goal programming problem is proposed in this paper. In this method are introduced deviational variables that express increases or decreases of objective functions related ...
An approach and software for analysis of financial and economic risks in feasibility study preparation / Pristup i računarski program za analizu finansijskih i ekonomskih rizika pri izradi studije opravdanosti
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2013)
Risk is defined as an uncertain event or a condition that, if occurs, could affect project goals. In recent literature the importance of studying uncertainty is underlined, especially in early project phases. In this paper, ...
Application of particle swarms for project time-cost optimization
(Union of Croatian Civil Engineers and Technicians, 2014)
The time-cost optimization of a construction project, as related to the costs of its activities and the total project realization costs, is considered in this paper. Direct and indirect costs, durations of all activities, ...
Work cycle based scheduling
(Croatian Association of Civil Engineers, 2013)
The paper proposes a new approach to short-term scheduling based on spatial and technological cycles, continuous crew flows and daily scheduling, named WCBS (Work Cycle Based Scheduling). Application of WCBS is shown on a ...
Investment strategy for ensuring quality of finishing works on residential buildings
(Union of Croatian Civil Engineers and Technicians, 2015)
The relationship between the quality of finishing works, costs, market value, and profit, is presented and explained for residential buildings. The results show that the higher quality of finishing works increases profit ...
Providing answers to questions from automatically collected web pages for intelligent decision making in the construction sector
(Journal of Computing in Civil Engineering, 2008)
The construction sector is notorious for the dichotomy between (a) its intensive use of information in its decision-making processes and (b) its limited access to, and insufficient use of, the pertinent information that ...
Elementarni model za analizu i procenu troškova u građevinarstvu / Elemental Model for Cost Analysis and Estimation in Construction
(Savez građevinskih inženjera i tehničara Srbije, 1997)
U radu su kratko navedeni principi i procedure procene troškova u građevinarstvu. Posebno je ukazano na značaj rane procene troškova, koja veoma mnogo utiče na poslovnu odluku o ozbiljnijem angažovanju na projektu. Kao ...
Procena čvrstoće betona pri pritisku, korišćenjem različitih funkcija zrelosti betona: primer iz prakse / Assesment of concrete compressive strength using different maturity functions: case study
(Građevinski materijali i konstrukcije, 2018)
Čvrstoća pri pritisku jeste svojstvo koje je veoma značajno u građevinarstvu, te postoji izražena potreba da se razviju metode za praćenje prirasta čvrstoće pri pritisku betona u konstrukciji. Prema zakonskim propisima ...