Претраживање
Приказ резултата 31-40 од 66
Particle swarm optimization / Optimizacija pomoću članova rojeva
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2008)
In this work is presented one newer method for optimization of continuous functions which belongs to the heuristic stochastic methods, i.e. to the methods of so called swarm intelligence. This method is mathematically and ...
Implementing a detailed estimation model on housing project prefeasibility studies / Primena detaljnog modela procene za potrebe izrade predinvesticionih studija za projekte izgradnje stambeno-poslovnih objekata
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2010)
In this paper, a new approach is presented for the purpose of making prefeasibility studies. It is based on the detailed estimation of costs and durations even though there is no design present at the beginning of the ...
A sustainability analysis of an incineration project in Serbia
(Waste Management & Research, 2013)
The only option for municipal solid waste (MSW) treatment adopted so far in Serbia is landfilling. Similarly to other south-eastern European countries, Serbia is not recovering any energy from MSW. Fifty percent of electricity ...
Human resource performance measurement framework for construction projects and companies
(Faculty of Mechanical Engineering in Slavonski Brod, Faculty of Electrical Engineering in Osijek, Faculty of Civil Engineering in Osijek, 2014)
A new approach for measuring the performance of employees in construction companies is presented. Two different methods are proposed. For employees directly engaged on a project, performance is measured by using different ...
Vulnerability Assessment of Bridges Exposed to Scour
(Transportation Research Record, 2013)
To improve the allocation of funds for the maintenance and risk mitigation of transportation infrastructure, there is a dire need for a simplified, yet sufficiently accurate, methodology to estimate bridge vulnerability ...
Methods of calculating depreciation expenses of construction machinery / Metode proračuna troškova depresijacija građevinskih mašina
(Institut za istraživanja i projektovanja u privredi, Beograd, 2012)
Depreciation expenses represent a significant part of total expenses of construction machinery. Precise calculation of depreciation expenses is often difficult or impossible. Straight line method of depreciation, which is ...
Building a Construction Project Key-Phrase Network from Unstructured Text Documents
(American Society of Civil Engineers (ASCE), 2017)
During a construction project lifecycle, an extensive corpus of unstructured or semistructured text documents is generated. The nature of unstructured sources impedes users' acquisition, analysis, and reuse of relevant ...
Ex post analysis of road projects: resilience to crisis
(Editorial Board EJTIR, 2018)
This investigation aimed to reveal a mechanism of how different road projects' settings respond to macro-economic crisis. Qualitative and quantitative analyses were performed over a sample of 31 European road projects, in ...
Cost-oriented analysis of fibre reinforced concrete column-supported flat slabs construction
(Journal of Building Engineering, 2022)
Fibre reinforced concrete (FRC) is increasingly being used in elements with high structural responsibility, the constructed FRC column-supported flat slabs (CSFSs, hereinafter) with partial or even total substitution of ...
Genetic algorithms for assigning tasks to construction machine operators / Genetski algoritmi za rasporedivanje rukovatelja gradevinskih strojeva
(Croatian Association of Civil Engineers, 2011)
The authors describe the methodology for using genetic algorithms in solving problems of optimum assignment of tasks to construction machinery operators, aimed at achieving maximum efficiency. A special emphasis is placed ...