Претраживање
Приказ резултата 1-10 од 22
Productivity planning and control on construction projects / Planiranje i kontrola produktivnosti na građevinskim projektima
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2015)
In this paper, traditional as well as contemporary approaches to productivity planning and control are analyzed and potential improvements are suggested. A new approach is proposed. It is based on: applying separate measures ...
Optimalna politika održavanja drumskih mostova u Srbiji
(Put i saobraćaj, 2015)
Detecting Concepts in Construction Project Documents using Statistical Measures for Semantic Similarity
(Civil-Comp Press, 2015)
This paper addresses the problem of automatic concept detection in a construction project documentation with the aim of increasing the efficiency of information retrieval for all stakeholders in real-time in cases when ...
Analysis of the embodied energy and the CO2 emission in construction process of a bridge structure from the aspect of sustainability / Analiza vezane energije i emisije CO2 za izvođenje mostovske konstrukcije sa stanovišta održivosti
(Društvo za ispitivanje i istraživanje materijala i konstrukcija Srbije, Beograd, 2015)
This paper presents a comparative analysis of embodied energy and CO2 emission, in the construction process of three bridge structures. Analyzed structures are prestressed concrete bridges with different structural systems ...
Analiza i rangiranje kvaliteta izvora tehnoloških informacija u građevinarstvu
(INDIS, 2015)
Za kvalitetno planiranje i upravljanje građevinskim projektima неопходно је обезбедити relevantne i kvalitetne izvore tehnoloških informacija. U radu je prikazan jedan od mogućih pristupa analizi postojećih izvora tehnoloških ...
Current Serbian design codes: Transferring from a deterministic to a semi- probabilistic approach / Trenutni srpski propisi za proračun - prelazak sa determinističkog na polu-probabilistički pristup
(Savez inženjera i tehničara Srbije, Beograd, 2015)
The Serbian design code for reinforced concrete structures is somewhat out-of-date in its approach to structural design. In this paper, a study into the possible transition to a semi-probabilistic approach is presented. ...
Investment strategy for ensuring quality of finishing works on residential buildings
(Union of Croatian Civil Engineers and Technicians, 2015)
The relationship between the quality of finishing works, costs, market value, and profit, is presented and explained for residential buildings. The results show that the higher quality of finishing works increases profit ...
Eksperimentalno određivanje dinamičkih termičkih parametara zida zgrade metodom transfer matrica
(Univerzitet u Beogradu - Arhitektonski fakultet, Beograd, 2015)
Ground improvement - mixed in place (MIP) technique
(Macedonian Association of Structural Engineers, Skopje, 2015)
Tehnologija građevinskih radova
(Građevinski fakultet u Beogradu, 2015)