Formiranje i značaj baze istorijskih podataka. Izrada post-projektne analize
(XXI Internacionalni simpozijum iz projektnog menadžmenta. Značaj projektnog menadžmenta. Prvih 30 godina YUPMA i 50 godina IPMA, 19-20 maj, Beograd, 2016)
U ovom radu je opisan značaj formiranja baze istorijskih podataka. Jedan od značaja se ogleda i u izradi post-projektne analize gde baza istorijskih podataka predstavlja gradivnu literaturu. Usled nedostatka standardne ...
The Successful Delivery of Megaprojects: A Novel Research Method
(SAGE Publications Inc., 2017)
Megaprojects are often associated with poor delivery performance and poor benefits realization. This article provides a method of identifying, in a quantitative and rigorous manner, the characteristics related to project ...
Optimizacija izbora građevinskih mašina primenom AHP metode
(YUPMA - Udruženje za upravljanje projektima Srbije, 2011)
izbor građevinske mehanizacije ima klјučni značaj u realizaciji građevinskih projekata. U ovom radu je razmatran model izbora optimalne kombinacije mašina od unapred formiranih kombinacija i definisanih kriterijuma. Izbor ...
Fire-resistance prognostic model for reinforced concrete columns
(Croatian Association of Civil Engineers, 2012)
The prediction model used for defining fire resistance of reinforced concrete columns exposed to standard fire from all four sides is presented in the paper. The proposed model relies on the concept of artificial neural ...
Određivanje rezidualne vrednosti građevinskih mašina
(YUPMA - Udruženje za upravljanje projektima Srbije, 2015)
Rezidualna vrednost, ili vrednost polovne mašine definiše se kao cena za koju se korišćena mehanizacija može prodati na tržtu u određenom periodu. Ovo istraživanje ima za cilj da pomogne razvoju kreiranja regresionog modela ...
Method in planning construction machinery replacement
(Građevinski fakultet u Subotici, 2018)
One basic criteria for determining the replacement time of construction
machinery is based on the age , that is, the increase in operating costs of the machine
with time. The key factor which determines and justifies ...
Standard in project management - ANSI/PMI 99-001- 2008 brief presentation
(Univerzitet Crne Gore, Građevinski fakultet, 2012)
Project management has evolved over time, becoming the principal mean of dealing with change in modern organizations. Best practices have occurred as a result of business evolution and of practicing project management at ...
Metodology for construction equipment expense calculations used by the USACE / Metodologija proračuna troškova rada građevinskih mašina prema USACE
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2011)
Estimating expenses for Construction Equipment (CE) has a key impact on the success of civil engineering projects. The nature of these expenses is such that there is a need for a lot of assumptions during the estimating ...
Application of fuzzy ahp method based on eigenvalues for decision making in construction industry
(Faculty of Mechanical Engineering in Slavonski Brod, Faculty of Electrical Engineering in Osijek, Faculty of Civil Engineering in Osijek, 2016)
The Analytic Hierarchy Process (AHP) has found wide application for multicriteria decision making (MCDM) in various areas. In the paper is given a short survey of the AHP application for decision making in the construction ...
Selection optimization and allocation of earthmoving equipment on construction projects
(Belgrade, Serbia : University of Belgrade, Faculty of Organizational Sciences, 2019)
Cilj ovog istraživanja je izbor i alokacija mehanizacije na građevinskim projektima. Sa ovim problemom često se susreću građevinske firme u praksi kada konkurišu za velike građevinske projekte. Optimizacija izbora i alokacija ...