Claim management according to PMI standard
(XX Internacionalni simpozijum iz projektnog menadžmenta ''Značaj projektnog menadžmenta prvih 30 godina YUPMA i 50 godina IPMA'', 2016)
S obzirom na to da je svaki građevinski projekat unikatan, često dolazi do neslaganja između ugovorenih i planiranih parametara realizacije posla. Takva situacija obično dovodi do nastanka odštetnog zahteva. Izuzetno je ...
Estimating residual value of heavy construction equipment using ensemble learning
(http://cedb.asce.org, 2021)
Knowing the right moment for the sale of used heavy construction equipment is important information for every construction company. The proposed methodology uses ensemble machine learning techniques to estimate the price ...
The Successful Delivery of Megaprojects: A Novel Research Method
(SAGE Publications Inc., 2017)
Megaprojects are often associated with poor delivery performance and poor benefits realization. This article provides a method of identifying, in a quantitative and rigorous manner, the characteristics related to project ...
CFD simulation of thermal performances of building structure with expanded polystyrene (EPS) as thermal insulation
(Proceedings of 3rd International Conference on Electrical, Electronic and Computing Engineering IcETRAN 2016, Zlatibor, Serbia, June 13 – 16, 2016, 2016)
In this paper a three dimensional (3D), Computational Fluid Dynamics (CFD) simulation for indoor air flow and heat transfer in a single room was developed. The multi-layer structure building envelop, with expanded polystyrene ...
Highway Construction Cost Estimation: Identification and Analysis of the Owners’ Perceptions on Cost Drivers
(Department of Civil Engineering and Geodesy, Faculty of Technical Sciences, University of Novi Sad, 2023)
Highway construction cost estimates in the early stages of the project can be characterized as quite challenging and risky. Determination of the cost drivers on which the cost estimates are based requires a certain effort ...