Претраживање
Приказ резултата 1-10 од 41
Work cycle based scheduling
(Croatian Association of Civil Engineers, 2013)
The paper proposes a new approach to short-term scheduling based on spatial and technological cycles, continuous crew flows and daily scheduling, named WCBS (Work Cycle Based Scheduling). Application of WCBS is shown on a ...
Assessment of indirect costs due to highway link severance caused by reduction of bridge functional performance / Procena indirektnih troškova usled prekida putne veze zbog smanjenja funkcionalnih performansi mosta
(Srpsko društvo za puteve VIA-VITA, Beograd, 2014)
Stability and bearing capacity of the most important engineering structures of road sections (bridges, tunnels, viaducts, etc...) have enormous influence on the functional performance of the entire highway network. The ...
Productivity planning and control on construction projects / Planiranje i kontrola produktivnosti na građevinskim projektima
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2015)
In this paper, traditional as well as contemporary approaches to productivity planning and control are analyzed and potential improvements are suggested. A new approach is proposed. It is based on: applying separate measures ...
Optimalna politika održavanja drumskih mostova u Srbiji
(Put i saobraćaj, 2015)
Computational design and analysis of tensegrity structures
(Serbian architectural journal, 2018)
The paper presents the application of computational tools in design and analysis of integrally tensioned (tensegrity) structures. The shaping process of this specific type of spatial structures is determined by consideration ...
Određivanje in-situ koeficijenta trenja i imperfekcije kablova za prednaprezanje / Determination of the in situ coefficient of friction and imperfection of prestressing cables
(Građevinski materijali i konstrukcije, 2017)
Prestressing structural elements allows an increase in the spans of reinforced concrete structures. In the design and dimensioning of prestressed reinforced concrete structures it is necessary to know, that is to adopt a ...
Application of particle swarms for project time-cost optimization
(Union of Croatian Civil Engineers and Technicians, 2014)
The time-cost optimization of a construction project, as related to the costs of its activities and the total project realization costs, is considered in this paper. Direct and indirect costs, durations of all activities, ...
A computational method for laminated composite plates based on layerwise theory
(Elsevier Ltd, 2017)
This paper presents a new computational method for stress-strain analysis of simply supported rectangular cross-ply laminated composite plates subjected to transverse loads which was applied in the authors FORTRAN program ...
Construction technology and quality control of works on Atlas Capital Center / Tehnologija građenja i kontrola kvaliteta radova na primjeru objekta Atlas Capital Center
(Univerzitet u Beogradu - Fakultet organizacionih nauka, Beograd, 2012)
With the arrival of foreign investors in Montenegro, a need for application of FIDIC international conditions of contracts emerged. These conditions define in detail the rights and obligations of the contractual parties ...
Analysis of the embodied energy and the CO2 emission in construction process of a bridge structure from the aspect of sustainability / Analiza vezane energije i emisije CO2 za izvođenje mostovske konstrukcije sa stanovišta održivosti
(Društvo za ispitivanje i istraživanje materijala i konstrukcija Srbije, Beograd, 2015)
This paper presents a comparative analysis of embodied energy and CO2 emission, in the construction process of three bridge structures. Analyzed structures are prestressed concrete bridges with different structural systems ...