Претраживање
Приказ резултата 111-120 од 136
Primena metode za analizu kašnjenja na projektu sa studijom slučaja
(15. kongres Društva građevinskih konstruktera Srbije, Zlatibor, 6-8. 9. 2018, 2018)
Vreme za izvođenje radova je parametar koji je od suštinskog značaja i za izvođača i za investitora. Za vlasnika projekta to je izgubljeni profit koji proizilazi iz nemogućnosti eksploatacije objekta u planiranom roku, dok ...
Application of Fuzzy AHP Method for Choice of Objects for Maintenance and Reconstruction
(Savez građevinskih inženjera Srbije, 2015)
The choice of objects for maintenance and reconstruction using Fuzzy AHP (Analytic Hierarchy Process) method will be presented in this paper. This method, as one of the efficient methods for multicriteria decision making ...
Aplication of analitic hierachical process for choice of most acceptable structural system / Примена аналитичког хијерархијског процеса за избор најприхватљивијег конструкцијског система
(Univerzitet u Beogradu-Građevinski fakultet, Univerzitet Crne Gore-Građevinski fakultet, Akademija inženjerskih nauka Srbije, 2019)
У овоме раду је разматран вишекритеријумски избор конструкцијског система. Прво је објашњен Аналитички хирархијски процес (АХП), који је предложио Саати, за вишекритеријумско доношење одлука (МКДО) са прописаним алтернативама ...
Pouzdanost, raspoloživost i očekivani radni učinci sistema građevinskih mašina sa rasplinutim (fuzzy) ulaznim parametrima
(Institut za istraživanja i projektovanja u privredi, 2015)
U ovome radu se prikazuje procedura određivanja pouzdanosti, raspoloživosti i očekivanih radnih
učinaka sistema građevinskih mašina za izvođenje građevinskih radova (betonski radovi, zemljani radovi,
radovi u steni, ...
Управљање инфраструктурним пројектима
(Национална агенција за регионални развој, 2012)
Институт за менаџмент, технологију и информатику у грађевинарству Грађевинског факултета Универзитета у Београду је током 2011. и 2012. године одржао три семинара у договору са Националном агенцијом за регионални ...
Solving the Situation of Airport Bled by Digital Terrain Modeling Using the Software Package Rinoceros
(Belgrade: Faculty of Architecture in Belgrade; Serbian Society for Geometry and Graphics (SUGIG), 2010)
In the paper, we conducted an examination of topographical
conditions of the airport Bled location, using the digital terrain
modeling. A detailed analysis of the ambience around the airport is
done in relation to natural ...
Methodology of Design Organization Structure for Management Team at a Large Project
(Univerzitet Crne Gore, Građevinski fakultet, 2010)
The realization of large investment projects is an extremely complex undertaking both from technical and technological, as well as the organizational, legal and financial standpoint. Certainly that approach to the realization ...
Integrating BIM into construction project management education at the Faculty of Civil Engineering in Belgrade
(2019)
The development of information technology and communication means has a great
influence on the way construction projects are prepared and delivered. One of the latest trends
in digitalization in construction bringing ...
An economical optimization model for earthmoving equipment selection using Linear Programming approach
(Belgrade, Serbia : University of Belgrade, Faculty of Organizational Sciences, 2019)
Cilj ovog istraživanja je određivanje modela ekonomske optimizacije izbora građevinske mehanizacije za zemljane radove - iskop zemlje treće kategorije korišćenjem pristupa linearnog programiranja. U građevinskoj praksi ...
Selection optimization and allocation of earthmoving equipment on construction projects
(Belgrade, Serbia : University of Belgrade, Faculty of Organizational Sciences, 2019)
Cilj ovog istraživanja je izbor i alokacija mehanizacije na građevinskim projektima. Sa ovim problemom često se susreću građevinske firme u praksi kada konkurišu za velike građevinske projekte. Optimizacija izbora i alokacija ...