Претраживање
Приказ резултата 11-20 од 20
Ex post analysis of road projects: resilience to crisis
(Editorial Board EJTIR, 2018)
This investigation aimed to reveal a mechanism of how different road projects' settings respond to macro-economic crisis. Qualitative and quantitative analyses were performed over a sample of 31 European road projects, in ...
Quality Control оf Roadway Bridges - Reliability Assessment
(European Cooperation in Science & Technology (COST), 2018)
The elaboration of adequate quality control plans is one of the crucial tasks in bridge management
today. This is the topic of the ongoing COST TU1406 action, where it is proposed to control quality focus by means of
key ...
Izbor hidroizolacije za zaštitu podzemnih konstrukcija korišćenjem AHP metode višekriterijumske optimizacije / SELECTION OF WATERPROOFING FOR PROTECTION OF UNDERGROUND STRUCTURES USING THE AHP METHOD
(Građevinski fakultet u Subotici, 2018)
Hydro-insulating materials serve not only to prevent the water penetration in
a building but to protect it from its harmful influence. The bad water influence on a
building is second in a row, just after the fire, and ...
Uvođenje BIM-а u nastavu na Građevinskom fakultetu Univerziteta u Beogradu
(iNDiS, 2018)
Ogroman napredak informacionih tehnologija i sredstava komunikacije poslednjih decenija prožima mnoge sfere društva. U građevinskoj industriji, koju sve više zahvata proces digitalizacije, promene se odslikavaju u načinu ...
Proračun koeficijenta korišćenja radnog vremena
(INDIS, 2018)
Koeficijent korišćenja radnog vremena (Kv) je jedan od najznačajnijih redukcionih koeficijenata pri proračunu učinka građevinskih mašina. Takođe, od svih redukcionih koeficijenata, njega je najteže predvideti. Da bi se ...
Application of artificial neural networks for hydrological modelling in karst
(Union of Croatian Civil Engineers and Technicians, 2018)
The possibility of short-term water flow forecasting in a karst region is presented in this paper. Four state-of-the-art machine learning algorithms are used for the one day ahead forecasting: multi-layer perceptron neural ...
Primena metode za analizu kašnjenja na projektu sa studijom slučaja
(15. kongres Društva građevinskih konstruktera Srbije, Zlatibor, 6-8. 9. 2018, 2018)
Vreme za izvođenje radova je parametar koji je od suštinskog značaja i za izvođača i za investitora. Za vlasnika projekta to je izgubljeni profit koji proizilazi iz nemogućnosti eksploatacije objekta u planiranom roku, dok ...
Method in planning construction machinery replacement
(Građevinski fakultet u Subotici, 2018)
One basic criteria for determining the replacement time of construction
machinery is based on the age , that is, the increase in operating costs of the machine
with time. The key factor which determines and justifies ...
2010 Kraljevo Earthquake Recovery Process Metrics Derived from Recorded Reconstruction Data
(16th European Conference on Earthquake Engineering, 2018)
Earthquake resilience starts with a sudden drop of performance when an earthquake strikes followed by a relatively long recovery phase. The dynamics and volume of investment directly affect the rate and level of recovery. ...
Review of the method for extension of time on project with a case study
(14th International Scientific Conference “iNDiS 2018”, Novi Sad, November 21-23, 2018, 2018)
Tokom realiazacije projekta česta su kašnjenja od strane svih učesnika na projektu. Analiza kašnjenja ima za cilj ne samo kvantifikaciju ukupnog kašnjenja na projektu, već i determinaciju i raspodelu uticaja svakog od ...