Work cycle based scheduling
(Croatian Association of Civil Engineers, 2013)
The paper proposes a new approach to short-term scheduling based on spatial and technological cycles, continuous crew flows and daily scheduling, named WCBS (Work Cycle Based Scheduling). Application of WCBS is shown on a ...
Application of particle swarms for project time-cost optimization
(Union of Croatian Civil Engineers and Technicians, 2014)
The time-cost optimization of a construction project, as related to the costs of its activities and the total project realization costs, is considered in this paper. Direct and indirect costs, durations of all activities, ...
Ex post analysis of road projects: resilience to crisis
(Editorial Board EJTIR, 2018)
This investigation aimed to reveal a mechanism of how different road projects' settings respond to macro-economic crisis. Qualitative and quantitative analyses were performed over a sample of 31 European road projects, in ...
Genetic algorithms for assigning tasks to construction machine operators / Genetski algoritmi za rasporedivanje rukovatelja gradevinskih strojeva
(Croatian Association of Civil Engineers, 2011)
The authors describe the methodology for using genetic algorithms in solving problems of optimum assignment of tasks to construction machinery operators, aimed at achieving maximum efficiency. A special emphasis is placed ...