Претраживање
Приказ резултата 51-60 од 144
Temperature variation of "Bajina Bašta" dam between 1995-2015 / Temperature u brani i akumulaciji "Bajina Bašta" u periodu 1995-2015
(Građevinski fakultet, Subotica, 2016)
In this paper, the data for the observed temperatures (of the air, body of the dam and water in the reservoir), for "Bajina Bašta" Dam, during the 20-years period, are presented. The data were used to predict the unsteady ...
Quality control plans for road bridges
(Maintenance, Monitoring, Safety, Risk and Resilience of Bridges and Bridge Networks, 2016)
On the role of circular sections of quadric surfaces
(Innsbruck University Press, Innsbruck, 2014)
As a part of new advanced course curriculum of Descriptive geometry, in the Faculty of Civil engineering, creative 3D modeling of specific structures is included. These structures, inspired by contemporary architecture ...
Risks Affecting Traditional snd Sustainable Construction Project Goals
(Univerzitet Crne Gore, Građevinski fakultet, Podgorica, 2014)
The future of BIM and Bridge Management Systems
(International Association for Bridge and Structural Engineering (IABSE), 2019)
It is foreseeable that in not so distant future, Building Information Models (BIM) of both newly built and existing bridges will be available. These models can and will be included into the Bridge Management System (BMS) ...
Uticaj konstruktivnog sistema na troškove i trajanje građenja stambenih objekata / The influence of superstructure type on cost and duration of residential projects
(Gradjevinar, 2019)
The aim of the research is to investigate the impact of the superstructure system type on cost and duration of residential projects, as well as the identification and quantification of the key parameters that affect them ...
In Situ Experimental Determination of the Heat Transmittance of a Building Wall / Određivanje koeficijenta prolaza toplote kroz fasadni zid eksperimentalnim merenjem
(Građevinski fakultet, Subotica, 2018)
In this paper, results of a long term experimental in-situ measurement of air temperatures and heat fluxes trough a building wall surfaces, are presented. Indoor and outdoor measurements were carried out simultaneously ...
Quality control plans for road bridges
(CRC Press/Balkema, 2016)
The road authorities are bound to provide desired quality of service (QoS) to road users, or in more concrete terms fast, safe, comfortable and affordable travel. To this end, timely maintenance interventions are sometimes ...
Bridge quality control using Bayesian net
(International Association for Bridge and Structural Engineering (IABSE), 2019)
Bridge quality, as a measure of its compliance with the performance goals is tracked by the quality control plan. In other words, the quality could be understood as a comparison between performance indicators and performance ...