Претраживање
Приказ резултата 61-70 од 185
Information system for planning and control of project realization in construction / Informacioni sistem za planiranje i kontrolu realizacije projekata u građevinarstvu
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2005)
The information system for planning and control of project realization in construction industry is presented in this paper. For this information system the process and data model are described. The information system is ...
Risks Affecting Traditional snd Sustainable Construction Project Goals
(Univerzitet Crne Gore, Građevinski fakultet, Podgorica, 2014)
The future of BIM and Bridge Management Systems
(International Association for Bridge and Structural Engineering (IABSE), 2019)
It is foreseeable that in not so distant future, Building Information Models (BIM) of both newly built and existing bridges will be available. These models can and will be included into the Bridge Management System (BMS) ...
Uticaj konstruktivnog sistema na troškove i trajanje građenja stambenih objekata / The influence of superstructure type on cost and duration of residential projects
(Gradjevinar, 2019)
The aim of the research is to investigate the impact of the superstructure system type on cost and duration of residential projects, as well as the identification and quantification of the key parameters that affect them ...
In Situ Experimental Determination of the Heat Transmittance of a Building Wall / Određivanje koeficijenta prolaza toplote kroz fasadni zid eksperimentalnim merenjem
(Građevinski fakultet, Subotica, 2018)
In this paper, results of a long term experimental in-situ measurement of air temperatures and heat fluxes trough a building wall surfaces, are presented. Indoor and outdoor measurements were carried out simultaneously ...
Vremenska distribucija uzroka kašnjenja kao nov pristup otkrivanju baznih uzroka kašnjenja / Temporal distribution of causes of delay as a new approach to discovering the root causes of delay
(27th International project management congress, Vrnjačka Banja, 8-10 June, 2023, 2023)
Građevinski projekti su jedinstveni, dinamični i složeni. Karakteriše ih multidisciplinarno okruženje i veliki broj učesnika koji proizvode značajan obim podataka. Ovo su samo neki od razloga zašto građevinski projekti ne ...
Quality control plans for road bridges
(CRC Press/Balkema, 2016)
The road authorities are bound to provide desired quality of service (QoS) to road users, or in more concrete terms fast, safe, comfortable and affordable travel. To this end, timely maintenance interventions are sometimes ...
Bridge quality control using Bayesian net
(International Association for Bridge and Structural Engineering (IABSE), 2019)
Bridge quality, as a measure of its compliance with the performance goals is tracked by the quality control plan. In other words, the quality could be understood as a comparison between performance indicators and performance ...
Ontologies as the Key for Common Understanding of Infrastructure Assets
(Springer, 2022)
Infrastructure assets around the world are managed using Infrastructure Asset Management Systems (IAMSs). Although powerful and comprehensive, these systems poorly describe the asset’s geometry. Building Information Models ...