Search
Now showing items 31-40 of 48
Implementing a detailed estimation model on housing project prefeasibility studies / Primena detaljnog modela procene za potrebe izrade predinvesticionih studija za projekte izgradnje stambeno-poslovnih objekata
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2010)
In this paper, a new approach is presented for the purpose of making prefeasibility studies. It is based on the detailed estimation of costs and durations even though there is no design present at the beginning of the ...
Superelevation ramp design / Prostorno oblikovanje rampe za nadvišenje spoljne šine
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2010)
This paper presents general criteria for deriving a geometric shape for the transition curve and superelevation ramp, based on kinematic analysis of railway vehicle movement. According to European standard (ENV 13803-1) ...
Eurocode 6: Masonry structures / Evrokod 6 - zidane konstrukcije
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2010)
A general concept of Eurocode 6 - Design of Masonry Structures, as European standard which deals with basic problems of masonry structures, is presented in this paper. Special attention is dedicated to Chapter 3 of the ...
Information system model of construction company / Model informacionog sistema građevinskog preduzeća
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2000)
Information system model of construction company is considered in this paper. At the beginning, the importance of information system is emphasized. The special attention is paid to information system in construction company. ...
Information technology application in construction industry / Primena informacionih tehnologija u građevinarstvu
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2004)
In this paper information technology application in construction industry is analyzed. New technology application gives new possibilities but makes new problems. Main characteristics of construction industry are emphasized ...
Information technology application planning on project in construction industry / Planiranje primene informacionih tehnologija na projektima u građevinarstvu
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2005)
Strategies for information technology application on construction project are analyzed in this paper. Construction industry and construction firms are specific, so strategies have to correspond to them. Planning problems, ...
Railway transport competitiveness - Ecological aspect
(Izgradnja, 2015)
Geometry of twisted surfaces applied on horizontal communications in architecture / Geometrija spiralnih površi primenjena na horizontalne komunikacije u arhitekturi
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2013)
Contemporary technologies and materials continuously challenge structural designers, as well as architects, to achieve unique applications of various geometric surfaces. Twisted structures are actual and numerous in building ...
Design of circular composite CFT columns according to Eurocode 4 / Analiza nosivosti kružnih CFT stubova prema Evrokodu 4
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2013)
This paper presents a simplified method for calculation of bearing capacity of composite columns according to the European standard for the calculation of composite steel and concrete structures - Eurocode 4. Resistance ...
Metodology for construction equipment expense calculations used by the USACE / Metodologija proračuna troškova rada građevinskih mašina prema USACE
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2011)
Estimating expenses for Construction Equipment (CE) has a key impact on the success of civil engineering projects. The nature of these expenses is such that there is a need for a lot of assumptions during the estimating ...