Search
Now showing items 1-10 of 39
Roller compacted concrete (RCC) in dam construction, Part four: Construction, quality control and economic issues / Primena valjanog betona u izgradnji brana, IV deo - građenje, kontrola kvaliteta i ekonomski aspekti
(Jugoslovensko društvo za odvodnjavanje i navodnjavanje, Beograd, 2005)
The last of the four-paper serial on RCC dams refers to construction, quality-control and economic issues. The first part deals with the most important construction features, such as: concrete preparation, transportation, ...
Water distribution system model calibration using genetic algorithm / Kalibracija matematičkih modela vodovodnih sistema primenom genetskog algoritma
(Jugoslovensko društvo za odvodnjavanje i navodnjavanje, Beograd, 2008)
Model calibration is an important step in the modelling of water distribution systems. Since calibration is a process of adjusting model parameters so that model results fit best the measured data, it becomes a complex ...
Physical methods for waste water treatment: The use of freeze/thaw method with the assistance of microwave radiation for oily water treatment / Fizičke metode za prečišćavanje otpadnih voda - primena metode naizmeničnog mržnjenja i hlađenja i mikrotalasnog zagrevanja za obradu zauljenih voda
(Jugoslovensko društvo za odvodnjavanje i navodnjavanje, Beograd, 2005)
The main sources of oily waste water are oil- refineries, metal industry and food industry. Any technological process that uses emulsions has to take into consideration also the treatment of the used emulsions. The ultimate ...
Uncertainties in flood frequency estimation by partial duration series / Neizvesnosti u analizi velikih voda metodom parcijalnih serija
(Jugoslovensko društvo za odvodnjavanje i navodnjavanje, Beograd, 2006)
In hydrologic practice, flood frequency analysis is usually based on fitting a theoretical distribution to observed data series. Flood frequency analysis in hydrologic practice is essentially based on fitting of a theoretical ...
Stochastic approach to flood damage assessment / Stohastički pristup u određivanju šteta od poplava
(Jugoslovensko društvo za odvodnjavanje i navodnjavanje, Beograd, 2008)
This article deals with deterministic and stochastic approaches to assess the expected annual flood damages. Each approach is illustrated by a case study pertaining to floods at different sections of the Tamnava river in ...
Flood risk mapping / Kartiranje rizika od poplava
(Jugoslovensko društvo za odvodnjavanje i navodnjavanje, Beograd, 2009)
The paper considers the methodology for the mapping flood zones, flood damages and flood risk. The emphasis is on the development of synthetic flood damage functions, used for the determination of the expected annual ...
2D modelling of water quality in bays / Modeliranje kvaliteta vode u zalivu primenom modela ravanskog tečenja
(Jugoslovensko društvo za odvodnjavanje i navodnjavanje, Beograd, 2007)
Contamination of river waters in terms of scale, intensity, and duration cause such severe problems that application of conventional engineering methods for environmental remediation projects is no longer adequate, and ...
Modelling of water regime in karst / Modeliranje vodnih režima u karstu
(Jugoslovensko društvo za odvodnjavanje i navodnjavanje, Beograd, 2005)
Underground flow regime in karst areas completely differs from flow in intergranular aquifers. Hydraulically, this flow can be better described as a system of reservoirs and pipes with flow under pressure and with free ...
An example of hydraulic controllability improvement in water treatment plant / Jedan primer poboljšanja hidrauličke upravljivosti sistema za prečišćavanje vode
(Jugoslovensko društvo za odvodnjavanje i navodnjavanje, Beograd, 2004)
Water treatment plant "Štrand" consists of 24 filtration fields placed in two filtering plants, "Old" and "New". Filtering plants are supplied with water from two aeration tanks by pressurized pipeline. Present state of ...
Određivanje garantovanih ekoloških protoka
(Jugoslovensko društvo za odvodnjavanje i navodnjavanje, 2000)
Jedna od ključnih projektnih odluka pri planiranju akumulacija je koliki garantovani ekološki protok odabrati, kao obavezno ispuštanje iz akumulacije. Na bazi analize metoda koje se koriste u svetu za određivanje tog ...