Modified rainfall-runoff model for bifurcations caused by channels embedded in catchments
(Univerzitet u Kragujevcu - Fakultet inženjerskih nauka, Kragujevac, 2009)
The particularity of 'Vlasina' hydropower plants catchment is a big number of gravitation channels used to collect the water from neighboring natural catchments. The overall catchment size is thus increased, compared to ...
Uticajni činioci na rečnim ušćima sa izdignutim dnom pritoke / Controls at river confluences with discordant beds
(Savez građevinskih inženjera Srbije - Beograd, 2011)
U ovom radu se pomoću modela prostornog tečenja ispituje uticaj četiri izabrana činioca na hidrodinamiku ušća sa izdignutim dnom pritoke. To su: ugao uliva 'alfa', odnos sila inercije reke i pritoke MR, odnos [irina korita ...
Hydro-meteorological data quality assurance and improvement
(Univerzitet u Kragujevcu - Fakultet inženjerskih nauka, Kragujevac, 2009)
Advances in measurement equipment and data transfer enabled easy and economic automatic monitoring of various hydro-meteorological variables. The main characteristic of such automatic monitoring systems is that they do not ...
New method for complex water resources systems reliability evaluation / Novi pristupi pri određivanju pouzdanosti složenih vodoprivrednih sistema pod pritiskom
(Savez građevinskih inženjera Srbije, Beograd, 2011)
A new methodology for water resources systems reliability evaluation is presented. The proposed methodology considers both: mechanical reliability (probability of pipe failure) and reliability of hydraulic parameters in ...
SWAT-based runoff modeling in complex catchment areas: Theoretical background and numerical procedures
(Univerzitet u Kragujevcu - Fakultet inženjerskih nauka, Kragujevac, 2009)
This paper shows the structure of the SWAT-based model used in modeling of the 'rainfallrunoff' process. The SWAT model is hydro-dynamic and physically-based model for application in complex and large basins. Model inputs ...
Controls at river confluences with discordant beds / Uticajni činioci na rečnim ušćima sa izdignutim dnom pritoke
(Savez građevinskih inženjera Srbije, Beograd, 2012)
The role of four parameters that are controlling river confluence hydrodynamics at discordant beds confluences is investigated using 3D numerical model. These are: the junction angle α, the momentum-flux ratio between the ...
Municipal wastewater treatment in republic of Serbia: Present state and the perspectives / Prečišćavanje gradskih otpadnih voda u Republici Srbiji - stanje i perspektive
(Savez građevinskih inženjera Srbije, Beograd, 2010)
This paper presents an overview of municipal wastewater and sludge treatment methods. Procedure for determination of input wastewater loads has been described, as well as requirements that should be fulfilled to establish ...
Novi pristup pri određivanju pouzdanosti složenih vodoprivrednih sistema / New Method for Complex Water Resources Systems Reliability Evaluation
(Savez građevinskih inženjera Srbije, 2011)
U radu je prikazan nov pristup pri određivanju pouzdanosti složenih vodoprivrednih sistema pod pritiskom. Ovaj pristup podrazumeva da se pored pouzdanosti mehaničkih karakteristika elemenata, uzima u obzir i pouzdanost ...
DEM-based GIS algorithms for automatic creation of hydrological models data
(Univerzitet u Kragujevcu - Fakultet inženjerskih nauka, Kragujevac, 2009)
In this paper the authors discuss the Digital Elevation Model (DEM) based GIS algorithms, applicable for automatic creation of input data needed by hydrological models. The expected source of DEM data are standard digital ...