Претраживање
Приказ резултата 41-50 од 199
Assessing the financial feasibility of road concessions involving tolling and availability payments
(Transportation Research Board, Washington, 2017)
In a road concession, the sources of revenue to the private partner (or concessionaire) may include (i) the road users (e.g., tolling), (ii) the government (e.g. through availability payments), and (iii) both road users ...
Rail defects due to rolling contact fatigue / Šinski defekti usled zamora materijala
(Društvo za ispitivanje i istraživanje materijala i konstrukcija Srbije, Beograd, 2011)
Dynamic load on modern railways is increasing with speed, traffic and axle load. Defects due to rolling contact fatigue are becoming more expressed because of high wheel/rail contact stress. Rail grinding removes the ...
Harmonization of track alignment design parameters / Harmonizacija parametara trase železničke pruge
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2014)
This paper presents a process of harmonization of technical regulations in the Railway applications field in the Republic of Serbia. The content of standard SRPS EN 13803-1:2010 Railway applications - Track - Track alignment ...
Integration of material-science based performance models into PMS
(Institut Francais des Sciences et Technologies des Transports, de l'Aménagement et des Réseaux (IFSTTAR),, 2014)
The integration of material-science based performance models obtained from laboratory performance testing and modelling into life-cycle-assessment of road pavements is a future oriented approach for the improvement of ...
Permanent deformation of rubber modified asphalt mixtures
(Univerzitet Crne Gore, Građevinski fakultet, Podgorica, 2014)
Valuing an option to abandon a PPP toll road project
(Institut Francais des Sciences et Technologies des Transports, de l'Aménagement et des Réseaux (IFSTTAR),, 2014)
Public-Private Partnerships (PPPs) are used worldwide as a method. History of PPP transportation projects such as toll assessment process of PPP projects has that may occur over a longer time horizon in a more realistic ...
Railway/Road Level Crossing Design - Aspect of Safety and Environment
(Springer Verlag, 2018)
At the railway/road level crossings, two essentially different modes of transport intersect, both with a variety of vehicle performance parameters and traffic organization rules. Level crossing presents a collision zone ...
Primena ivičnjaka na vangradskoj i gradskoj putnoj mreži
(Srpsko društvo za puteve "Via Vita", Beograd, 2016)
Accessible railway platforms - Czech and Serbian design experience and recommendations
(Faculty of Mechanical Engineering, Niš, 2018)
Accessible railway platforms are an important part of modern railway infrastructure. Accessibility for all passenger categories, including people with reduced mobility (PRM), is one of basic and mandatory requirements for ...
3d control of obstacles in airport location studies
(CRC Press/Balkema, 2017)
While looking for a potential site of a new airport, meteorological and environmental analyses, as well as navigational analyses, are all of the ultimate importance. Potential airport location failing to pass any of these ...