Application of AHP and WoE methods for landslide susceptibility assessment on Krupanj municipality / Primena AHP i WoE metode u proceni podložnosti terena na kliženje za područje opštine Krupanj
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2017)
This paper is an example of landslide susceptibility assessment in Krupanj municipality in western Serbia, using two different multicriteria methods: Analytical Hierarchy Process (AHP) and Weight of Evidence (WoE). AHP is ...
3D analysis of tunnel lining - rock mass interaction, II: Effect of construction process simulation and parametric studies / 3D analiza interakcije tunelske obloge i stenske mase, II - efekat simulacije procesa izgradnje i parametarske studije
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2004)
For correct evaluation of stresses and deformations in tunnel lining and rock mass, it is necessary to use 3D numerical models. 3D FEM numerical modeling of tunnel driving has been described in Part I along with a presentation ...
3D analysis of tunnel lining - rock mass interaction, I: Numerical modelling / 3D analiza interakcije tunelske obloge i stenske mase, I - numeričko modeliranje
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2004)
In the analysis of tunnel lining - rock mass interaction, it is essential to consider partial stress release at the tunnel face, i.e. deformation of the tunnel walling that occurs before the application of the lining. ...