Pretraživanje
Prikaz rezultata 51-60 od 144
The future of BIM and Bridge Management Systems
(International Association for Bridge and Structural Engineering (IABSE), 2019)
It is foreseeable that in not so distant future, Building Information Models (BIM) of both newly built and existing bridges will be available. These models can and will be included into the Bridge Management System (BMS) ...
In Situ Experimental Determination of the Heat Transmittance of a Building Wall / Određivanje koeficijenta prolaza toplote kroz fasadni zid eksperimentalnim merenjem
(Građevinski fakultet, Subotica, 2018)
In this paper, results of a long term experimental in-situ measurement of air temperatures and heat fluxes trough a building wall surfaces, are presented. Indoor and outdoor measurements were carried out simultaneously ...
Quality control plans for road bridges
(CRC Press/Balkema, 2016)
The road authorities are bound to provide desired quality of service (QoS) to road users, or in more concrete terms fast, safe, comfortable and affordable travel. To this end, timely maintenance interventions are sometimes ...
Uticaj konstruktivnog sistema na troškove i trajanje građenja stambenih objekata / The influence of superstructure type on cost and duration of residential projects
(Gradjevinar, 2019)
The aim of the research is to investigate the impact of the superstructure system type on cost and duration of residential projects, as well as the identification and quantification of the key parameters that affect them ...
Risks Affecting Traditional snd Sustainable Construction Project Goals
(Univerzitet Crne Gore, Građevinski fakultet, Podgorica, 2014)
Quality Control оf Roadway Bridges - Reliability Assessment
(European Cooperation in Science & Technology (COST), 2018)
The elaboration of adequate quality control plans is one of the crucial tasks in bridge management
today. This is the topic of the ongoing COST TU1406 action, where it is proposed to control quality focus by means of
key ...
Implementing a detailed estimation model on housing project prefeasibility studies / Primena detaljnog modela procene za potrebe izrade predinvesticionih studija za projekte izgradnje stambeno-poslovnih objekata
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2010)
In this paper, a new approach is presented for the purpose of making prefeasibility studies. It is based on the detailed estimation of costs and durations even though there is no design present at the beginning of the ...
A sustainability analysis of an incineration project in Serbia
(Waste Management & Research, 2013)
The only option for municipal solid waste (MSW) treatment adopted so far in Serbia is landfilling. Similarly to other south-eastern European countries, Serbia is not recovering any energy from MSW. Fifty percent of electricity ...
Time-inhomogenous Markov chains in the bridge management
(Taylor and Francis - Balkema, 2014)
Available Bridge Management Systems vary in detail, but generally they comprise a deterioration model to predict condition development and a preservation optimization model to determine the optimum preservation policy. ...