Претраживање
Приказ резултата 31-40 од 70
Implementing a detailed estimation model on housing project prefeasibility studies / Primena detaljnog modela procene za potrebe izrade predinvesticionih studija za projekte izgradnje stambeno-poslovnih objekata
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2010)
In this paper, a new approach is presented for the purpose of making prefeasibility studies. It is based on the detailed estimation of costs and durations even though there is no design present at the beginning of the ...
A sustainability analysis of an incineration project in Serbia
(Waste Management & Research, 2013)
The only option for municipal solid waste (MSW) treatment adopted so far in Serbia is landfilling. Similarly to other south-eastern European countries, Serbia is not recovering any energy from MSW. Fifty percent of electricity ...
Human resource performance measurement framework for construction projects and companies
(Faculty of Mechanical Engineering in Slavonski Brod, Faculty of Electrical Engineering in Osijek, Faculty of Civil Engineering in Osijek, 2014)
A new approach for measuring the performance of employees in construction companies is presented. Two different methods are proposed. For employees directly engaged on a project, performance is measured by using different ...
Vulnerability Assessment of Bridges Exposed to Scour
(Transportation Research Record, 2013)
To improve the allocation of funds for the maintenance and risk mitigation of transportation infrastructure, there is a dire need for a simplified, yet sufficiently accurate, methodology to estimate bridge vulnerability ...
Methods of calculating depreciation expenses of construction machinery / Metode proračuna troškova depresijacija građevinskih mašina
(Institut za istraživanja i projektovanja u privredi, Beograd, 2012)
Depreciation expenses represent a significant part of total expenses of construction machinery. Precise calculation of depreciation expenses is often difficult or impossible. Straight line method of depreciation, which is ...
Ex post analysis of road projects: resilience to crisis
(Editorial Board EJTIR, 2018)
This investigation aimed to reveal a mechanism of how different road projects' settings respond to macro-economic crisis. Qualitative and quantitative analyses were performed over a sample of 31 European road projects, in ...
Estimating residual value of heavy construction equipment using ensemble learning
(http://cedb.asce.org, 2021)
Knowing the right moment for the sale of used heavy construction equipment is important information for every construction company. The proposed methodology uses ensemble machine learning techniques to estimate the price ...
Database for management of concrete batch plant work / Baza podataka za upravljanje radom fabrike betona
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2015)
A relational database that is designed and implemented for use in one concrete batch plant, with maximal production 30 m3/h, is presented in this paper. The database is developed using programming package Microsoft Access ...
Building a Construction Project Key-Phrase Network from Unstructured Text Documents
(American Society of Civil Engineers (ASCE), 2017)
During a construction project lifecycle, an extensive corpus of unstructured or semistructured text documents is generated. The nature of unstructured sources impedes users' acquisition, analysis, and reuse of relevant ...
Particle swarm optimization / Optimizacija pomoću članova rojeva
(Udruženje inženjera građevinarstva, geotehnike, arhitekture i urbanista "Izgradnja", Beograd, 2008)
In this work is presented one newer method for optimization of continuous functions which belongs to the heuristic stochastic methods, i.e. to the methods of so called swarm intelligence. This method is mathematically and ...